O U. S. NUCLEAR REGUIATORY C0!OilSSION
OFFICE OF INSPECTION AND ENFORCE!ENT
.
REGION V
Report No.
50-106/80-01 Docket No.
50-106 License No.
R-31 Safeguards crcup Licensee:
Oregon State University Corvallis, Oregon 97331 Facility Na=e:
AGN-201 Inspection at:
Corvallis, Oregon ducted: February 26-27, 1980 Inspection co
O Inspectors:
Pg._ 6 Morrill, React'or Inspector Date Signed T ) Dun ~JLJ L 3/y/ga
J. D/. Car.lson, Reactor 19spector Date Signed Date Signed 8[
/C
^
Approved
34~
"D. M. Sty berg, Chie, Reactor Project Section 1 Date Signed
'
S u=a ry :
Insoection on February 26-27, 1980 (Report No. 50-106/80-01)
Areas Insoected: Routine unannounced inspection of operations, logs and records, procedures, requalification training, surveillance, and exadna-tion of the facility. This inspection involved two inspector-hours by two NRC inspectors.
Results: Of the six areas inspected, no items of noncompliance or devia-tions were identified.
.
.
.
RV Form 219 (2)
soosego
//f c
.
.
a.'
DETAILS 1.
Persons Contacted Princiole Licensee Employees Dr. C. H. Wang, Reactor Administrator
- Dr. J. C. Ringle, Chairman, Reactor Operations Committee Mir. T. V. Anderson, Reactor Supervisor
- Mr. A. G. Johnson, Radiation Center Health Physicist
- Denotes persons attending exit interview.
2.
General The reactor was operated on ten occssions f rom July 15 to December 12, 1974.
It was placed in a shutdown status shortly thereafter by removing the control rods and placing a cadmium slug in the glory hole.
It has not been operated since then. However, the nuclear instrumentation has been maintained operational and was being checked by the Reactor Supervisor. The licensee has received approval to deactivate the fa-cility.
The deactivation is tentatively set for the summer of 1980.
3.
Tour A tour of the facility disclosed that it was indeed in the shutdown condition as described above.
fluclear instrumentation appeared to be operating satisfactorily. Appropriate radiation controls were in effect at the facility.
4.
Records Records examined inclu,ded selective review of the operations log, and minutes of the Reactor'0perations Committee meetings. The examination of records disclosed that the reactor had remained shutdown and systems have been checked in accordance with the technical specifications since the last inspection.
5.
Exit Interview The inspector met with licensee representatives (denoted in Paragraph 1) at the conclusion of the inspection on February 27, 1980.
The in-spectors sumnarized the scope and findings of the inspection and ad-vised the licensee that no items of noncompliance or deviations were identi fied,