GO2-98-074, Forwards Audit 298-008, WNP-2 Emergency Preparedness Program, Per NUREG-0654,Section Ii,Criteria P.9

From kanterella
(Redirected from GO2-98-074)
Jump to navigation Jump to search
Forwards Audit 298-008, WNP-2 Emergency Preparedness Program, Per NUREG-0654,Section Ii,Criteria P.9
ML17292B366
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 04/28/1998
From: Bemis P
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML17292B367 List:
References
RTR-NUREG-0654, RTR-NUREG-654 GO2-98-074, GO2-98-74, NUDOCS 9805070333
Download: ML17292B366 (3)


Text

CATEGORY 1 REGULAT~ Y INFORMATION DISTRXBUTXO SYSTEM (RIDS)

~ACCESSION NBR:9805070333 DOC.DATE: 98/04/28 NOTARIZED: NO FACIL:50-397 WPPSS Nuclear Project, Unit 2, Washington Public Powe AUTH.NP~NC', ~

AUTHOR AFFILIATION BEMXS,P.R.

Washington Public Power Supply System RECXP.NAME RECXPXENT AFFILIATION Document Control Branch (Document Control Desk)

DOCKET 05000397

SUBJECT:

Forwards Audit 298-008, "WNP-2 Emergency Preparedness Program," per NUREG-0654,Section II,Criteria P.9.

C D1STRIBUT1ON CODE:

A045D COPIES RECEIVED:LTR I

ENCL J S1ZE:

TITLE: OR Submittal:

Emergency Preparedness

Plans, Implement'g Procedures, C

T NOTES:

E RECIPIENT XD CODE/NAME PD4-2 LA POSLUSNY,C COPIES LTTR ENCL 1

1 1

1 RECIPIENT ID CODE/NAME PD4-2 PD COPIES LTTR ENCL 1

1 INTERNAL: AEOD/HAGAN,D NRR/DRPM/PERB EXTERNAL: NOAC 1

1 1

1 1

1 NRC PDR 1

1 E~KUW 04~

2 2

NUDOCS -

8TRKCT 1

1 D

NOTE TO ALL "RIDS" RECIPIENTS PLEASE HELP US TO REDUCE WASTETH TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD)

ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED:

LTTR 10 ENCL 10

4',

~

n L

J

~

~

April28; 1998 G02-98-074 WASHINGTONPUBLIC POWER SUPPLY SYSTEM PO. Box 968

~ Richland, Washington 99352-09ty8 Docket No. 50-397 V.S. Nuclear Regulatory Commission Document Control Desk Washington, D.C. 20555 Gentlemen:

Subject:

WNP-2, OPERATING LICENSE NPF-21, 1998 QUALITY AUDITOF WNP-2 It22IERGENCY PREPAMH)NESS PROGRAM Enclosed is a copy of the 1998 Quality Auditof the WNP-2 Emergency Preparedness Program.

This is transmitted to your organization in accordance with NVREG-0654,Section II, Criteria P.9.

Three Problem Evaluation Requests (PERs) and twelve recommendations for improvement were issued as a result of audit activities.

Though some opportunities for improvement exist within the Emergency Preparedness area, the audit results indicate that the WNP-2 Emergency Preparedness Program is capable ofprotecting the health and safety of the public in the event of an emergency.

If you have any questions regarding the audit, please contact Tim Messersmith, Corporate Emergency Preparedness, Safety Ec Health Officer at (509) 377-8568.

Respectfully, P. R. Bemis (MailDrop PE23)

Vice President, Nuclear Operations

Enclosure:

Quality Audit 298-008 cc:

EW Merschoff - NRC RIV KE Perkins, Jr. - NRC RIV, WCFO C Poslusny, Jr. - NRR DLWilliams - BPA/399 NRC Sr. Resident Inspector - 927N D Meggs - Oregon DOE S May - DOH Div. ofRadiation Protection G Good - NRC Region IV LMoore - FEMA Region X LRamsey - Wash. State Emerg Mgmt J Scheer - Franklin County Emerg Mgmt T Hobbs - Benton County Emerg. Mgmt N Goevelinger - Oregon State Health Division P 9805070333 980428 PDR ADQCK 05000397 F

PDR