IA-85-671, Seventh Semiannual Staff Evaluation of Status of Nprds

From kanterella
Jump to navigation Jump to search
Seventh Semiannual Staff Evaluation of Status of Nprds
ML20133H899
Person / Time
Issue date: 07/31/1985
From:
NRC OFFICE FOR ANALYSIS & EVALUATION OF OPERATIONAL DATA (AEOD)
To:
Shared Package
ML20133H894 List:
References
FOIA-85-671 NUDOCS 8510180165
Download: ML20133H899 (20)


Text

-

SEVENTH SEMIANNUAL STAFF EVALUATION O_F THE STATUS OF NPRDS July 1985 Prepared by:

Office for Analysis and Evaluation of Operational Data l

l l

NOTE - The NRC has agreed not to release plant specific NPRDS data.

Thus removal of Attachment A is necessary prior to release of this document outside the NRC.

Enclosure 1 8510180165 851011 PDR FOIA O'MEALIB5-671 PDR

INTRODUCTION The prostnt NPRD System is a voluntary program for the rcporting of reliability data associated with selected compon2nts and systems in nucitar power plants.

Since January 1,1982, the NPRD System has been managed and operated by the Institute of Nuclear Power Operations.

BACKGROUND Former President Carter's 1977 National Energy Plan recomended that the NRC make mandatory the voluntary reporting of minor mishaps and component failures (i.e.,NPRDS). The plan suggested that mandatory participation would enable the industry and the NRC to develop a more reliable data base which is needed to improve the reactor design, construction, operation, safety, and reliability, i Coincident with the NRC's activities directed toward implementing the President's l

recommendation, the General Accounting Office (GAO) reviewed the NRC's data-gathering activities concerning unscheduled events at comercial nuclear I facilities. In a report issued in late January 1979, the GA0 concluded that l it was unlikely that the NRC could justify mandatory NPRDS participation when factors such as additional industry costs, limited expected safety benefits, and duplication of the NRC's LER system were considered. However, the GAO believed that a full examination of the issue was warranted and suggested that the issue be decided using rulemaking procedures.

Following an April 19, 1979 Comission briefing on the collection and analysis of operational safety data, the Comission concurred with the January 1979 GA0 recommendation that rulemaking be used to decide the question of whether to make NPRDS reporting mandatory. Accordingly, an Advance Notice of Proposed Rulemaking (ANPRM) was approved by the Comission, and published in the Federal Register on January 30, 1980 (45 FR 6793). Numerous public coment letters were received in response to the ANPRM. The predominant message in the coments was overwhelming oppositior, to making participation in NPRDS mandatory.

Despite the opposition to a mandatory system, the staff identified a strong need for failure rate data and engineering data. 'The requirements for such data indicated a need to revise and reorient the system, in combination with the existing LER system, and to assure its effective implementation through NRC rulemaking. In order to obtain the necessary improvements in the LER and NPRDS reporting programs, the staff developed conceptually a revised reporting system. This Integrated Operational Experience Reporting System (10ERS) would have combined and restructured the NRC LER system and the voluntary NPRD System. The 10ERS concept included two principal features:

(1) the collection of detailed technical description of significant events, and (2) the collection of component reliability data.

While the staff still believes that both types of data are essential to the NRC mission, the possibility arose that the NRC could obtain the needed reliability data without assuming direct responsibility for its collection.

On June 8,1981, the INP0 Board of Directors decided that because of its role as an active user of NPRDS data, INP0 would assume responsibility for

management of NPRDS. Further, INP0 preposed developing critsria to b3 used in their canagement audits of member utilities to assess the adequacy of NPRDS participation. Therefore, rather than preempt the INP0 activities by pro-ceeding with the 10ERS rulemaking, the staff recomended and the Comission approved (SECY-81-494) proceeding to modify and codify the existing LER reporting requirements as a separate rulemaking while holding the 10ERS rulemaking in abeyance.

In approving SECY-81-494, the Commission directed that the staff closely monitor the status and rate of improvement of the NPRD System and provide the Commission with semiannual status reports on the effectiveness of INP0 management of the NPRD System.

In order to monitor the completeness and quality of NPRDS data, AE00 estab-lished an evaluation program at the Reliability and Statistics Branch, EG&G Idaho. The initial purpose of this program was to provide a baseline of information concerning the completeness and quality of the NPRDS failure j reporting and engineering data files as they existed prior to INP0's assumption I of responsibility for the management of NPRDS. Subsequent analyses of the l completeness and quality of the files are being conducted periodically in order to provide a measure of the improvements in the NPRD System under INP0 management and technical direction.

The scope and results of this evaluation program have been discussed in reports to the Commission dated July 1,1982 (SECY-82-279), January 4,1983 (SECY-83-4), July 5,1983 (SECY-83-4A), January 27,1984 (SECY-84-44),

August 1, 1984 (SECY 84-44A), and February 8, 1985 (SECY-85-56).

In the past, each semiannual report 'has included analysis of NPRDS data from two calendar quarters. However, in the third quarter of CY 1984, INP0, working with individual plants, began an extensive quality assurance review of all of the engineering data records (approximately 226,000 records)inthe data base. The effort, called "rescoping", was necessary to conform the information in the NPRDS data base to revisions to the NPRDS Reportable System

, and Component Scope Manual and the NPRDS Reporting Procedure Manual.

l The rescoping involved reviewing approximately 4,000 engineering records per plant, and identifying plant components and systems covered by NPRDS. In addition, the rescoping added a new retrieval feature, i.e., application codes for key plant components. Users will be able to retrieve rapidly, for example, all reports on reactor trip breakers with just one command using these new application codes. The rescoping was completed in April 1985.

Although, in the long-term, the rescoping will result in major improvements in the accuracy and consistency of the NPRDS engineering data, it produced a' major short-term disruption to the NPRD System. Thus, measures of NPRDS performance (e.g., participation) for the third quarter of CY 1984 through the first quarter of CY 1985 (i.e., the most recent quarters considered in this report) may be distorted due to the extensive effort devoted to rescoping by some utilities and by INP0.

COMPARlSON OF NPRDS FAILURE REPORTS AND LERs The initial evaluation of the NPRDS data consisted of sampling approximately 100 LERs and attempting to find corresponding NPRDS failure reports for the failures described in the LERs.

Task A The first sample (Sample A) involved failures that occurred in January I

through August 1981 (before INP0 assumed responsibility for the management of NPRDS). Based on the description of the failures contained in the LERs, the analysts identified 97 failures that they believed should have been reported to NPRDS.

The analysts then attempted to find corresponding NPRDS failure reports for the 97 reportable failures. In the NPRDS data base as it existed in October 1981 (i.e., Tape A), only 11 failure reports that matched the failures described in the LERs were found. Therefore, less than 12% (i.e.,11 of 97) of the failures that should have been reported to NPRDS had actually been reported as of October 1981.

The analysts also reviewed the entry in Block 24 of the LER where the licensee is requested to enter a "Y" if an NPRDS failure report had been or would be submitted for one or more of the failures described in the LER.

Of the 100 LERs in the sample, 50 LERs (representing 55 failures) indicated that an NPRDS failure report had been submitted. However, only ten matching NPRDS failure reports were found [the eleventh report referred to above was for an LER coded as not being reportable to NPRDS, (i.e., an "N" in Block 24)].

Table 1: Results of Task A Event Dates: January 1981-August 1981 NPRDS Data Base as of: October 31, 1981 (Tape A)

LERs Sampled (Sample A): 100 Failures Identified: ~121 Failures Reportable to NPRDS: 97 Failure Reports Found in NPRDS File (Tape A): 11 LERs That Indicated an NPRDS Failure Report Submitted: 50 (55 failures)

Sample B and Beyond Subsequent samples of LERs have been analyzed using LERs from the first These quarter of CY 1982 (Sample B) through the first quarter of CY 1985 (Sample N).

I samples have been compared tc the NPRDS data base. NPRDS data for more recent quarters will continue to be evaluated quarterly and the results described in subsequent reports.

In addition to comparing each sample of LER reported failures to the associated NPRDS tape (e.g., Sample C to Tape C), each version (i.e., data tape) of the data base was used to analyze preceding samples (e.g., Tape C was searched to find reports of failures in Samples B and A). For tapes G through K, only the preceding three quarters were analyzed in this way. For tape N, the analysis included the preceding six quarters in order to determine if sub-stantial numbers of failures were being reported as much as 18 months af ter the event.

The results of these analyses are sumarized in Tables 2, 3, and 4. Table 2 identifies the sample period and the number of failures reportable to NPRDS from each sample [e.g., the sample from the period October-December 1982 (Sample E) described a total of 110 component failures that should have been Table 3 identifies when NPRDS evaluation tapes were reported produced. to NPRDS). Prior to the the fourth quarter of CY 1983, each tape reflected the NPRDS data file as it existed one month after the close of the quarter to account for the pemissible 30 day delay in submitting NPRDS reports (e.g.,

31,1983). In

~ Tape E contains the HPRDS data base as it existed on January order to be consistent with the analysis procedures used by INP0, the tapes beginning in the fourth quarter of CY 1983 (Tape I) contain the data base as it existed on the last day of the subject quarter (e.g., Tape K contains the NPRDS data base as it existed on June 30, 1984).

~ Table 2: Samples NPRDS Reportable Sample Sample Period Failures in Sample A Jan-Aug 1981 97 B Jan-Mar 1982 104 C Apr-Jun 1982 99

- D Jul-Sep 1982 107 E Oct-Dec 1982 110 F Jan-Mar 1983 112 G Apr-Jun 1983 99 H Jul-Sep 1983 101 I Oct-Dec 1983 100 J Jan-Mar 1984 100 K Apr-Jun 1984 100 L Jul-Sep 1984 100 M Oct-Dec 1984 100 N Jan-Mar 1985 100

Table 3: Versions of the NPRDS Data Base Version Date of Version A Oct 1981 B Apr 1982 C Jul 1982 D Oct 1982 E Jan 1983 F Apr 1983 G Jul 1983 H Oct 1983 1 Dec 1983 J Mar 1984 K Jun 1984 L Sep 1984

  • M Dec 1984
  • N Mar 1985
  • Data for the third quarter and fourth quarter of CY 1984 were included in Tape N.

Transaction dates were used to reconstuct the data base as it existed at the end of each quarter. .

Finally, Table 4 contains the results of efforts to find corresponding NPRDS failure reports for failures described in the sample LERs (e.g., Tape D contained NPRDS failure reports for 25 of the 97 NPRDS-reportable failures in LER Sample A).

It is interesting to note that new NPRDS failure reports are still being added to the data base many months after the failure actually occurred.

For example, Tape N (March 1985) contains six new reports of failures that occurred in the final quarter of CY 1983 (Sample 1).

Table 4: Summary of Matching NPRDS Failure Reports and LER-Reported Failures Version (Tape)

A B C D E F G H I J K L M N A 11 21 25 25 30 31 B 0 4 8 14 21 C 1 2 5 16 Sample D 1 6 12 13 4 13 16 38 E

p 5 12 43 46 3 20 G

21 33 40 40 41 41 42 H

g 18 38 41 43 44 50 g 19 41 42 42 43 12 28 43 47 7 23 29 5 24 g

N

Conclusions The NPRDS data for the first quarter of CY 1985 shows that: (1) The percentage of NPRDS-reportable failures that have ultimately reached the data base has remained constant at approximately 45%, and (2) the percentage of HPRDS-reportable failures reported during the quarter in which they occurred has declined from approximately 20% to approximately 5%. This stagnation may be due, however, to the extensive effort required for the major rescoping of the NPRDS data base during the period from the third quarter of CY 1984 (Sample L) through the first quarter of CY 1985 (Sample N).

MEASURES OF NPRDS PARTICIPATION Table 5 indicates that the quantity of reporting has declined slightly in recent quarters. In the first quarter of CY 1985, a total of 2178 reports were received; a 7% decline compared to the first or second quarters of CY 1984. Figure 1 is a plot of component failure transactions for the NPRD System as a function of calendar quarter. While these numbers do not reflect the level of timely reporting, they do in a sense measure NPRDS activity or effort. The figures show an unevenness and a leveling off in NPRDS reporting in recent quarters. This reporting pattern may again be due to the effort devoted to the rescoping activites.

Table 5: Timeliness of NPRDS Failure Reports Year in Transaction Quarter which the (Quarter in which the report was added to the d,ata base) failure occurred 83-1 83-2 83-3 83-4 84-1 84-2 84-3 84-4 85-1 1985 193 1984 - - - -

371 1072 1323 1188 1266 1983 72 191 1088 1304 1019 602 230 70 322 1982 604 260 639 454 222 185 59 10 153 1981 201 34 146 132 159 139 37 1 66 1980 90 28 77 54 223 168 51 3 135 1979 75 6 19 43 74 113 14 0 5 1978 58 5 6 29 35 32 12 4 17 1977 13 1 3 14 50 25 14 5 9 1976 0 7 4 3 39 6 10 0 2 1975 3 4 3 8 37 8 7 0 7 1974 0 2 1 16 71 6 4 0 3 1973 1 0 0 0 7 0 0 0 0 III7 T3T T95T YU57 YJ07 77!is T76T TYBT YITE

v ~

g E

l i l I l l l l

- - n E

- ~

c

_ - n ,

9 s <-

w

- u >-

i e

e, w

=

- s x - _ , c:

m <

a

n c

- n

-.- . m E

- N c

l I l \ l l I l l -

/\

e e o e e o e o e o o m o m o m o M o o m n o e- o u o r- m m N N N * = ~ ~

E318YGD E3d 031E0d38 S38071Vd

One is tempted to divide the quarterly figures by the numberUnfortunately, of eligible l

j plants and use this figure for tracking NPRDS completeness.such an often reflects the contribution of only a small group of plants reporting to the system. For example, in the fourth quarter of CY 1982 a total Howe.6r, twoofunits 1,528 component failure reports were entered into the file.

accounted for 783 (51%) of the total entries for the quarter, and there were no entries for 44 plants. Thus, summary statistics (e.g., average number of failure reports per plant per year) continue not to be good measures of NPRDS participation.

Figures 2 through 6 plot the number of plants vs. the number of reports for each plant for the quarter (e.g., from Figure 2, in the first quarter of 1984, 37 plants submitted between 1 and 20 reports). Clearly a key figure to watch is the number of plants that did not submit any reports in a given quarter. By comparing Figures 2 and 6, it can be seen that between the first quarter of CY 1984 and the first quarter of CY 1985 the number of plants that did not submit any failure reports during the quarter increased from 7 to 11.

In addition, it must be recognized that one report from each plant for a period of three months would result in 100% of all plants For the" first participating",

quarter but would.not constitute acceptable participation.

of CY 1985, 28 plants submitted more than 20 reports. Thus, these plants were participating at app.oximately the rate projected by INP0 (approxi-mately 100 reports per year) for plants that are fully participating in NPRDS.

However, the participation of the majority of plants [49 of 77 plants (64%)] fell short of this goal.

The staff also considered the level of participation of individual units from a somewhat different perspective. Figures 7 and 8* indicate the number of failures from CY 1983 and CY 1984, respectively, reported by the units eligible to participate in the NPRD System. INP0 has estimated that a plant that is actively participating in theToNPRD allow System would submit for uncertainties, the approxi-mately 100 failure reports each year.

staff has expanded this estimate to a range of 80 to 120 failure reports.

On this basis, a plant that is actively participating in the NPRD System should submit more than 80 failure reports each year.

From Figures 7 and 8, it would appear that only 14 units were active This number increased to 26 units participants in 1984. in the HPRD System in 1983. Conversely, and perhaps more im 53 units in 1984 do not appear to have submitted sufficient reports to be

  • The underlying data to support these summary tables are provided in Attachment A. The NRC has agreed not to publicly release plant -

specific NPRDS data (e.g., Attachment A) pending the results of an on-going NRC review of an INPO request that plant-specific NPRDS data be held in confidence.

Figure 2 1ST QTR 84- COMPONENT FAILURE REPORT COUNTS LEGEND C21 NUI' ITER OF FLANT3 WITIIIN RANGE g.

Ei g- .

8-

~

E' .

~

us-15 m

11-2-

e F W y W 3 y y y y T

  • ' g g g g g y y W F 5 W W asaasaseaaagsaaasaasasaas l g

=

A #' 4 ' T T T T T 7 7 , 77 7 77 7 7 T T T T T V

" " aN35il565555EEMMU5355 NUMUER OF COMPONENT FAILURE REPOR13 o

O e

Figure 3 2ND QTR 84 COMPONENT FAILURE REPORT COUNTS I.EGEND E29 NUNilER Or l'LAff!3 WITIIIN RAffCE Q- ,

8-b- .

g.-

e -

B a- -

n_ +

s e

b i M N

= , , .

.b,M.8.a a n.a a a a a a a a o a

. . . . . . . a A.a a a 9 ,9 9- ,9 H, H, 2, H, H, $ H, 2, H, H, N, 'M, i~ $ H, $, $ 3, i Y 39

'. Yn w" m h

, NUMDER OF COMPONENT PRILURE REPORTS e

  • _ . ... f

u 0 009-19t e

g -

E 0 09t-19)

Z D E 0 09t-itt o g -

0 ott-itt I

c

' O Det-tot g" ,$,,$ '

0 00>-13C k

Y o 0 09C-190

- t 0

0.c- m l

E:0 i

  • 0 D'8-13c D 0 0 DEC-TOC ,
  • a _

E

- o eies N

= t<= 0 3 1 f , 093-195 g b 0 093-It3 g Z

E  !

M 0 Ote-122 -

z -

o Dae-tos i c) a .

0 00e-191 g 2 ,

o 0 09I-191 i O i 4 1[091-It!

i i

co 0 Ott-tri i 1

M 0 DET-101 s

cy t}.- oor-m a

g -

1} oe-a Oik%%\\N oo-n M  ;

Cex% % % % %NNT ot-a sch%\%%%%%\\%%\T De-I h%S'0 L

l e A e A e e e 6 .

-- SETId Jo IGEMllR -

I,

Figure 5 4TH QTR 84 COMPONENT FAILURE REPORT COUNTS LEGEND E23 NUMDER OF PLANTS WITIIIN RANGE S- .

8 R-R-

U8 i 5- '

it.

b a- ,

J Ei ln-9-

e- 4 e , , , , . , , . . , , , , . . . .

e y e e8' s7 sT e T Te Ts?s.n, e s a, s7 7e 7e 7e7sTsTe s, sT eT Vs

' .!. ' ')' 7 N

s8 g4 E- -s- ~s g

- ~4 ~

s n~g0~

s sgr n, n ~ c 4 4, s, s, -

NUMDER OF COMPONENT FAILURE REPORTS

)

l Figure 6 .

IST QTR 85 COMPONENT FAILURE REPORT COUNTS LEGEND E23 NUMt1ER OF PLANTS WITIIIN RANGE s- g n-8-

1 l'!

g n-s'  ?

Ei a-

!5 '

e

  • G n-z

,' 9-

-- + .

. . . . .O.O. . . . . . . . .

  • . .- . . . .O. .

o O8 3 E8m n8n 8n n3n 8 8 8 8 8 8, 3, 8, 8, 8 u3 - mm 8, 8,  ?,,, 8, 8, 7

~

" *

  • OOOE555N$NNNNN5NNO555 uuunta or couronent ruwne neroars {

9

. '-  : = ._ ...__-.

1('el: ,

Ext'ent of Plant Participation in 1983

, ' ' By Number of 1983 Failures'. Reported

- i I

l.ess Than Active l ipat on

, Active Partic'dnts '

'2b  : Paiticipation.  : (14'hl (63 plants) 3 i

j .. .,.

20 ,, . I.

,( - ~

ng i ,

1 15 .

13 .

. ,.13

. .  : .: g

, ,s.

. .Q i- .

39 -

.'.i.

s. .

4 4 r 4 4 . ,

  • ~ '

. _. :3

. 1 . 1 _ 02

.94

. 0 3

_,i __ _ i . ._ , -

-i ._ -- -

.,y'O,'

- ', 1 21-40 41-60 .

61-00  : 0,1-100 101-120 121-140- '141-160 '161-186 * >: 90 g  % .

Number of Failures Reported (X)

, .i - .

Figure} i

,i . >

l

  • Extent of Plant Participation in 1984 i' -

J -

Dy Number of 1984 Failures Reported -x Less Than Active Active Participation Participation (26 plants) 22.. (53 plants)

I

  • , l 16' . f 1

t .

., i : l'  :' . . '. .

..u 3

i . .

t 9- De e.

,'. l

-l .

S.*.

6,

. .. 5 .. ,

4 3  : 3 3 I 285

- 227 i

ii 217 -

0 - " -

!  ; . 187 ,

>180 '

JFT;IUC 10r-T20'-'.1X1-13. l.41-160'

% f 21-40,. 61-80

..,41-b,U ,.

ul-luu

...,.1-20, ,

.. . g . .

.l . .

s s1 ..

'I

  • Nuinber of Failures Repot ted ('X). -

i . ,

I Finnen n -

m_ .

r 9

classified as active participants. Thus, in 1983 approximately 80% of the plants were not participating at a level thought to represent active participation. In 1984, the extent of participation increased; however, about 65% of the plants still were below the threshold assumed for an active participant in this system which includes 4000-6000 components per unit.

Additionally, it should be noted that 41 plants or about one-half of the eligible plants did not submit sufficient reports in either 1983 or 1984 to be classified as an " active participant" (See Table A-2 in Attachment A). In addition, 26 units submitted 20 or fewer reports of failures that occurred in 1983. This number decreased to 22 units in 1984. The staff believes that participation gt this level is indicative of only token participation and is clearly indicative of units that are not actively participating in the NPRD System.

While there is obviously considerable uncertainty in this analysis, it clearly indicates that while there are an increasing number of units that are actively participating in the NPRD System, there are still many units that are not yet actively participating in the system and there are a number of units that are still providing only token participation in the system.

INPO has indicated that the extent of unit participation has substan-tially increased in the second quarter of 1985, and that participation is expected to further increase now that the rescoping activity has been completed. The next semiannual report will analyze the second and third quarters of 1985.

Conclusions A large percentage of eligible plants submitted failure reports to the NPRD System in the first quarter of CY 1985. For this quarter, 66 plants submitted at least one failure report. However,11 plants did not submit any failure reports during the quarter. In addition, there are still many plants that have submitted a rather small number of reports (38 plants submitted from 1 to 20 reports each during the most recent evaluation quarter). The majority of plants seem to be providing only limited participation in the NPRD System. The percentage of plants which are actively participating is increasing but at a slow rate. It is hoped that the extent of plant participation will increase, perhaps significantly, following completion of the rescoping work described earlier.

TIMELINESS OF NPRDS DATA On January 28,1983, INP0 sent a letter to utilities urging that priority in failure reporting be given to recent failures. The staff has examined l

N the data to determine the degree of response to this letter in terms of quantity and timeliness of the data.

Table 5 shows the component failure records sorted by the transaction quarter (i.e., the quarter that the record was added to the data base) and the year in which the failure occurred.

In tems of the timeliness of reporting, in the first quarter of CY 1985 1459 component failures were reported that occurred in 1984 or in By comparison, 1985. the This number is 67% of the total entries for the quarter. f first quarter of CY 1984, only 1390 reports (60%) of the reports described failures that occurred in 1983 or 1984.

Conclusion The timeliness of NPRDS failure reporting continues at approximately the In the first quarter of 1985, 67% of the same level observed in 1984.

reports submitted described failures that occurred in 1984 or 1985.

Thus, about one third of the reports submitted in this quarter reflect component failures that occurred more than one year ago, and in fact component failures from 1974 continue to be reported.

QUALITY OF THE NPRDS FAILURE REPORT NARRATIVE To assess the quality of the NPRDS Failure Reports, a sample of NPRDS Failure Reports was selected and the narrative description of the failures were reviewed to determine if the text described the failure in sufficient detail that system users could understand the failure, it.s causes, corrective actions, and the implications for similar equipment. The narratives were The results of th.is graded as adequate, probably adequate, and inadequate.

analysis are presented in Table 6.

Table 6: Quality of NPRDS Failure Reports Fourth Quarter First Quarter Second Quarter First CY 1984 CYQuarter 1985 CY 1983 CY 1984 ~-

46% 80%

71% 63%

Adequate 97% 92% 97%

95%

46% 17%

34%

Probably Adequate 24%

8% 3%

5% 3%

Inadequate Total Number of 68 72 106 NPRDS - 4 Foms 62 Evaluated The percentage of adequate and probably adequate narratives has remained 4 essentially constant in a range from 92% to 97%.

Conclusions The quality of the NPRDS reports (particularly the failure reports) Over 90%

has remained essentially constant at a relatively high level.

of the NPRDS failure reports were judged to considered This is contain sufficient to be informa-fully tion to permit meaningful analysis.

satisfactory and a strong point in the system's implementation.

OVERALL

SUMMARY

The improvement in the NPRD System reporting first seen in the third quarter of CY 1983 has declined somewhat through the first quarter of CY 1985.

While the overall improvements continue to be significant, There were further improvements were expected, but have not occurred.

still 11 plants (compared to 7 in the first quarter of CY 1984) that did not submit any failure reports during the quarter, and 38 plants (compared to 37 in the first quarter of CY 1984) that submitted 20 or fewer reports in the subject quarter.

While the NPRD System is substantially improved compared to the system as it existed in 1981, it is of continued concern that the majority of plants have not met the threshold considered representative of an " active partici-pant". Thus, the staff is becoming increasingly concerned that the NPRD System may not reflect a consistent and high level of reporting from all units. This objective, however, is a necessary prerequisite for the system to be used as a basis for statistical analysis of component failures, and to be used as a source of component failure data for specific analyses (e.g., in assessing the type and frequency of failures involved with the Dav event).

of participation, predicted by INPO, are not confirmed in the next assessment period.