HBL-93-060, Forwards Rev 6 to Pacific Gas & Electric Co Humboldt Bay Plant Unit 3 - Safstor QA Plan

From kanterella
(Redirected from HBL-93-060)
Jump to navigation Jump to search
Forwards Rev 6 to Pacific Gas & Electric Co Humboldt Bay Plant Unit 3 - Safstor QA Plan
ML20058P619
Person / Time
Site: Humboldt Bay
Issue date: 10/14/1993
From: Rueger G
PACIFIC GAS & ELECTRIC CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20058P622 List:
References
HBL-93-060, HBL-93-60, NUDOCS 9310250114
Download: ML20058P619 (1)


Text

.

c.

Pacific Cas and Bectric Company 17 F 3 E N ii.c n M 51 G e;;my M Rmn Pob;mn ss. y m Pn&r! a

.C. i it:; _ <

Grg,,,

j yyp ud (g r ; ya G

415 T'l e ',

fd. t jr [

=

Fu w:72 ::u October 14, 1993 PG&E Letter No. HBL-93-060 b N )m r msg U.S. Nuclear Regulatory Commission Ef(/g j

!l ATTN:

Document Control Desk g

Washington, D.C.

20555 Re:

Docket No. 50-133, OL-DPR-7 Humboldt Bay Power Plant, Unit 3 SAFSTOR Ouality Assurance Plan, Revision 6 Gentlemen:

PG&E hereby submits the Custodial SAFSTOR Facility Quality Assurance Plan, Revision 6.

This revision supersedes Revision 5, submitted by PG&E Letter HBL-91-025, dated July 9, 1991.

This revision reflects the latest changes to PG&E organizational titles and does not constitute any reduction in commitments.

The revised sections are identified by a vertical line in the n,argin.

Sincerely, i

f

. to., A (

h Grego y M. Rueger cc:

Lawrence C. Bell Bobby H. Faulkenberry (2)

Peter E. Rigney Humboldt Distribution (w/o enc.)

Enclosure 6248S/85K/BDP/1739 P

OROne 9310250114 931014 Q

A go$

+

PDR ADOCK 05000133 h

7 P

PDR IL<

ggg

,