U.S. NUCLEAR REGULATORY COMMISSION OFFICE OF INSPECTION AND ENFORCEMENT
REGION III
- .
.
Report No. 50-087/78-07 Docket No. 50-67 License No. R-199 Safeguards Group II A Licensee: Westinghouse Electric Corporation P. O. Box 41 505 Shiloh Boulevard Zion, IL 60099 Facility Name:
Nuclear Training Center Insoection At: Nuclear Training Reactor Site, Zion. Illinois Inspection Conducted: December 27-29, 1978
) hh
w
.
Inspectors:
M. Christoffer
- / - / 9 -
~
,, l
, - -
I'.Y cnud
,
J. C. Herell
A4
'
. 6 #~
/!. f/7f
/
Approved By:
J. A. Hind, Chief Safeguards Branch Inspection Summary Inspection on December 27-29, 1978 (Recort No. 50-37/78-07)
Areas Inspected: Routine, unannounced inspection of the licensee's security plan and its implementation relative to the protection of SNM; security organization; acce.as control; alarm systems; keys, locks and hardware; communications; surveillance; procedures; security program review; and protection against radiological sabotage. Additionally, the inspectors reviewed the previously identified weaknesses and item of concern.
The inspection involved 24 inspector-hours on site by two NRC iraspectors.
Results: Of the eleven areas inspected, no apparent items of noncompliance were identified within the scope of the inspection.
(Details - Part 2.790(d) Information)