m
'
.
.
.
U. S. NUCLEAR REGULATORY COMMISSION
REGION III
s Report No. 50-087/85001(DRSS)
Docket No.50-087 License No. R-119 Safeguards Group II Licensee: Westinghouse Electric Corporation Westinghouse Nuclear Training Center 505 Shiloh Boulevard Zion, IL 60099 Facility Name: Westinghouse Nuclear Training Center Inspection At: Westinghouse Nuclear Training Center, Zion, IL Inspection Conducted:
April 8-11, 1985 onsite April 15, 1985 in Region III Office Type of Inspection:
Unannounced Physical Security Date of Previous Physical Security Inspection:
February 14-15, 1983 Inspectors:
%,1 @MO a gg,,g ggg G. L. Pirtle Date Physical Security Inspector b.i. hJ.
a gfg,f g p 8. Orouin Date
Physical Security Inspector Approved By: Q
- 'k A/ R. Cre~ed, Chief Date Tafeguards Section Inspection Summary Inspection on April 8-15, 1985 (Report No. 50-087/85001(DRSS))
Areas Inspected:
Included Security Organization; Use and Storage Area for SNM; Detection Devices and Procedures; Access Controls; Communications; Responso Procedures; and Lost Material Notification.
The inspection involved 55 inspector-hours by two NRC inspectors.
The inspection was begun during normal working hours.
Five of the fifty-five inspector-hours were completed during off-shift periods.
Results:
Four possible violations were noted in the areas inspected as listed below:
8505310305 85 h 7
[
%.0 PDR ADOCK
...-. o-r g
G
.
_. _.
tw
,
o
.
-
.
a.
Detection Devices and procedures:
Some alarm monitoring requirements were not being performed.
b.
Access Control:
Required personnel screening was not completed for one individual.
- c.
Access Control:.Two security-related keys, when not in use, were not controlled in accordance with Security Plan criteria.
w d.
Access Control:
Required combination changes for certain security-related locks were not made in a timely manner.
An unresolved. item pertaining to compensatory measures for certain alarm equipment outages was noted and will be sent to NRC, HQ for resolution.
Additionally, a concern was noted pertaining to the detection capability.
for an alarm system.
The licensee's initial immediate corrective actions for the apparent violations and area of concern appeared adequate.
(Details - 10 CFR 2.790(d) Information)
ATTACFCENT CONTAIHS
10 CFR 2.700(d) IRF0
.
.
.-
.
_
.
.
...
.. -
__ - _
.-
-