HL-5679, Submits Response to RAI Re Extended Power Uprate LAR

From kanterella
Jump to navigation Jump to search
Submits Response to RAI Re Extended Power Uprate LAR
ML20151W110
Person / Time
Site: Hatch  
Issue date: 09/11/1998
From: Sumner H
SOUTHERN NUCLEAR OPERATING CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
HL-5679, NUDOCS 9809150180
Download: ML20151W110 (3)


Text

.

s ~"' j

' Lewis Samner soutern Nuclear

~..

Vce President.

Opwoung Conyemy,Inc.

Ilatch Project Support 40 invemess Parkway

=

Post Office Box 1295 Birmingham. Alabama 35201 Tel 205.992.7279 fax 205.992.0341 1

M br COMPANY Energy to Serve YourWorld" September 11, 1998 Docket Nos. 50-321 HL-5679

~ 50-366 i

I U.S. Nuclear Regulatory Commission i

ATTN: Document Control Desk -

E Washington, D.C. 20555

)

Edwin I. Hatch Nuclear Plant l

I Request for AdditionalInformation on ExtendedPower Ucrate License Amendment Reauest i

Gentlemen:

In the original extended power uprate submittal dated August 8,1997, Southern Nuclear Operating Company (SNC) provided the results of an assessment of the Plant Hatch

' probability risk assessment (PRA) considering the impact of extended power uprate. The change in core damage frequency (CDF) provided is the result of a bounding assessment which determined the impact of the higher power level on CDF. The results of the assessment indicated the potential changes in CDF as a result of extended power uprate were due to the change in operator response time required in a failure to depressurize with I

a loss of high pressure injection (non ATWS). It should be noted, the original individual plant examin.ation (IPE) PRA operator response times were based on calculations using input data from the Plant Hatch simulator.

j In response to a Nuclear Regulatory Commission (NRC) request for additional information, the SNC ' submittal of May 6,1998 provided the difference in operator response times for specific operator actions. The operator response times in the original PRA assessment were established from simulator data, and the extended power uprate

'i assessment response times were calculated using Modular Accident Analysis Program (MAAP) analyses. Since the operator response times were calculated using different D

methods, the change in available time cannot be derived by taking the difference in the response times provided.

3 T' IT, O Subsequent to the initial extended power uprate submittal and the responses to the associated requests for additional information, analyses were performed utilizing similar

=r:lwlologies. Specifically, the impact of the extended power uprate on the time available to the operator to depressurize the reactor under a non-ATWS condition (operator action DE4) and the related affect on the operator failure probability was evaluated using MAAP analyses.

9e0915o100 980911 Ef

  1. Et2

U.S. Nuclear Regulatory Commission Page 2 September 11, 1998 In the original bounding case evaluation for DE4, the operator failure probability was postulated to have increased by a factor of two. This assumption conseivatively accounts for any possible loss of operator response time at the higher power conditions. To establish a common basis for evaluating the change in time available to the operators, additional MAAP analyses were performed at original power (2436 MW ) and extended power uprate (2763 MW) conditions. The MAAP modeling assumptions are consistent i

between the two cases except for power level and physical plant changes due to the increased power level. The results are tabulated as follows:

Time to water kvel Operator time to initiate Time to water level Power Level of-101" depressurization of-200" (minutes)

(minutes)

(minutes) 2436 M W, 1.0 1.1 2.1 2763 MW.

0.9 1.2 2.1 As shown above, the results of the MAAP analyses demonstrate the change in operator response time, when evaluated utilizing similar methodologies, is insignificant. Therefore, the results of the bounding case evaluation provided in the August 8,1997 submittal are considered conservative.

Should you have any questions in this regard, please contact this office.

Sincerely, H. L. Sumner, Jr.

DLM/eb cc: See next page HL5679

O l~~

l U.S. Nuclear Regulatory Commission Page 3 f

September _ 11, 1998 1

cc: Southern Nuclear Overatinz Comnany Mr. P. H. Wells, Nuclear Plant General Manager l

SNC Document Management (R-Type A02.001)

U.S. Nuclear Rezulatory Commission. Washington. D.C.

l Mr. L. N. Olshan, Project Manager - Hatch U.S. Nuclear Regulatory Commission. Rezion H Mr. L. A. Reyes, Regional Administrator Mr. J, T. Munday, Senior Resident Inspector - Hatch i

tb e

l i

I

+

).

l HL5679 l

s n-