Transmittal of Annual Radioactive Effluent Release Report for 2008
ML091030121
Person / Time
Site: Humboldt Bay
Issue date: 03/26/2009
From: Roller P
Pacific Gas & Electric Co
To:
Document Control Desk, NRC/FSME
References
HBL-09-003
Download: ML091030121 (1)


Text

Pacific Gas and Electric Company 1000 King Salmon Avenue Humboldt Bay Power Plant Eureka, CA 95503 PaulJ. Roller 707/444-0700 Directorand Plant Manager Humboldt Bay Nuclear March 26, 2009 PG&E Letter HBL-09-003 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Docket No. 50-133, OL-DPR-7 Humboldt Bay Power Plant Unit 3 Annual Radioactive Effluent Release Report for 2008

Dear Commissioners and Staff:

contains the Humboldt Bay Power Plant Unit 3 "Annual Radioactive Effluent Release Report," covering the period January 1 through December 31, 2008. This report is required by Section 3.7.3 of the Humboldt Bay Power Plant Unit 3 SAFSTOR Quality Assurance Plan. contains Revision 15 to the "SAFSTOR Offsite Dose Calculation Manual" as required by Specification Section 4.2 of the "SAFSTOR Offsite Dose Calculation Manual."

There are no regulatory, commitments made in this letter.

Sincerely, Paul J. Roller cc: Elmo E. Collins, Jr.

Joe Davis John B. Hickman PG FossilGen HBPP Humboldt Distribution Enclosures C)