IR 05000062/1981001
| ML19350E442 | |
| Person / Time | |
|---|---|
| Site: | University of Virginia |
| Issue date: | 06/15/1981 |
| From: | Robert Lewis NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | VIRGINIA, UNIV. OF, CHARLOTTESVILLE, VA |
| References | |
| NUDOCS 8106230075 | |
| Download: ML19350E442 (1) | |
Text
asg I
.
,
[
'
h, NUCLEAR REGULATORY COMMISSION L
j REGION 11
'9'
f-101 MARIETTA ST., N.W., SUITE 3100 ATI.ANTA, GEORGIA 30303
.-
""'
JUN 151981 g
University of Virginia
- N yd.
. School of Engineering and M JUN 2 2 Eh --
'
Applied Science H
_ Department of Nuclear Engineering (5 u.s.i m n a ;r '
.
sw::mi j 'E 1,
and Engineering Physics
-
A Reactor Facility D,
Charlottesvi' ~
N 22901
-
O Gentlemen:
Subject: Report Nos. 50-62/81-01 and 50-396/81-01 This refers to the routine safeguards inspection conducted by B. L. Hall of this office on May 5,1981, of activities authorized by NRC License Nos. R-66 and R-123 at University of Virginia Reactor facility and to the discussions of our findings held with Mr. P. J. Farrar, Reactor Supervisor, and members of your staff at the conclusion of the inspection.
Areas examined during this inspection included your physical security program as implemented under the provisions of Title 10, Code of Federal Regulations, Part 73, " Physical Protection of Plants and Materials", and the specific requirements of license conditions and your approved Security Plan. Within these areas, the inspection consisted of selective examinations of procedures and representative records, interviews with personnel, performance tests, and observations by the inspector.
Within the scope of this inspection, no violations or deviations were disclosed.
In accordance with Section 2.790(d) of the NRC's " Rules of Practice", Part 2, Title 10, Code of Federal Regulations, activities involving safeguards and s:curity measures are exempt from public disclosure; therefore, the enclosed report with the exception of the cover page, which is an inspecti.on summary, will
.
not be placed in the Public Document Room.
Should you have any questions concerning this letter, we will be glad to discuss them with you.
Sincerely, f.C.W R. C.1.ewis, Acting Director Division of Resident and Reactor Project Inspection Enclosures:
See Page 2
[
6'l l
gmga T-l.::7 '!"."3
8106 23 o07f C0FIAliU INIU~UUId3
,
L-