IR 05000124/1981001

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Rept 50-124/81-01 Conducted on 810504.No Noncompliance Noted.Major Areas Inspected:Physical Security Plan Program.Insp Rept Withheld (Ref 10CFR2.790)
ML19350E452
Person / Time
Site: 05000124
Issue date: 06/15/1981
From: Robert Lewis
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To:
VIRGINIA POLYTECHNIC INSTITUTE & STATE UNIV., BLACKSB
References
NUDOCS 8106230087
Download: ML19350E452 (1)


Text

_

-_

,-

-

-

a

-

,

_.

.

9,bi$hh*$l}k' :

.., -...-.. -,.--.

t

~

.f*

%,

C

. 6i

  1. ^

l'

NUCLEAR REGULATORY COMMISSION

,

,

,

h E

REGION 11 a #

101 MARIETTA ST., N.W., sulTE 3100 ATLANTA, GEORGIA 30303 g

C)

i SA JUN 151981

[9f fi[Pf1btli _.D %

'

-\\

'

Qv,menswxwn(%

JUN 2 2 1981 *

Virginia Polytechnic Institute

-

Ji and State University

" " " h ATTN: Vice President of Administration Blacksburg, VA 24060 f

Gentlemen:

I

'

Subject: ' Report No. 50-124/81-01 This refers to the routine safeguards inspection conducted by Mr. B. L. Hall of this of fice on May 4,1981, of activities authorized by NRC License No. R-62 at

. Virginia Polytechnic Institute Reactor Laboratory facility and to the discussions of our findings held with Dr. Keith Furr, Director, Office of Health and Safety-Regulatory Programs, and Mr. Alan Curtner, Supervisor, Nuclear Reactor Labora-tory, at the conclusion of the inspection.

Areas examined.during this inspection included your physical security program as implemented under _ the provisions of Title 10, Code of Federal Regulations, Part 73, " Physical Protection of Plants and Materials", and the specific requirements of license conditions and your approved Security Plan. Within these areas, the inspection consisted of selective examinations of procedures and representative records, interviews with personnel, performance tests, and observations by the inspector.

Within the scope of this inspection, no violations or deviations were disclosed.

In accordance with Section 2.790(d) of the NRC's " Rules of Practice", Part 2, Title 10, Code of Federal Regulations, activities involving safeguards and security measures are exempt from public disclosure; therefore, the enclosed

.

report with the exception of the cover page, which is an inspection summary, will not be placed in the Public Document Room.

Should you have any questions concerning this letter, we will be glad to discuss them with you.

Sincerely,

.

g.c.

R. C.

ewis, Acting Director Division of Resident and Reactor Project Inspection Enclosures:

See Page 2

$

,

S* l

?IC623 0%~]

L

-

33--

r.. --.......... _..._.,