IR 05000020/2008201
ML081480397 | |
Person / Time | |
---|---|
Site: | MIT Nuclear Research Reactor |
Issue date: | 05/27/2008 |
From: | Johnny Eads NRC/NRR/ADRA/DPR/PRTB |
To: | Bernard J Massachusetts Institute of Technology (MIT) |
Voth M, NRR/ADRA/DPR/PRT, 415-1210 | |
References | |
IR-08-201 | |
Download: ML081480397 (25) | |
Similar Documents at MIT Nuclear Research Reactor | |
---|---|
Category:Inspection Report
MONTHYEARIR 05000020/20242012024-09-12012 September 2024
[Table view]Massachusetts Institute of Technology - U.S. Nuclear Regulatory Commission Safety Inspection Report No. 05000020/2024201 IR 05000020/20232032023-11-21021 November 2023 Massachusetts Institute of Technology - U.S. Nuclear Regulatory Commission Routine Inspection Report No. 05000020/2023203 IR 05000020/20232012023-10-12012 October 2023 Massachusetts Institute of Technology - U.S. Nuclear Regulatory Commission Routine Inspection Report No. 05000020/2023201 IR 05000020/20232022023-09-27027 September 2023 Massachusetts Institute of Technology - U.S. Nuclear Regulatory Commission Security Inspection Report No. 05000020/2023202 IR 05000020/20222012023-02-0707 February 2023 Massachusetts Institute of Technology - U.S. Nuclear Regulatory Commission Routine Inspection Report No. 05000020/2022201 IR 05000020/20212032021-11-0909 November 2021 Massachusetts Institutes of Technology - U.S. Nuclear Regulatory Commission Routine Inspection Report No. 05000020/2021203 IR 05000020/20212012021-09-30030 September 2021 Massachusetts Institute of Technology - U.S. Nuclear Regulatory Commission Routine Inspection Report 05000020/2021201 ML20248H5682020-09-22022 September 2020 Mit Research Reactor Routine Inspection Report with Enforcement Discretion (EA-20-109) - August 2020 IR 05000020/20192032020-01-15015 January 2020 Massachusetts Institute of Technology U.S. Nuclear Regulatory Commission Security-Related Inspection Report 05000020/2019203 IR 05000020/20182012018-12-0707 December 2018 Massachusetts Institute of Technology - U.S. Nuclear Regulatory Commission Routine Inspection Report 05000020/2018201 IR 05000020/20172022018-05-0202 May 2018 Massachusetts Institute of Technology - Nuclear Regulatory Commission Routine Inspection Report No. 5000020/2017-202 ML18116A5212018-05-0202 May 2018 Massachusetts Institute of Technology - U.S. Nuclear Regulatory Commission Route Inspection Report No. 5000020/2018-201 IR 05000020/20172012017-12-13013 December 2017 Massachusetts Intitule of Technology Nuclear Reactor Laboratory - NRC Security-Related Inspection Report 05000020/2017201 ML17201Q5492017-07-27027 July 2017 Massachusetts Institute of Technology U.S. Nuclear Regulatory Commission Routine Inspection Report No. 50-020/2017-201 ML17066A1362017-03-0909 March 2017 Massachusetts Institute of Technology - Nuclear Regulatory Commission Routine Inspection Report No. 50-020/2016-202 IR 05000020/20162012016-05-11011 May 2016 Massachusetts Institute of Technology, U.S. Nuclear Regulatory Commission Routine Inspection Report No. 05000020/2016201, April 4-7, 2016 IR 05000020/20152032015-12-17017 December 2015 IR 05000020/2015203, November 16-19, 2015, Massachusetts Institute of Technology IR 05000020/20152022015-04-17017 April 2015 IR 5000020/2015-202; 03/16-19/2015; Massachusetts Institute of Technology - NRC Routine Inspection Report IR 05000020/20152012015-02-27027 February 2015 IR 05000020/2015-201 on January 26-29, 2015, Massachusetts Institute of Technology - NRC Security Related IR 05000020/20142022014-12-18018 December 2014 IR 05000020/2014202, November 17-20, 2014, Massachusetts Institute of Technology IR 05000020/20142012014-06-0505 June 2014 IR 05000020-14-201 on May 5-8, 2014 at Massachusetts Institute of Technology - NRC Routine Inspection Report No. 50-020-14-201 IR 05000020/20132022013-06-0505 June 2013 Massachusetts Institute of Technology - NRC Security Related Inspection Report No. 05000020-13-202 IR 05000020/20132012013-04-10010 April 2013 IR 05000020-13-201 ;03/11/2013 -03/14/2013; Massachusetts Institute of Technology - NRC Routine Inspection Report IR 05000020/20122022012-11-19019 November 2012 IR 05000020-12-202 on October 22-25, 2012 at Massachusetts Institute of Technology - NRC Routine Inspection Report No. 50-020/2012-202 and Notice of Violation IR 05000020/20112012011-06-0606 June 2011 IR 05000020-11-201, on May 10-12, 2011, Massachusetts Institute of Technology IR 05000020/20082032008-12-0101 December 2008 IR 05000020-08-203, on 11/03/2008 Through 11/06/2008, Massachusetts Institute of Technology (Mit) IR 05000020/20082012008-05-27027 May 2008 IR 05000020-08-201, on 04/28-05/01/2008, Mit Research Reactor, Routine IR 05000020/20082022008-05-20020 May 2008 NRC Inspection Report No. 50-020-08-202 - Cover Letter IR 05000020/20072032007-12-19019 December 2007 NRC Special Inspection Report No. 05000020-07-203 and Notice of Violation IR 05000020/20072022007-10-29029 October 2007 IR 05000020-07-202 on 10/15/2007 - 10/19/2007 for Massachusetts Institute of Technology (Mit) IR 05000020/20072012007-05-30030 May 2007 IR 05000020-07-201 for Mit Research Reactor on 05/07-11/2007 IR 05000020/20062022006-11-0909 November 2006 IR 05000020-06-202, on 10/16-20/2006, Massachusetts Institute of Technology Research Reactor ML0601303342006-01-25025 January 2006 NRC Inspection Report No. 50-20/2005-201, Mit Research Reactor ML0327607352003-10-0707 October 2003 NRC Safeguards Inspection Report No. 50-20/2003-202 IR 05000020/19992011999-07-30030 July 1999 Insp Rept 50-020/99-201 on 990628-0701.No Violations Noted. Major Areas Inspected:Announced Insp Included Onsite Review Selected Aspects of Design Change Functions Program, Radiation Protection Program IR 05000020/19982031999-02-0101 February 1999 Insp Rept 50-020/98-203 on 981207-10.No Violations Noted. Major Areas Inspected:Radiological Control During Major Facility Mod Projects IR 05000020/19972021998-01-0909 January 1998 Insp Rept 50-020/97-202 on 971118-21.No Violations Noted. Major Areas Inspected:Organization & Operations & Maint Activities,Procedures & Documentation,Review & Audit & Design Change Functions & Emergency Preparedness IR 05000020/19972011997-10-0909 October 1997 Insp Repts 50-020/97-201 & 70-0938/97-201 on 970915-16.No Noncompliances Noted.Major Areas Inspected:Security Plan & Matl Accountability Programs IR 05000020/19970011997-05-0808 May 1997 Insp Rept 50-020/97-01 on 970407-11.No Violations Noted. Major Areas Inspected:Respiratory Protection Program,Program Aspects,Radiation Protection Program Policies & Radiological Controls During Irradiation of Bnct Patient IR 05000020/19960021996-10-16016 October 1996 Insp Rept 50-020/96-02 on 960916-20.No Violations Noted. Major Areas Inspected:Emphasis on Maint & Training After Departure of Staff Members Resulted in Improved Program Performance IR 05000020/19930031993-12-17017 December 1993 Insp Repts 50-020/93-03 & 70-0938/93-01 on 931206,08 & 09. No Violations Noted.Major Areas inspected:on-site follow-up of Previously Identified Item,Facility Operation,Shipping & Receiving,Storage & Internal Controls & Physical Security IR 05000020/19920021992-12-30030 December 1992 Insp Rept 50-020/92-02 on 921201-03.No Safety Concerns or Violations Noted.Major Areas Inspected:Previously Identified Items,Treatment Room Mods,Facility Staffing,Control of Experiments,Safety Sys Surveillances & Shipment of Waste IR 05000020/19900031990-11-26026 November 1990 Exam Rept 50-020/90-03OL on 901015-16.Exam Results:All Candidates Passed All Sections of Exams IR 05000020/19900011990-10-31031 October 1990 Insp Rept 50-020/90-01 on 900917-20.No Violations Noted. Major Areas Inspected:Operations & Radiological Controls at Facility,Including,Organization,Operations Logbooks,Safety Committees & Status of Previous Items IR 05000020/19890021989-08-15015 August 1989 Insp Rept 50-020/89-02 on 890717-18.No Violations Noted. Major Areas Inspected:Changes to Emergency Preparedness Program,Emergency Facilities & Equipment,Notifications & Communications,Training,Drills & Exercises IR 05000020/19890011989-07-20020 July 1989 Ack Receipt of 890506,0602 & 21 Ltrs Informing NRC of Steps Taken to Correct Violations Noted in Insp Repts 50-020/89-01 & 70-0938/89-01 IR 05000020/19880041988-10-19019 October 1988 Exam Rept 50-020/88-04OL on 880912 & 13.Exam Results:One Senior Reactor Operator & One Reactor Operator Passed IR 05000020/19880021988-10-19019 October 1988 Exam Rept 50-020/88-02OL on 880912 & 13.Exam Results:Both Candidates Successfully Completed Respective Exams & Licenses Granted IR 05000020/19880031988-08-29029 August 1988 Insp Rept 50-020/88-03 on 880718-20.No Violations Noted. Major Areas Inspected:Facility Organization,Operations, Notification,Communication,Equipment & Training IR 05000020/19880011988-03-10010 March 1988 Exam Rept 50-020/88-01OL on 880125-26.Exam Results:All Candidates Passed Exam 2024-09-12 Category:Letter MONTHYEARML24220A1502024-10-0909 October 2024
[Table view]Examination Report Letter No. 50-020/OL-24-02 Massachusetts Institute of Technology ML24220A1512024-10-0909 October 2024 Examination Result Letter No 50 020 OL 24 02 Massachusetts Institute of Technology IR 05000020/20242012024-09-12012 September 2024 Massachusetts Institute of Technology - U.S. Nuclear Regulatory Commission Safety Inspection Report No. 05000020/2024201 ML24199A1082024-07-23023 July 2024 Examination Confirmation Letter No. 50-020/OL-24-02, Massachusetts Institute of Technology ML24052A2102024-06-0606 June 2024 Examination Result Letter No. 50-020/OL-24-01, Massachusetts Institute of Technology ML24127A1012024-04-26026 April 2024 Mit - Update of Professor Ian A. Waitz Named as Mit Vice President for Research ML24127A1002024-04-24024 April 2024 Mit - Proposal for Conversion to Low Enriched Uranium (Leu), Mit Research Reactor ML24094A0482024-03-29029 March 2024 Mit Nuclear Reactor Lab., Annual Report for 2023, Per Technical Specification 7.7.1 ML24081A1642024-03-11011 March 2024 Massachusetts Institute of Technology, NF-0343 & NW-0681 - Submittal of Rescinding Notice of Cancellation ML24022A0972024-01-22022 January 2024 Massachusetts Institute of Technology– Change of Facility Backup Project Manager ML23354A1442024-01-0505 January 2024 Examination Confirmation Letter No. 50-020/OL-24-01, Massachusetts Institute of Technology IR 05000020/20232032023-11-21021 November 2023 Massachusetts Institute of Technology - U.S. Nuclear Regulatory Commission Routine Inspection Report No. 05000020/2023203 ML23242A3382023-11-0606 November 2023 Examination Report Letter No. 50-020/OL-23-01, Massachusetts Institute of Technology ML23242A3392023-11-0606 November 2023 Examination Result Letter No. 50-020/OL-23-01, Massachusetts Institute of Technology IR 05000020/20232012023-10-12012 October 2023 Massachusetts Institute of Technology - U.S. Nuclear Regulatory Commission Routine Inspection Report No. 05000020/2023201 IR 05000020/20232022023-09-27027 September 2023 Massachusetts Institute of Technology - U.S. Nuclear Regulatory Commission Security Inspection Report No. 05000020/2023202 ML23194A0412023-07-11011 July 2023 Mit Research Reactor - Duties of Reactor Superintendent ML23103A2632023-05-10010 May 2023 Examination Confirmation Letter No. 50-020/OL-23-01 Massachusetts Institute of Technology ML23094A1102023-03-30030 March 2023 Massachusetts Institute of Technology (Mit), Submittal of Annual Report for 2022, Technical Specification 7.7.1 ML23072A0242023-03-0707 March 2023 Mit, Nuclear Reactor Lab., Proposal for Conversion to Low Enriched Uranium (Leu), Mit Research Reactor IR 05000020/20222012023-02-0707 February 2023 Massachusetts Institute of Technology - U.S. Nuclear Regulatory Commission Routine Inspection Report No. 05000020/2022201 ML22189A0492022-07-25025 July 2022 Examination Confirmation Letter No.50-020/OL-22-02, Massachusetts Institute of Technology ML22095A2412022-03-31031 March 2022 Annual Report for the Mit Research Reactor for the Period from January 1, 2021, to December 31, 2021 ML22062B0422022-02-10010 February 2022 Proposal for Conversion to Low Enriched Uranium (Leu), Mit Research Reactor, Docket No. 50-20, 10 CFR 50.64 (c)(2)(ii) of That Paragraph ML21328A2342021-11-29029 November 2021 Examination Confirmation Letter No. 50-020/OL-22-01, Massachusetts Institute of Technology IR 05000020/20212032021-11-0909 November 2021 Massachusetts Institutes of Technology - U.S. Nuclear Regulatory Commission Routine Inspection Report No. 05000020/2021203 IR 05000020/20212012021-09-30030 September 2021 Massachusetts Institute of Technology - U.S. Nuclear Regulatory Commission Routine Inspection Report 05000020/2021201 ML21186A0032021-07-16016 July 2021 Examination Confirmation Letter No. 50-020/OL-21-02, Massachusetts Institute of Technology ML21165A1542021-05-28028 May 2021 Mit - Emergency Plan and Procedures, 10 CFR 50.54(q)(5) ML21140A3622021-05-17017 May 2021 Massachusetts Institute of Technology (Mit) - Supplement to Response to the Request for Additional Information for Battery Upgrade License Amendment Request (EPID: L-2021 -NFA-0000) ML21132A2512021-05-0606 May 2021 Massachusetts Institute of Technology, License No. R-37, Docket No. 50-20, Reportable Occurrence 50-20/2021-: Operation with Less than the Required Staffing on Site; NRC OPS Center Log EN 55212 ML21112A1672021-04-12012 April 2021 Massachusetts Institute of Technology - Physical Security Plan Revision Regarding Biometric Readers ML21105A3602021-04-0707 April 2021 Duties of Reactor Superintendent ML21099A1132021-03-31031 March 2021 Massachusetts Institute of Technology - Annual Report, Docket No. 50-20, License R-37, Technical Specification 7.7.1 ML21091A2082021-03-24024 March 2021 Mit Nuclear Reactor Lab - Response to Request for Additional Information for Battery Upgrade License Amendment Request ML21076A0232021-03-18018 March 2021 Requests for Additional Information - Related to License Amendment Request to Replace Emergency Power System Batteries ML21070A1852021-03-0202 March 2021 Mit Nuclear Reactor Laboratory, License Amendment Request Regarding Emergency Battery Surveillances in Technical Specification 4.6, Docket No. 50-20, License R-37 ML21063A2552021-02-25025 February 2021 Proposal for Conversion to Low Enriched Uranium (Leu), :Mit Research Reactor, Docket No. 50-20, 10 CFR 50.64 (c)(2)(ii) of That Paragraph ML21053A4372021-02-23023 February 2021 Examination Confirmation Letter No. 50-020/OL-21-01, Massachusetts Institute of Technology ML21036A0852021-02-19019 February 2021 Massachusetts Institute of Technology - Acceptance of License Amendment Request to Revise Surveillance Frequency During Extended Reactor Shutdown ML21035A2582021-01-29029 January 2021 Massachusetts Institute of Technology (Mit), Supplement to Technical Specifications Surveillance Frequency Definition Update for Improved Compliance Under 10 CPR 50.36(c)(3) ML20295A4242020-11-16016 November 2020 Notification of Mailing Address Change Regarding Submittal of Fingerprint Cards ML20307A4202020-11-0505 November 2020 Granting of Extension Request to Supplement License Amendment to Revise Surveillance Requirement Frequency ML20304A1172020-10-19019 October 2020 Time Extension Request for LAR on Technical Specifications Surveillance Frequency Update for Improved Compliance Under 10 CFR 50.36(c)(3) for the Mit Research Reactor ML20248H5682020-09-22022 September 2020 Mit Research Reactor Routine Inspection Report with Enforcement Discretion (EA-20-109) - August 2020 ML20161A3342020-07-24024 July 2020 Massachusetts Institute of Technology - Issuance of Amendment NO.44 to Renewed Facility Operation License No. R-37 to Amend Technical Specifications Related to Level 1 Position Title Change ML20182A7092020-07-0909 July 2020 Acceptance Review Amendment Request to Revise Surveillance Frequency - Opportunity to Supplement ML20192A0762020-06-30030 June 2020 Mit - Supplemental Information for License Amendment Request for Position Title Change in Technical Specifications for Level 1 Staff ML20070H2672020-06-0404 June 2020 Examination Report No. 50-020/OL-20-01, Massachusetts Institute of Technology ML20119A8272020-05-29029 May 2020 Massachusetts Institute of Technology - Issuance of Amendment No. 43 Extending Time to Implement License Amendment No. 42 to Facility Operating License No. R-37 2024-09-12 |
Inspection Report - MIT Nuclear Research Reactor - 2008201 (Security) | |
---|---|
Assessments
|
Text
SUBJECT:
NRC INSPECTION REPORT NO. 50-020/2008-201
Dear Dr. Bernard:
This letter refers to the inspection conducted on April 28 to May 1, 2008, at your research reactor facility. The inspection included a review of activities authorized for your facility. The enclosed report presents the results of that inspection.
Areas examined during the inspection are identified in the report. Within these areas, the inspection consisted of selective examinations of procedures and representative records, interviews with personnel, and observations of activities in progress. Based on the results of this inspection, no safety concern or noncompliance with NRC requirements was identified. No response to this letter is required.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRCs document system (ADAMS). ADAMS is accessible from the NRC Web site at (the Public Electronic Reading Room) http://www.nrc.gov/reading-rm/adams.html.
If you have any questions concerning this inspection, please contact Marcus H. Voth at 301-415-1210.
Sincerely,
/RA/
Johnny H. Eads, Branch Chief Research and Test Reactors Branch B Division of Policy and Rulemaking Office of Nuclear Reactor Regulation Docket No.: 50-020 License No.: R-37 Enclosure: NRC Inspection Report No. 50-020/2008-201 cc: See next page
Massachusetts Institute of Technology Docket No. 50-20 cc:
City Manager City Hall Cambridge, MA 02139 Department of Environmental Protection One Winter Street Boston, MA 02108 Director Radiation Control Program Department of Public Health 90 Washington Street Dorchester, MA 02121 Nuclear Preparedness Manager Massachusetts Emergency Management Agency 400 Worcester Road Framingham, MA 01702-5399 Test, Research, and Training Reactor Newsletter University of Florida 202 Nuclear Sciences Center Gainesville, FL 32611
May 27, 2008 Dr. John