GO2-95-264, Monthly Operating Rept for Nov 1995 for WNP-2

From kanterella
(Redirected from GO2-95-264)
Jump to navigation Jump to search
Monthly Operating Rept for Nov 1995 for WNP-2
ML17291B154
Person / Time
Site: Columbia 
Issue date: 11/30/1995
From: Embree D, Parrish J
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
GO2-95-264, NUDOCS 9512130004
Download: ML17291B154 (7)


Text

R.IC)P I EY' CCELERATED RIDS PROCESSING)

REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSXON NBR:9512130004 DOC.DATE: 95/ll/30 NOTARXZED: NO DOCKET N

FACIL:50-397 WPPSS Nuclear Project, Unit 2, Washington Public Powe 05000397 AUTH.NAME AUTHOR AFFILIATION EMBREE,D.G.

Washington Public Power Supply System PARRISH,J.V.

Washington Public Power Supply System RECIP.NAME RECIPIENT AFFILIATION

SUBJECT:

Monthly operating rept for Nov 1995 for WNP-2.W/951207 ltr.

DISTRXBUTION CODE:

IE24D COPIES RECEIVED:LTR ENCL SIZE:

TITLE: Monthly Operating Report (per Tech Specs)

NOTES:

RECIPIENT ID CODE/NAME PD4-2 PD INTERNAL:

ILE CENTER~1 RG EXTERNAL: LITCO BRYCE,J H

NRC PDR COPIES LTTR ENCL 1

1 10 10 1

1 1

1 1

1 1

1 RECIPIENT ID CODE/NAME CLIFFORD~J AEOD/SPD/RRAB NRR/DRPM/PECB NOAC COPIES LTTR ENCL 1

1 1

1 1

1 YOTE TO ALL"RIDS" RECIPIEYTS:

PLEASE HELP US TO REDUCE 4V5STE! CONTACTTHE DOCL'XIEYTCOiTROL DESk, ROOM PI-31 (EAT. 504-'2083 ) 'I'0 ELIMINATEYOL'R NAMLFROiI DISTRIBUTIOY.LIS'I'S I'OR DOCI;h,!EX'I'S YOL'Oi "I'E!;D!

TOTAL NUMBER OF COPIES REQUIRED:

LTTR 19 ENCL 19

@~i WASHINGTON PUBLIC POWER SUPPLY SYSTEM P.O. Box 968

~ 3000 George Washington Way

~ Richland, Washington 99352 December 7, 1995 G02-95-264 Docket No. 50-397 U. S. Nuclear Regulatory Commission Document Control Desk Washington, D. C. 20555 Gentlemen:

Subject:

WNP-2 OPERATING LICENSE NPF-21 MONTHLYOPERATING REPORT NOVEMBER 1995 Transmitted herewith is the Monthly Operating Report for the month of November 1995 as required by Technical Specification 6.9.1.6.

rel,

~

~

~

~J..

Parrish (Mail Drop 1023)

Vice President, Nuclear Operations JVP:DGE CC:

LJ Callan, NRC RIV NRC Sr. Resident Inspector (927N)

INPO ANI Library UtilityData Institute BPA (399) i3QQgq PDR ADOCK,05000397 R., -,.....,,, PDR,

N T:

1

OPERATING STATUS REPORT for WNP-2 Date:

December 1, 1995 2.

3.

4 5.

6.

7.

8.

9.

3486 1199 1153 1145 1099 none Docket:

50-397 Reporting Period:

NOVEMBER 1995 Outage + On-line Hours:

720.0 UtilityContact:

David G. Embree (509) 377-8448 Licensed Thermal Power (MW, ):

Nameplate Rating (Gross MW, ):

Design Electrical Rating (Net MW,):

Maximum Dependable Capacity (Gross MW,):

Maximum Dependable Capacity (Net MW, ):

Ifchanges occur above since last report, give reasons:

10.

11.

12.

13.

14.

15.

16.

17.

18.

19.

20.

21.

22.

23.

24.

25.

Report Period Hours Hours Reactor Critical Rx Reserve Shutdown Hours Hours Generator On-Line Unit Reserve Shutdown Hours Gross Thermal Energy (MWH)

Gross Electrical Energy (MWH)

Net Electrical Energy (MWH)

Unit Service Factor Unit AvailabilityFactor Unit Capacity Factor (MDC Net)

Unit Capacity Factor (DER Net)

Unit Forced Outage Rate Forced Outage Hours Power to which restricted, ifany (Net MW,):

about 98% (DER net =1130 MWe)

Reasons for restrictions, ifany:

administrative limitplaced on plant operations until special feedwater flow test results are validated, which may result in about a 2% decrease in power.

MONTH YEAR CUMULATIVE 720.0 8,016.0 96,104.2 720.0 6,191.2 68,891.8 0.0 404.5 744.9 720.0 5,938.9 66,506.5 0.0 577.1 958.8 2,371,119 19,328,022 198,590,862 800,650 6,593,510 66,947,010 773,751 6,329,586 64,154,720 100.0%

74. 1%

69.2%

100.0%

81.3%

70.2%

97.8%

72.4%

61. 1%

93.2%

69.7%

60.4%

0.0%

5.5%

11. 1%

0.0 348.6 8,319.7 26.

Shutdowns scheduled over the next 6 months (type, date, duration):

27.

Ifcurrently shutdown, estimated startup date:

Refueling, 4/13/96, 55 days NA Note:

Cumulative Unit Capacity Factors (MDC 8r, DER) are calculated with weighted averages.

I%

j C

r AVERAGE DAILY UNIT POWER LEVEL REPORT PERIOD:

NOVEMBER 1995 DOCKET NO.:

UNIT:

DATE:

COMPLETED BY:

TELEPHONE:

50-397 WNP-2 December 1, 1995 D. G. Embree (509) 377-8448 DAY AVERAGE DAILYPOWER LEVEL (Net MWe)

AVERAGE DAILYPOWER LEVEL DAY (Net MWe) 10 12 13 14 15 1150 1150 1067 787 811 993 1139 1123 1142 1079 1143 1141 1138 1137 1134 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 1137 1137 1132 1142 1144 1146 1146 1141 1130 1132 887 924 1094 838 978 INSTRUCTIONS On this form, list the average daily unit power level in MWe (net) for each day in the reporting month.

Compute to the nearest whole megawatt.

These figures willbe used to plot a graph for each reporting month.

Note that when maximum dependable capacity is used for the net electrical rating of the unit, there may be occasions when the daily average power level exceeds the 1009o line (or the restricted power level line). In such cases, the average daily unit power output sheet should be footnoted to explain the apparent anomaly.

UNIT SHUTDOWNS AND POWER REDUCTIONS REPORT PERIOD:

NOVEMBER 1995 DOCKET NO.:

50-397 UNIT NAME:

WNP-2 DATE:

December 1, 1995 COMPLETED BY:

D.G. Embree TELEPHONE:

(509) 377-8448 No.

Date Type Hours Reason Method LER Number System Component Cause and Corrective Action To Prevent Recurrence 95-09 11/03/95 S

79.2 NA CRDRVE Meintensnee performed on CRD system (rebuild scram pilot valves) and to conduct scram time testing.

95-10 11/26/95 S

49.0 H

NA ZZ ZZZZZZ Economic dispatch (load following) at the request of the BPA.

95-11 11/28/95 S

45.0 H

NA ZZ ZZZZZZ Economic dispatch (load following) at the request of the BPA.

SUMMARY

At the beginning of the month, the plant was operating at full power.

The plant reduced power during the month to perform maintenance activities and testing of the CRD system.

The plant also entered economic dispatch goad following) at the request of the BPA.

TYPE F - Forced S - Scheduled REASON A - Equipment Failure B - Maintenance or Test C - Refueling D - Regulatory Restriction E - Operator Training &