HBL-85-012, Tabulation of Personnel Exposure for 1984
| ML20127K819 | |
| Person / Time | |
|---|---|
| Site: | Humboldt Bay |
| Issue date: | 12/31/1984 |
| From: | Shiffer J PACIFIC GAS & ELECTRIC CO. |
| To: | Martin J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V) |
| References | |
| HBL-85-012, HBL-85-12, NUDOCS 8505220198 | |
| Download: ML20127K819 (3) | |
Text
_
PGandE Letter No.:. 2L-85-012 ;
TA8ULATION.OF PERSONNEL EXPOSURE NUMBER OF. PERSONNEL-AND flan-REM BY WORK AND JOB FUNCTION FOR 1984-C
.:o w g.
g Number of Personnei - (7100 mrem)
Total Man-Rem R3 Contract.
Contract
-Station Utility Workers
. Station Utility Workers.
,o WORK ANO JOB FUNCTION.
Enployees Enployees and Othe, Enployees Enployees and Others
- nts og Reactor Operations and Surveillance Maintenance Personnel 0
0 0
0 0
0
' ;0-Operating Personnel 7
0 0
2.3 0
0 Health Physics Personnel 1.5 0
0.5 1.1 0
0.3 Supervisory Personnel 1
0 0
0 0
0 Engineering Personnel 1.5 0
0 0.2 0
0 Routine liaintenance Maintenance Personnel 3
3 0
0.9
- 0. 8 0
Operating Personnel
_0 0
0 0
0 0
Health Physics Personnel 1-0 0.5 1.0 0
0.3 Supervisory Personnel 0
0
.0 0
0 0-Engineering Personnel
.l.5 0
0 0.2 0
0 Inservice Inspection 11aintenance Personnel 0
0 0
0 0
0 Operating Personnel 0
0 0
0 0
0 Health Physics Personnel 0
0 0
0' 0
0 Supervisory Personnel 0
0 0
0 0
0 Engineering Personnel 0
0 0
0 0
0 Special Maintenance (Preparation for SAFSTOR) 11aintenance Personnel 10 2
0 4.9 0.5 0
Operating Personnel 8
0 0
2.6 0
0 Health Physics Personnel 0
0 0.5 0.6 0
0.6 Supervisory Personnel 1
0 0
0.2 0
0 Engineering Personnel 0
0 0
0 0
0
-\\g Note: All exposures are rounded off to the nearest 100 millirem and the number of personnel in each category is identified to reflect the distribution of manpower between job functions.
T
- 0655d/0005K 1-
g TABULATION OF PERSONNEL EXPOSURE Number of Personnel (7100 mrem)
Total Man-Rem Contract-Contract Utility Workers-Utility Workers-WORK ANO JOB FUNCTION Station Enp.
Enployees and Others Station Emp.
Employees and Others Construction liaintenance Personnel 0
0 0
0 0
0 Operating Personnel 0
0 0
0-0 0
Health Physics Personnel 0
0 0
0 0
0 Supervisory Personnel 0
0 0
0 0
0 Engineering Personnel 0
0 0
0 0
0 Waste Processing Haintenance Personnel 3
1 0
0.9 0.1 0
Operating Personnel 5
0 0
2.3 0
0 Health Physics Personnel 1
0 0.5 0.5 0-
- 0. 5 Supervisory Personnel 0
0 0
0 0
0 Engineering Personnel 0
0 0
0 0
0 Refueling Maintenance Personnel 1
0 0
0.9 0
0 Operating Personnel 5
0 0
2.7 0
0 Health Physics Personnel 0.5 0
0 0.2 0
0 Supervisory Personnel 1
0 0
0.2 0
0 Engineering Personnel 0
0 0
0 0
0 TOTAL Naintenance Personnel 17 6
0 7.6 1.4 0
Operating Personnel 25 0
0 9.9 0
0 Health Physics Personnel 4
0 2
3.4 0
1.7 Supervisory Personnel 3
0 0
0.4 0
0 Engineering Personnel 3
0 0
0.4 0
0 GRAND TOTAL 52 6
2 21. 7 1.4 1.7 60 0655d/0005K i!ECEIVE!>
- nc PACIFIC GAS AND E LE C T RIC C.Q M PANY gm. -, - l Pi! l: 2r MbWb l
' 77 BEALE STREET
- SAN FRANCISCO, CALIFORNIA 94106. (415) 781-4211. TWX 910-372 6587 WAC sw e. o..m m a J,o"."U.n,o,.
March 29,1985 PGaadE Letter No.:
HBL-85-012 Mr. John B. Martin, Regional Administrator U. S. Nuclear Regulatory Connission, Region V 1450 Maria Lane, Suite 210 Walnut Creek, CA 94596-5368 Re: Docket No. 50-133, OL-DPR-7 Humboldt Bay Power Plant, Unit No. 3 Tabulation of Personnel Exposure
Dear Mr. Martin:
Pursuant to Section IX.I.1.b. of the Technical Specifications, Appendix A to the Humboldt Bay Unit No. 3 Facility Operating License, PGandE is submitting a tabulation of personnel exposure to radiation, distributed among various groups -and work functions, for the year 1984.
Kindly acknowledge receipt of this material on the enclosed copy of this letter and return it in the enclosed addressed envelope.
Sincerely, f Enclosure cc:
B. G. Brooks Service List
/g 2+
, 3
_. _.