Category:INSPECTION REPORT
MONTHYEARIR 05000083/20232012023-09-0505 September 2023 University of Florida – U.S. Nuclear Regulatory Commission Safety Inspection Report 05000083/2023201 IR 05000083/20232022023-08-28028 August 2023 University of Florida - U.S. Nuclear Regulatory Commission Security Inspection Report 05000083/2023202 (Public) IR 05000083/20222012023-02-0202 February 2023 University of Florida – U.S. Nuclear Regulatory Commission Routine Safety Inspection Report No. 05000083/2022201 IR 05000083/20212012021-06-11011 June 2021 University of Florida U.S. Nuclear Regulatory Commission Routine Inspection Report No. 05000083/2021201 IR 05000083/20202022021-02-0909 February 2021 University of Florida - U.S. Nuclear Regulatory Commission Routine Safety Inspection Report No. 05000083/2020202 IR 05000083/20192012019-09-18018 September 2019 University of Florida - U.S. Nuclear Regulatory Commission Routine Inspection Report 05000083/2019201 IR 05000083/20182012018-08-30030 August 2018 University of Florida & U.S. Nuclear Regulatory Commission Routine Inspection Report No. 50-083/2018-201 IR 05000083/20162022017-01-0404 January 2017 University of Florida - U.S. Nuclear Regulatory Commission Security Inspection Report No. 50-083/2016-202 ML16095A0952016-04-0606 April 2016 IR 05000083/2016201 - March 7-10, 2016, University of Florida IR 05000083/20122012012-02-24024 February 2012 IR 05000083-12-201 on January 30 Thru February 2, 2012 at the University of Florida - NRC Routine Inspection No. 50-083-12-201 IR 05000083/20122022012-02-24024 February 2012 IR 05000083-12-202 on January 30 Thru February 2, 2012 at the University of Florida - Transmittal Letter for NRC Security-Related IR 05000083/20112012011-06-0303 June 2011 IR 05000083-11-201, on April 4-7, 2011 at University of Florida - Severity Level IV and Notice of Violation IR 05000083/20102032010-09-15015 September 2010 IR 05000083-10-203, on August 17-19, 2010, University of Florida IR 05000083/20102012010-04-14014 April 2010 IR 05000083-10-201, on March 22-25 2010, University of Florida, Onsite Review of Selected Aspects of University of Florida'S (Licensee'S) Class II Research Reactor Safety Program Including: Organizational Structure & Staffing, Radiation Pro IR 05000083/20102022010-04-14014 April 2010 IR 05000083-10-202, on 03/22/2010 - 03/25/2010, Transmittal Letter of University of Florida, NRC Routine Security Inspection (Report Only OUO-SRI) IR 05000083/20072012007-02-0101 February 2007 IR 05000083-07-201, on 01/22-25/2007, University of Florida Test Reactor Facility IR 05000083/20062032006-11-22022 November 2006 NRC Inpsection Report No.0500083-06-203 and Notice of Violation, University of Florida IR 05000083/20062012006-02-17017 February 2006 IR 05000083-06-201, on 01/30-02/03/2006, University of Florida ML0510300342005-04-27027 April 2005 NRC Inspection Report No. 50-83/2005-201, Univ of Florida Test Reactor Facility, March 28-31, 2005 ML0200803612002-02-27027 February 2002 IR 05000083/2001-201, Univ. of Florida Test Reactor Facility, Inspection on 11/19-21/2002 Related to Organization & Staffing, Review & Audit Functions, Plant Operations, Procedures, Maintenance & Surveillance, Safeguards & Security Program IR 05000083/19982021998-11-0202 November 1998 Insp Rept 50-083/98-202 on 981006-09.No Violations Noted. Major Areas Inspected:Review of Selected Conditions & Records Since Last Insp & Verification of Corrective Actions Previously Committed to by Licensee IR 05000083/19982011998-10-0101 October 1998 Insp Rept 50-083/98-201 on 980908-10.No Violations Noted. Major Areas Inspected:Review of Selected Conditions & Records Since Last Insp & Review of Respiratory Protection Program IR 05000083/19972011997-09-0909 September 1997 Insp Rept 50-083/97-201 on 970630-0703.No Violations Noted. Major Areas Inspected:Review of Selected Conditions & Records Since Last Insp & Verification of CA Previously Committed to by Licensee IR 05000083/19940021994-09-20020 September 1994 Insp Rept 50-083/94-02 on 940906-08.No Violations Noted. Major Areas Inspected:Organization & Staffing,Safety Committee Function,Procedures,Requalification Training,Logs & Records,Reactor Operator,Surveillance & Experiments IR 05000083/19930011993-10-0101 October 1993 Insp Rept 50-083/93-01 on 930914-15.No Violations Noted. Major Areas Inspected:Plans,Procedures & Reviews,Fixed Site Physical Protection of Special Nuclear Matl of Moderate Strategic Significance.Details Withheld (Ref 10CFR2.790) IR 05000083/19900011990-03-19019 March 1990 Insp Rept 50-083/90-01 on 900220-23.No Violations Noted. Major Areas Inspected:Onsite Review of Radiation Protection Program Activities,Including Radiation Controls,Environ Surveillance & Monitoring & Transportation IR 05000083/19890041990-01-30030 January 1990 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-083/89-04.Response Meets Requirements of 10CFR2.201 ML20011D9841989-12-15015 December 1989 Insp Rept 50-083/89-04 on 891113-16.Violations Noted.Major Areas Inspected:Biennial Insp of Class II Research Reactor Operation & Followup of Previous Open Items,Including Health Physics Items IR 05000083/19890021989-11-0606 November 1989 Insp Rept 50-083/89-02 on 890926-27.No Noncompliance Noted. Major Areas Inspected:Plans & Procedures,Rept of Safeguards Events Fixed Site Physical Protection of SNM of Moderate Strategic Significance & Matls Accounting Records & Repts IR 05000083/19890011989-05-12012 May 1989 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-083/89-01 ML20244C4991989-04-0404 April 1989 IR 50-083/89-01 on 890227-0302 & 27.Violations Noted. Major Areas Inspected:Radiation Protection Program Activities,Including Radiation Controls,Environ Surveillance & Monitoring & Licensee Actions Re NRC Info Notices IR 05000083/19880011988-05-19019 May 1988 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-083/88-01 ML20151E6911988-04-0404 April 1988 Insp Rept 50-083/88-01 on 880314-17.Violations Noted.Major Areas Inspected:Onsite Review of Radiation Protection, Environ Surveillance & Monitoring,Transportation Activities, Enforcement Issues & NRC Info Notices IR 05000083/19870041987-11-10010 November 1987 Insp Rept 50-083/87-04 on 871019-22.No Violations or Deviations Noted.Major Areas Inspected:Biennial Insp of Class II Research Reactors IR 05000083/19870031987-04-23023 April 1987 Partially Withheld Insp Rept 50-083/87-03 on 870406-08 (Ref 10CFR2.790 & 73.21).No Violations or Deviations Noted. Major Areas Inspected:Nuclear Matl Control & Accounting Procedures,Records & Repts & SNM Physical Inventory IR 05000083/19870011987-03-26026 March 1987 Discusses Insp Rept 50-083/87-01 on 870209-11 & Forwards Notice of Violation.Civil Penalty Not Assessed Due to Prior Good Performance in Area of Violation & Prompt Action Taken Re Radwaste Transportation Program ML20207T3621987-02-13013 February 1987 Insp Rept 50-083/87-01 on 870209-11.Violations Noted:Failure to Comply W/Dot Requirements for Transportation of Matls,To Follow Radiation Protection Procedures & to Post Required Documents IR 05000083/19860021986-06-0404 June 1986 Partially Withheld Physical Security Insp Repts 50-083/86-02 & 70-1068/86-02 on 860528-29 (Ref 10CFR2.790 & 73.21).No Violations or Deviations Noted.Major Areas Inspected:Plans & Procedures & Repts of Safeguards Events IR 05000083/19860011986-05-0606 May 1986 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-083/86-01 ML20138C5111986-03-10010 March 1986 Insp Rept 50-083/86-01 on 860218-21.Violation Noted:Failure to Document Safety Review of Mod to Control Blade Shrouds IR 05000083/19850031985-11-0404 November 1985 Insp Rept 50-083/85-03 on 851009-11.No Violation or Deviation Noted.Major Areas Inspected:Licensee Action on Previous Enforcement Matters & Sticking Safety Control Blade 3 IR 05000083/19850021985-07-0808 July 1985 Safeguards Insp Repts 50-083/85-02 & 70-1068/85-02 on 850624-25.No Violations or Deviations Noted.Major Areas Inspected:Security Plan & Implementing Procedures & Security Organization.Details Withheld (Ref 10CFR2.790) IR 05000083/19850011985-05-0606 May 1985 Ack Receipt of Informing NRC of Steps Taken to Correct Deviation Noted in Insp Rept 50-083/85-01 IR 05000083/19820011982-07-19019 July 1982 Forwards IE Safeguards Insp Repts 50-083/82-01 & 70-1068/82-01 on 820629-0701.No Noncompliance Noted IR 05000083/19810021981-08-10010 August 1981 Forwards IE Safeguards Insp Rept 50-083/81-02 on 810729-31. No Noncompliance Noted.Rept Withheld (Ref 10CFR2.790) IR 05000083/19810011981-08-0404 August 1981 IE Insp Rept 50-083/81-01 on 810714-17.No Noncompliance Noted.Major Areas Inspected:Organization,Logs,Records, Requalification Training,Surveillances,Experiments,Audit Functions & Procedures IR 05000083/19800011980-04-0909 April 1980 IE Insp Rept 50-083/80-01 on 800317-20.Noncompliance Noted: Failure to Perform Required Safety Sys Checkout Prior to Startup IR 05000083/19790021979-11-20020 November 1979 IE Insp Rept 50-083/79-02 on 791022-25.Noncompliance Noted: Failure to Make Written Records of Monthly Meetings & Failure to Make Intensive Review of Facility Operations During 1977 IR 05000083/19790011979-05-11011 May 1979 IE Insp Rept 50-083/79-01 on 790427.No Noncompliance Noted. Major Areas Inspected:Security Plans,Protection of SNM, Security Organization,Access Control,Locks,Procedures & Security Program IR 05000083/19780061978-12-26026 December 1978 IE Insp Rept 50-083/78-06 on 781205.No Noncompliance Noted. Major Area Inspected:Emergency Drill Observation 2023-09-05
[Table view] Category:NRC-GENERATED
MONTHYEARIR 05000083/19982021998-11-0202 November 1998 Insp Rept 50-083/98-202 on 981006-09.No Violations Noted. Major Areas Inspected:Review of Selected Conditions & Records Since Last Insp & Verification of Corrective Actions Previously Committed to by Licensee IR 05000083/19982011998-10-0101 October 1998 Insp Rept 50-083/98-201 on 980908-10.No Violations Noted. Major Areas Inspected:Review of Selected Conditions & Records Since Last Insp & Review of Respiratory Protection Program IR 05000083/19972011997-09-0909 September 1997 Insp Rept 50-083/97-201 on 970630-0703.No Violations Noted. Major Areas Inspected:Review of Selected Conditions & Records Since Last Insp & Verification of CA Previously Committed to by Licensee IR 05000083/19940021994-09-20020 September 1994 Insp Rept 50-083/94-02 on 940906-08.No Violations Noted. Major Areas Inspected:Organization & Staffing,Safety Committee Function,Procedures,Requalification Training,Logs & Records,Reactor Operator,Surveillance & Experiments IR 05000083/19930011993-10-0101 October 1993 Insp Rept 50-083/93-01 on 930914-15.No Violations Noted. Major Areas Inspected:Plans,Procedures & Reviews,Fixed Site Physical Protection of Special Nuclear Matl of Moderate Strategic Significance.Details Withheld (Ref 10CFR2.790) IR 05000083/19900011990-03-19019 March 1990 Insp Rept 50-083/90-01 on 900220-23.No Violations Noted. Major Areas Inspected:Onsite Review of Radiation Protection Program Activities,Including Radiation Controls,Environ Surveillance & Monitoring & Transportation ML20011D9841989-12-15015 December 1989 Insp Rept 50-083/89-04 on 891113-16.Violations Noted.Major Areas Inspected:Biennial Insp of Class II Research Reactor Operation & Followup of Previous Open Items,Including Health Physics Items IR 05000083/19890021989-11-0606 November 1989 Insp Rept 50-083/89-02 on 890926-27.No Noncompliance Noted. Major Areas Inspected:Plans & Procedures,Rept of Safeguards Events Fixed Site Physical Protection of SNM of Moderate Strategic Significance & Matls Accounting Records & Repts ML20244C4991989-04-0404 April 1989 IR 50-083/89-01 on 890227-0302 & 27.Violations Noted. Major Areas Inspected:Radiation Protection Program Activities,Including Radiation Controls,Environ Surveillance & Monitoring & Licensee Actions Re NRC Info Notices ML20151E6911988-04-0404 April 1988 Insp Rept 50-083/88-01 on 880314-17.Violations Noted.Major Areas Inspected:Onsite Review of Radiation Protection, Environ Surveillance & Monitoring,Transportation Activities, Enforcement Issues & NRC Info Notices IR 05000083/19870041987-11-10010 November 1987 Insp Rept 50-083/87-04 on 871019-22.No Violations or Deviations Noted.Major Areas Inspected:Biennial Insp of Class II Research Reactors IR 05000083/19870031987-04-23023 April 1987 Partially Withheld Insp Rept 50-083/87-03 on 870406-08 (Ref 10CFR2.790 & 73.21).No Violations or Deviations Noted. Major Areas Inspected:Nuclear Matl Control & Accounting Procedures,Records & Repts & SNM Physical Inventory ML20207T3621987-02-13013 February 1987 Insp Rept 50-083/87-01 on 870209-11.Violations Noted:Failure to Comply W/Dot Requirements for Transportation of Matls,To Follow Radiation Protection Procedures & to Post Required Documents IR 05000083/19860021986-06-0404 June 1986 Partially Withheld Physical Security Insp Repts 50-083/86-02 & 70-1068/86-02 on 860528-29 (Ref 10CFR2.790 & 73.21).No Violations or Deviations Noted.Major Areas Inspected:Plans & Procedures & Repts of Safeguards Events ML20138C5111986-03-10010 March 1986 Insp Rept 50-083/86-01 on 860218-21.Violation Noted:Failure to Document Safety Review of Mod to Control Blade Shrouds IR 05000083/19850031985-11-0404 November 1985 Insp Rept 50-083/85-03 on 851009-11.No Violation or Deviation Noted.Major Areas Inspected:Licensee Action on Previous Enforcement Matters & Sticking Safety Control Blade 3 IR 05000083/19850021985-07-0808 July 1985 Safeguards Insp Repts 50-083/85-02 & 70-1068/85-02 on 850624-25.No Violations or Deviations Noted.Major Areas Inspected:Security Plan & Implementing Procedures & Security Organization.Details Withheld (Ref 10CFR2.790) IR 05000083/19810011981-08-0404 August 1981 IE Insp Rept 50-083/81-01 on 810714-17.No Noncompliance Noted.Major Areas Inspected:Organization,Logs,Records, Requalification Training,Surveillances,Experiments,Audit Functions & Procedures IR 05000083/19800011980-04-0909 April 1980 IE Insp Rept 50-083/80-01 on 800317-20.Noncompliance Noted: Failure to Perform Required Safety Sys Checkout Prior to Startup IR 05000083/19790021979-11-20020 November 1979 IE Insp Rept 50-083/79-02 on 791022-25.Noncompliance Noted: Failure to Make Written Records of Monthly Meetings & Failure to Make Intensive Review of Facility Operations During 1977 IR 05000083/19790011979-05-11011 May 1979 IE Insp Rept 50-083/79-01 on 790427.No Noncompliance Noted. Major Areas Inspected:Security Plans,Protection of SNM, Security Organization,Access Control,Locks,Procedures & Security Program IR 05000083/19780061978-12-26026 December 1978 IE Insp Rept 50-083/78-06 on 781205.No Noncompliance Noted. Major Area Inspected:Emergency Drill Observation IR 05000083/19770041977-03-0101 March 1977 IE Insp Rept 50-083/77-04 on 770721-22.No Noncompliance Noted.Major Areas Inspected:Security Plan,Sys & Areas,Access Control,Surveillance & Security Program Review ML20054C7471975-04-22022 April 1975 IE Insp Rept 50-083/75-02 on 750324-26.No Noncompliance Noted.Major Areas Inspected:Recordkeeping Sys IR 05000083/19750021975-04-22022 April 1975 IE Insp Repts 50-083/75-02,70-0462/75-01,70-0049/75-01 & 70-1068/75-02 on 750324-26.No Noncompliance Noted.Major Areas Inspected:Procedures,Reactor Thermal Output & Nuclear Matl Depletion & Production 1998-11-02
[Table view] Category:TEXT-INSPECTION & AUDIT & I&E CIRCULARS
MONTHYEARIR 05000083/19982021998-11-0202 November 1998 Insp Rept 50-083/98-202 on 981006-09.No Violations Noted. Major Areas Inspected:Review of Selected Conditions & Records Since Last Insp & Verification of Corrective Actions Previously Committed to by Licensee IR 05000083/19982011998-10-0101 October 1998 Insp Rept 50-083/98-201 on 980908-10.No Violations Noted. Major Areas Inspected:Review of Selected Conditions & Records Since Last Insp & Review of Respiratory Protection Program IR 05000083/19972011997-09-0909 September 1997 Insp Rept 50-083/97-201 on 970630-0703.No Violations Noted. Major Areas Inspected:Review of Selected Conditions & Records Since Last Insp & Verification of CA Previously Committed to by Licensee ML20135C1961997-02-24024 February 1997 NRC Operator Licensing Exam Rept 50-083/OL-97-01 Including Completed & Graded Tests for Tests Administered on 970210-11.Candidate Passed Exam IR 05000083/19940021994-09-20020 September 1994 Insp Rept 50-083/94-02 on 940906-08.No Violations Noted. Major Areas Inspected:Organization & Staffing,Safety Committee Function,Procedures,Requalification Training,Logs & Records,Reactor Operator,Surveillance & Experiments IR 05000083/19930011993-10-0101 October 1993 Insp Rept 50-083/93-01 on 930914-15.No Violations Noted. Major Areas Inspected:Plans,Procedures & Reviews,Fixed Site Physical Protection of Special Nuclear Matl of Moderate Strategic Significance.Details Withheld (Ref 10CFR2.790) IR 05000083/19900011990-03-19019 March 1990 Insp Rept 50-083/90-01 on 900220-23.No Violations Noted. Major Areas Inspected:Onsite Review of Radiation Protection Program Activities,Including Radiation Controls,Environ Surveillance & Monitoring & Transportation ML20011D9861990-01-0404 January 1990 Notice of Violation from Insp on 891113-16.Violation Noted: Blade Drop Time Check Not Performed within Eight Months After Being Performed on 881205 & Quarterly Scram Checks Not Performed within Four Months After 890221 ML20011D9841989-12-15015 December 1989 Insp Rept 50-083/89-04 on 891113-16.Violations Noted.Major Areas Inspected:Biennial Insp of Class II Research Reactor Operation & Followup of Previous Open Items,Including Health Physics Items IR 05000083/19890021989-11-0606 November 1989 Insp Rept 50-083/89-02 on 890926-27.No Noncompliance Noted. Major Areas Inspected:Plans & Procedures,Rept of Safeguards Events Fixed Site Physical Protection of SNM of Moderate Strategic Significance & Matls Accounting Records & Repts ML20244C4951989-04-0707 April 1989 Notice of Violation from Insp on 880227-0302.Violation Noted:From Jan 1988 - Feb 1989,licensee Surveys Inadequate to Evaluate Extent of Radiation Hazards Present ML20244C4991989-04-0404 April 1989 IR 50-083/89-01 on 890227-0302 & 27.Violations Noted. Major Areas Inspected:Radiation Protection Program Activities,Including Radiation Controls,Environ Surveillance & Monitoring & Licensee Actions Re NRC Info Notices ML20196D5141988-11-10010 November 1988 Exam Rept 50-083/OL-88-02 on 881014.Exam Results:One Reactor Operator Passed Written Test ML20151E6671988-07-0505 July 1988 Exam Rept 50-083/OL-88-01 on 880608-09.Exam Results:Two Candidates Passed Operating Tests & One Candidate Passed Written Exams ML20151E6911988-04-0404 April 1988 Insp Rept 50-083/88-01 on 880314-17.Violations Noted.Major Areas Inspected:Onsite Review of Radiation Protection, Environ Surveillance & Monitoring,Transportation Activities, Enforcement Issues & NRC Info Notices ML20151E6741988-03-0707 March 1988 Notice of Violation from Insp on 880314-17.Violation Noted: Licensee Failed to Conduct Adequate Surveys to Evaluate Extent of Radiation Hazards Present in Liquid & Gaseous Effluents Released from Facility IR 05000083/19870041987-11-10010 November 1987 Insp Rept 50-083/87-04 on 871019-22.No Violations or Deviations Noted.Major Areas Inspected:Biennial Insp of Class II Research Reactors IR 05000083/19870031987-04-23023 April 1987 Partially Withheld Insp Rept 50-083/87-03 on 870406-08 (Ref 10CFR2.790 & 73.21).No Violations or Deviations Noted. Major Areas Inspected:Nuclear Matl Control & Accounting Procedures,Records & Repts & SNM Physical Inventory ML20205N9891987-03-26026 March 1987 Notice of Violation from Insp on 870209-11.Violations Noted: Licensee Transported Two 55-gallon Drums Containing Licensed Matl Outside Confines of Plant Over Road Accessible to Public & Did Not Comply W/Dot Requirements ML20207T3551987-02-20020 February 1987 Notice of Violation from Insp on 870209-11 ML20207T3621987-02-13013 February 1987 Insp Rept 50-083/87-01 on 870209-11.Violations Noted:Failure to Comply W/Dot Requirements for Transportation of Matls,To Follow Radiation Protection Procedures & to Post Required Documents IR 05000083/19860021986-06-0404 June 1986 Partially Withheld Physical Security Insp Repts 50-083/86-02 & 70-1068/86-02 on 860528-29 (Ref 10CFR2.790 & 73.21).No Violations or Deviations Noted.Major Areas Inspected:Plans & Procedures & Repts of Safeguards Events ML20138C5071986-03-27027 March 1986 Notice of Violation from Insp on 860218-21 ML20138C5111986-03-10010 March 1986 Insp Rept 50-083/86-01 on 860218-21.Violation Noted:Failure to Document Safety Review of Mod to Control Blade Shrouds IR 05000083/19850031985-11-0404 November 1985 Insp Rept 50-083/85-03 on 851009-11.No Violation or Deviation Noted.Major Areas Inspected:Licensee Action on Previous Enforcement Matters & Sticking Safety Control Blade 3 IR 05000083/19850021985-07-0808 July 1985 Safeguards Insp Repts 50-083/85-02 & 70-1068/85-02 on 850624-25.No Violations or Deviations Noted.Major Areas Inspected:Security Plan & Implementing Procedures & Security Organization.Details Withheld (Ref 10CFR2.790) IR 05000083/19810011981-08-0404 August 1981 IE Insp Rept 50-083/81-01 on 810714-17.No Noncompliance Noted.Major Areas Inspected:Organization,Logs,Records, Requalification Training,Surveillances,Experiments,Audit Functions & Procedures PNO-II-80-127, on 800724,reactor Was Being Brought to Power When Area Monitor Alarmed.Caused by Failure to Remove Startup Source.Reactor Manually Tripped & Startup Source Removed1980-07-24024 July 1980 PNO-II-80-127:on 800724,reactor Was Being Brought to Power When Area Monitor Alarmed.Caused by Failure to Remove Startup Source.Reactor Manually Tripped & Startup Source Removed IR 05000083/19800011980-04-0909 April 1980 IE Insp Rept 50-083/80-01 on 800317-20.Noncompliance Noted: Failure to Perform Required Safety Sys Checkout Prior to Startup IR 05000083/19790021979-11-20020 November 1979 IE Insp Rept 50-083/79-02 on 791022-25.Noncompliance Noted: Failure to Make Written Records of Monthly Meetings & Failure to Make Intensive Review of Facility Operations During 1977 IR 05000083/19790011979-05-11011 May 1979 IE Insp Rept 50-083/79-01 on 790427.No Noncompliance Noted. Major Areas Inspected:Security Plans,Protection of SNM, Security Organization,Access Control,Locks,Procedures & Security Program IR 05000083/19780061978-12-26026 December 1978 IE Insp Rept 50-083/78-06 on 781205.No Noncompliance Noted. Major Area Inspected:Emergency Drill Observation ML20147B8171978-08-17017 August 1978 Notice of Violation from Inspec on 780817 ML20151X4781977-08-19019 August 1977 PNO-77-146:flushing of Reactor Bldg Toilet Caused Reactor Scrams Over Past Several Yrs.No Safety Implications Involved & Contrary to Published News Repts,Sys Not Required for Emergency Cooling of Reactor IR 05000083/19770041977-03-0101 March 1977 IE Insp Rept 50-083/77-04 on 770721-22.No Noncompliance Noted.Major Areas Inspected:Security Plan,Sys & Areas,Access Control,Surveillance & Security Program Review ML20054C7471975-04-22022 April 1975 IE Insp Rept 50-083/75-02 on 750324-26.No Noncompliance Noted.Major Areas Inspected:Recordkeeping Sys IR 05000083/19750021975-04-22022 April 1975 IE Insp Repts 50-083/75-02,70-0462/75-01,70-0049/75-01 & 70-1068/75-02 on 750324-26.No Noncompliance Noted.Major Areas Inspected:Procedures,Reactor Thermal Output & Nuclear Matl Depletion & Production 1998-11-02
[Table view] |
Inspection Report - - 1979001 |
---|
|
|
Text
.
..
UNIT E D ST ATES ska "f ouq'o NUCLEAR REGULATORY COMMISSION
[( x, c ( ',,o I
R EGloN 11
- ^,j.$
101 M ARIETT A STR E ET. N.W.
,
ATLANTA, CEORGIA 30303 s, * O f,~,8 o.,
MAY 111979
Report No. 50-83/79-1 Licensee: University of Florida 202 Nuclear Sciences Center Gainesville, Florida 32601 Facility Name: University of Florida Test Reactor Docket No. 50-83 License No. R-56
_
Safeguards Group No. T 3, Inspector:,j %- l l l,,,
-
rI
. -
f
/'
.
-
' D. E. Moore Date Signed Approved by:_
.
(. _
31 r19.
W. J. lobin, A t g Section Chiet, Safeguards Da e 'igned Branch
.
SUMMRY Inspection on April 27, 1979
,
Areas Inspected This routine, unannounced inspection involved six inspector-hours on-site in the areas of security plans, protection of SNM, security organization, access control, alarm systems, key, locks and hardware, procedures, security program review and licensee action on previous inspection finding.
Results Of the eight areas inspected, no apparent items of noncompliance or deviations were identified.
t
'
.
.
7 907 200a4I 366 108
,
_
.
.
DETAILS 1.
Persons Contacted Licensee Employees
- M. J. Ohanian, Department Chairman
- C. Fount 4an, Assistant Reactor Supervisor H. Gogtu, Reactor Operator R. D. Martin, Lieutenant, UPD Other licensee employees contacted during this inspection included office personnel.
2.
Exit Interview The inspectica scope and findings were summarized on April 27, 1979 with those persons irdicated in Paragraph 1 above. The licensee was informed that no items of noncompliance were identified during this inspection and that the previous finding will be closed out in this report.
3.
Licensee Action on Previous _ Inspection Findings (Closed) Infraction (78-05-01): Failure to secure reactor key when operator not present in reactor cell The inspector verified that
.
daily checkout procedure was revised to include the securing of the reactor key when the reactor is shutdown.
4.
Unresolved Items Unresolved items were not identified during this inspection.
5.
Security Plan The licensee is currently operating under University of Florida Training Reactor (UFTR) Physical Security Plan dated September 15, 1976 with revisions dated December 29, 1977 and March 28, 1978 and approved by the Office of huclear Reactor Regulation (NRR) on October 12, 1978.
The inspector verified that all associated equipment, the failure
,
of which could endanger the health and safety of the public, has
'
.
been designated as essential equipment in the approved security plan.
366 109 O
.
.
s-2-6.
Protection of SNM The fuel storage areas, the reactor control room and the reactor cell have been designated as security areas.
The inspector verified that all security areas are as described in the security plan.
Recent changes in a port ion of the Reactor Cell perimeter wall was inspected and the plan is being revised.
No items of noncompliance or deviations were identified.
7.
Security Organization The security organization was as described in the security plan.
Discussions with the University Police Department revealed that they are aware of their responsibilities to respond to security ala rms at the UFTR.
The inspector verified that the security plan included letters from the University of Florida Police Department, the City of Gainesville Police Department and the Alachua County Sheriff's Office indicating their response capabilities and response times in the event of an emergency at the Nuclear Science Center.
No items of noncompliance or deviations were identified.
8.
Access Control The categories of personnel authorized access to the security areas are described in the Security Plan. The means used to control access were verified during the inspection and are as described in the security plan.
No items of noncompliance or deviations were identified.
Alarm Systems A backup alarm system is included with the present computer-based alarm system. The new system annunciates in the same location as the computer-based system.
A test of the alarms revealed that the system is being maintained in operable and effective candition.
No items of noncompliance or deviations were identified.
9. ', Keys, Locks and lia rdware By observation and physical testing, the inspector checked the licensee's controls and maintenance of locks, keys and hardware relative to access to the Reactor Cell. A physical inventary of 366 110
.
.
.
-3-all available security-related keyr., to include spares, was conducted by the inspector.
No items of noncompliance or deviations were identified.
10.
Procedures Procedures for the surveillance of essential equipment and security areas were examined during the inspection.
It is noted that both the daily checkout precedure and the reactor shutdown procedure has been revised with regards to the securing of the reactor key upon completion.
No items of noncumpliance or deviations were identified.
11.
Security Prog am Review Records indicate that a Subcommittee Audit was conducted during the latter part of 1978 and reviewed by the UFTR Subcommittee Chairman January 3-9, 1979, and the Department Chairman on January 18, 1979.
No items of noncompliance or deviations were identified.
,
~
. '.
.
366 111