IR 05000087/1978007

From kanterella
Jump to navigation Jump to search
IE Insp Rept 50-087/78-07 on 781227-29.No Noncompliance Noted.Major Areas Inspected:Security Plan & Implementation Re Protection of Snm,Security Orgainzation.Details Withheld (Ref 10CFR2.790)
ML19273B028
Person / Time
Site: 05000087
Issue date: 01/19/1979
From: Christoffer G, Hind J, Howell J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To:
Shared Package
ML19273B026 List:
References
50-087-78-07, 50-87-78-7, NUDOCS 7902010362
Download: ML19273B028 (1)


Text

.

.

U.S. NUCLEAR REGULATORY COMMISSION OFFICE OF INSPECTION AND ENFORCEMENT

REGION III

.

.

Report No. 50-087/78-07 Docket No. 50-67 License No. R-199 Safeguards Group II A Licensee: Westinghouse Electric Corporation P. O. Box 41 505 Shiloh Boulevard Zion, IL 60099 Facility Name:

Nuclear Training Center Insoection At: Nuclear Training Reactor Site, Zion. Illinois Inspection Conducted: December 27-29, 1978

) hh

w

.

Inspectors:

M. Christoffer

  • / - / 9 -

~

,, l

, - -

I'.Y cnud

,

J. C. Herell

A4

'

. 6 #~

/!. f/7f

/

Approved By:

J. A. Hind, Chief Safeguards Branch Inspection Summary Inspection on December 27-29, 1978 (Recort No. 50-37/78-07)

Areas Inspected: Routine, unannounced inspection of the licensee's security plan and its implementation relative to the protection of SNM; security organization; acce.as control; alarm systems; keys, locks and hardware; communications; surveillance; procedures; security program review; and protection against radiological sabotage. Additionally, the inspectors reviewed the previously identified weaknesses and item of concern.

The inspection involved 24 inspector-hours on site by two NRC iraspectors.

Results: Of the eleven areas inspected, no apparent items of noncompliance were identified within the scope of the inspection.

(Details - Part 2.790(d) Information)

i 796 Aolo 36 A 1