GO2-97-202, Informs That Util Will Not Be Able to Provide Response for Staff to Maintain Review Schedule within 30-day Time Period. Info Will Be Provided on or Before 971205

From kanterella
(Redirected from GO2-97-202)
Jump to navigation Jump to search
Informs That Util Will Not Be Able to Provide Response for Staff to Maintain Review Schedule within 30-day Time Period. Info Will Be Provided on or Before 971205
ML17292B109
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 11/07/1997
From: Bemis P
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
GO2-97-202, NUDOCS 9711140182
Download: ML17292B109 (4)


Text

CATEGORY REGULA'Y INFORMATION DISTRIBUTI SYSTEM (RIDS)

ACCESSION NBR:9711140182 DOC.DATE: 97/11/07 NOTARIZED: NO DOCKET' FACIL:50-,397 WPPSS Nuclear Project, Unit 2, Washington Public Powe 05000397 AUTH.NAME AUTHOR AFFILIATION BEMIS,P.R.

Washington Public Power Supply System RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)

SUBJECT:

Submits request for amend. to secondary containment S standby gas treatment Tech Specs schedule for submittal of addi info.Requested info will be provided on or before 971205.

DISTRIBUTION CODE:

A001D COPIES RECEIVED:LTR ENCL SIZE:

TITLE: OR Submittal:

General Distribution C

NOTES:

RECIPIENT ID CODE/NAME PD4-2 LA

, COLBURN, T COPIES LTTR ENCL RECIPIENT ID CODE/NAME PD4-2 PD COPIES LTTR ENCL E

0 INTERNAL:. ACRS NRR/DE/ECGB/A NRR/DRCH/HICB NRR/DSSA/SRXB OGC/HDS3 01 NRR/DE/EMCB NRR/DSSA/SPLB NUDOCS-ABSTRACT EXTERNAL: NOAC NRC PDR D

E N

NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS

, OR REDUCE THE NUMBER OF COPZES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD)

ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED:

LTTR 14 ENCL

~A l' k

WASHINGTON PUBLIC POWER SUPPLY SYSTEM P.O. Box 968

~ Richland, Washington 99352-0968 November 7, 1997 G02-97-202 Docket No. 50-397 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.C. 20555 Gentlemen:

Subject:

WNP-2, OPERATING LICENSE NPF-21 REQUEST FOR AMENDMENTTO SECONDARY CONTAINMENTAND STANDBY GAS TREATMENT TECHNICAL SPECIFICATIONS SCHEDULE FOR SUBMITTALOF ADDITIONALINFORMATION

~

References:

1)

Letter, dated October 15, 1996, PR Bemis (SS) to NRC, same subject 2)

Letter, dated October 15, 1997, TJ Colburn (NRC) to JV Parrish (SS),

"Request for Additional Information for the Washington Public Power Supply System (WPPSS)

Nuclear Project No. 2 (WNP-2) (TAC No M96928)"

The Reference 1

letter submitted a

request for amendment to the WNP-2 Technical Specifications for secondary containment and the Standby Gas Treatment (SGT) system.

The Reference 2 letter requested additional information and a 30-day response for the staff to maintain its review schedule.

The Supply System will not be able to provide the response within the 30 day time period.

However, the requested information willbe provided on or before December 5, 1997.

Should you have any questions regarding this matter, please call me or Mr. P. J. Inserra at (509) 377-4147.

es t ll

. R.

Vice President, Nuclear Operations.;;

'al cc:

EW Merschoff - NRC RIV KE Perkins, Jr. - NRC RIV, WCFO TG Colburn - NRR 97iii40i82 97ii07 PDR ADQCK 05000397 P

PDR NRC Sr. Resident Inspector - 927N DLWilliams - BPA/399 PD Robinson - Winston &Strawn llllllllllllllllllllllfllll[llllllllllll

p,

~

I~