U. S. NUCLEAR REGULATORY COMMISSION OFFICE OF INSPECTION AND ENFORCEMENT
REGION I
Report No.
S0-134/79-01 Docket No.
50-134 License No.
R-61 Safeguards Group
Licensee:
Worcester Polytechnic Institute Worcester, Massachusetts 01609 Facility Name:
Worcester Polytechnic Institute Nuclear Facility Inspection At:
Worcester, Massachusetts Inspection Conducted:
September 5, 1979 Date of Last Material Control and Accounting Inspection:
January 30, 1976 Type of Inspection:
Unannounced Material Control & Accounting Inspectors:
b hme
/d-2 3-79 Robert J.(Summers, Auditoy V U date date date Q.
N Approved by:
, "
M4W
/o - 2 3 ~7 9 J. H. Joyner, Ahief, Nuclear Material Control date uppofV Section, Safeguards Branch Inspection Summary:
Area Inspected:
Material Control and Accounting The inspection involved 2 inspector-hours onsite by one NRC inspector and was begun during the regular hours.
Results:
The licensee was found to be in compliance with NRC requirements in the area examined.
1618 313
Region I Form 166
"12260 (August 1979)
7 9g
[
.
REPORT DETAILS 1.
Key Persons Contacted
- Professor L. C. Wilbur, Director, Nuclear Facility
- C. Bleakney, Nuclear Specialist
- Denotes those present at the e).it interview.
2.
Licensee Action on Previous Inspection Findings There were no items of noncompliance noted on the previous inspection.
(Report 76-01)
3.
Exit Interview The inspector met with licenst.e representatives (denoted in Paragraph 1)
at the conclusion of the inspection on September 5, 1979.
The inspector summarized the scope and findings of the inspection.
4.
Unresolved Items There were no unresolved items noted during the inspection.
5.
Independent Inspection Effort There was no independent inspection effort conducted during the inspection.
6.
MC 851028 - Material Control and Accounting No items of noncompliance noted.
The inspection results were attained through a review and evaluation of all phases of the licensee's material control and accounting program and disclosed that the licensee has met the applicable regulations.
The scope of the review is discussed below.
(a)
Inventory Practices - The licensee conducts annual inventories.
Most of the material is in the reactor pool (24 in core, 2 in storage)
but two elements are stored in locked boxes in the reactor room.
These two elements were verified by serial number and an item count was performed by the inspector on the core and hot storage. The most recent inventory (July 24, 1979), identical to the current inventory, was as follows:
License Authorized Limit Possession R-61 4000 grams U-235 as fuel elements 3704 grams 4 grams U-235 as fission counters
16 grams Pu as PuBe sources 15.9 grams 1618 314
-
..
(b) Records and Reports - An audit of the licensee's Form NRC-742's was performed for the inspection period December 31, 1975 to March 31, 1979.
The forms were reviewed for proper signature, timeliness, format and accuracy.
There were no problems noted.
There were no external transactions during the period.
(c) Reports on Production and/or Depletion - It was determined that the total loss of U-235 through burnup is less than a reportable quantity (one gram).
1618 315