IR 05000122/2006014

From kanterella
Jump to navigation Jump to search
Insp Repts 50-546/85-01 & 50-547/85-01 on 850122-0614.No Violation or Deviation Noted.Major Areas Inspected:Maint of Equipment During Extensive Const Delay,Review of Implementing Procedures & Review of Quality Records
ML20127P211
Person / Time
Site: Marble Hill, 05000122
Issue date: 06/26/1985
From: Forney W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To:
Shared Package
ML20127P191 List:
References
50-546-85-01, 50-546-85-1, 50-547-85-01, 50-547-85-1, NUDOCS 8507020343
Download: ML20127P211 (3)


Text

__ _

.

.

U. S. NUCLEAR REGULATORY C0PMISSION

REGION III

Report No. 50-546/85001(DRP);50-547/85001(DRP)

Docket No. 50-546; 50-547 License No. CPPR-170; CPPR-171 Licensee: Public Service Indiana Post Office Box 190 New Washington, IN 47162 Facility Name: Marble Hill Nuclear Generating Statin, Units 1 and 2 Inspection at: Marble Hill Site, Jefferson County, IN Inspection Conducted: January 22 - June 14, 1985 Inspector: J. F. Schapker tg' ,

Approved By: M. lk%e Reactor Project Me ect on IA Date 6/[6 (

Inspection Summary Inspection during the period of January 22 - June 14, 1985 (Report No. 50-546/85001(DRP); 50-547/85001(DRP))

Areas Inspected: Routine, unannounced inspection by the resident inspector of maintenance of equipment during the extensive construction delay, including review of implementing procedures, and review of quality records. This inspection involved a total of 60 inspector-hours by one NRC inspector including 0 inspector-hours during off-shift Results: No violetions or deviations were identified, nor were any significant safety issues identified.

,

8507020343 850626 PDR ADOCK 05000546 G PDR

-. . - - - . .-

,

'

.

DETAILS 1. Persons Contacted Public Service Indiana

    • S. Sheilds, Senior Vice President, Nuclear Division
  • L. Nicodemus, Ouality Assurance Manager
  • D. Dedrick, Quality Assurance Audit fianager
  • F. Carchedi, Quality Engineering Manager
  • Denotes those present at the exit meetin **By teleco The inspector also contacted and interviewed other licensee and contractor personne . Request for Temination of the Construction Pemit On fiarch 1,1985, the licensee requested termination of Construction Pemits Nos. CPPR-170 and CFPR-171 for the Marble Hill Nuclear Generating Station (MHNGS), Units 1 and 2. All construction related activities were previously halted on January 3, 1984 Subsequent to this date the licensee revised their Quality Assurance Program (QAP) to maintain the site and equipment during the extended construction delay. This 0AP is currently active and will remain in force until the responsibilities associated with the Construction Permits are deemed to be satisfactorily accomplished by the licensee. The Office of Nuclear Reactor Regulation (NRR) is in the process of reviewing the licensee's request for temina-tion of the construction pemit. The Nuclear Regulatory Comission, Inspection and Enforcement Office, Region III, has elected to close the Resident Inspectors office at the MHNGS at this time. Periodic inspection will be performed as required by region based inspectors pending the cancellation of the Construction Permit . Observation of Work and Work Activities During Extensive Construction Delay The inspector nade periodic tcurs of various storage areas and plant safety-related areas. The inspector observed fire protection; covering and capping of mechanical and electrical equpment; heating devices energized on required equipment; maintenance of inert gas blankets and dehumidification system where required. General housekeeping and rodent control is adequate in the areas observed. Laydown yards appear tc be maintained so that materials are cribbed up and not in contact with the earth, caps on piping, electrical cable adequately protected, and periodic inspection of materials is being performe The inspector selected the following safety-related components and verified that adequate preventative maintenance is currently being performed to

,

ensure that design integrity will be maintained:

- _- _

- _ _ . - . _

- _ - .

. _ _ _ _ _ - .

.

..

Component Identification Location S. G. Snubber 2RC01BB Warehouse P3 R. C. Pump Motor 2RC01PD Warehouse P3 Main Steam Relief Valve 2RF013B Warehouse P3 A. O. Gate Valve ISH068 Warehouse P3 HVAC Fan OVA 02CC Warehouse P2 R. C. Pump Internals IRC01PA Warehouse P2 M. O. Gate Valve 2SI8802A Warehouse P2 M. O. Gate Valve 8AM88SBH Warehouse P2 Motor Control Center IAP93E Warehouse P4 D. G. Control Panel 2PLO7J Uarehouse P4 D. G. Air Start System 2DG015B Warehouse P4 Main Control Board 1 PM05J Warehouse P4 Computer Cabinet ICX01J Warehouse H Steam Generator 1RC01BB Containment 1 Accumulator 1SIO4TA Containment 1 M. O. Gate Valve ISI8808A Containment 1 A. O. Gate Valve ICV 8147 Containmnet 1 Steam Generator 2RC01BA Containment 2 Steam Generator 2RC01BC Containment 2 Pressurizer 2RY01S Containmnet 2 Hydrogen Recombiner 00G08SB Auxiliary Bld Let Down Heat Exchanger 2CV04AB Auxiliary Bldg.

'

Safety Injection Pump 2SIO1PA Auxiliary Bld The above components were observed to have adequate covering, internal preservation, fire protection and cleanliness preservation. Maintenance records were reviewed and found to be satisfactory. In addition the inspector performed periodic inspections of the permanent site Quality Assurance Records Vaults to assure the protection of the records are maintained in accordance with ANSI 45.2.9 requirement No violations or deviations were identifie Exit Interview The inspector net with applicant representatives (denoted in Paragraph 1)

throughout the inspection and at the conclusion of the inspection on June 14, 1985. The inspector summarized the scope and findings of the inspection activities. The inspector also discussed the likely informational content of the inspection report with regard to documents or processes reviewed by the inspector during the inspection. The applicant did not identify any such documents / processes as proprietar . . .-