HBL-15-002, Submittal of Annual Radioactive Effluent Release Report for 2014

From kanterella
Jump to navigation Jump to search
Submittal of Annual Radioactive Effluent Release Report for 2014
ML15093A333
Person / Time
Site: Humboldt Bay
Issue date: 03/31/2015
From: Sharp L
Pacific Gas & Electric Co
To:
Document Control Desk, Office of Nuclear Material Safety and Safeguards, Office of Nuclear Reactor Regulation
Shared Package
ML15093A319 List:
References
HBL-15-002
Download: ML15093A333 (1)


Text

Pacific Gas and Electric Company March 31, 2015 PG&E Letter HBL-15-002 Loren D. Sharp Director & Plant Manager Humboldt Bay Nuclear Humboldt Bay Power Plant 1000 King Salmon Ave Eureka, CA 95503 Phone: 707.444.0819 Fax:

707.444.0871 email: LDSL@PGE.COM 10 CFR 50, Appendix I 10 CFR 50.36 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Docket No. 50-133, OL-DPR-7 Humboldt Bay Power Plant Unit 3 Annual Radioactive Effluent Release Report for 2014

Dear Commissioners and Staff:

contains the Humboldt Bay Power Plant Unit 3 "Annual Radioactive Effluent Release Report," covering the period January 1 through December 31, 2014. This report is required by Appendix B, Section 8.3 of the Humboldt Bay Quality Assurance Plan. contains Revision 25 to the "SAFSTOR Offsite Dose Calculation Manual" as required by Specification Section 4.2 of the "SAFSTOR Offsite Dose Calculation Manual." contains Revision 22 to the "SAFSTOR Offsite Dose Calculation Manual" resubmitted for the Annual Radioactive Effluent Release Report for 2012 to properly annotate changes with revision bars and dates.

There are no regulatory commitments made in this letter. If you have any questions concerning this information, please do not hesitate to contact Mr.

James Morris at 805-545-4609.

Loren D. Sharp

,Aooý cc:

Marc L. Dapas, NRC Region IV Administrator John B. Hickman, NRC Project Manager HBPP Humboldt Distribution Enclosures Kf05~2