GO2-95-175, Forwards WNP-2 ISI Summary Rept for Tenth Refueling Outage, Including NIS-1 Owner Data Rept for ISI & NIS-2 Owner Repts for Repairs & Replacements
| ML17291B015 | |
| Person / Time | |
|---|---|
| Site: | Columbia |
| Issue date: | 09/12/1995 |
| From: | Parrish J WASHINGTON PUBLIC POWER SUPPLY SYSTEM |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| Shared Package | |
| ML17291B016 | List: |
| References | |
| GO2-95-175, NUDOCS 9509180378 | |
| Download: ML17291B015 (2) | |
Text
PRXORXTY 1 (ACCELERATED RZDS PROCESSING)
REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
ACCESSION NBR:9509180378 DOC.DATE: 95/09/12 NOTARIZED: NO DOCKET FACIL:50-397 WPPSS Nuclear Project, Unit 2, Washington Public Powe 05000397 p
AUTH.NAME AUTHOR AFFILIATION
, PARRISH,J.V.
Washington Public Power Supply System RECIP.NAME RECXPIENT AFFILIATION Document Control Branch (Document Control Desk) p P~
SUBJECT:
Forwards "WNP-2 ISI Summary Rept for Tenth Refueling Outage," including NIS-1 owner data rept for ISI
& NIS-2 owner repts for repairs
& replacements.
0 DISTRIBUTION CODE:
A047D COPIES RECEIVED:LTR J ENCL
(
SIZE:
i S +
TITLE: OR Submittal: Inservice/Testing/Relief from ASME Code G 04 NOTES RECIPIENT ID CODE/NAME PD4-2 LA CLIFFORD,J INTERNAL: AC LE NTE 01 OGC/HDS3 EXTERNAL: LITCO ANDERSON NRC PDR COPIES LTTR ENCL 1
1 1
1 6
0 1
1 1
1 1
0 1
1 1
1 RECIPIENT ID CODE/NAME PD4-2 PD AEOD/SPD/RAB NRR/DE/EMCB NUDOCS-ABSTRACT RES/DSIR/EIB NOAC COPIES LTTR ENCL 1
1 1
1 1
1 1
1 1
1 1
1 D
0 N
NOTE TO ALL "RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTE!
CONTACT THE DOCUMENT CONTROL
- DESK, ROOM OWFN 5D8 (415-2083)
TO ELIMINATE YOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED TOTAL NUMBER OF COPXES REQUIRED:
LTTR 19 ENCL 12
ai WASHINGTONPUBLIC POWER SUPPLY SYSTEM PO. Box 968
~ 3000 George Washington Way
~ Richland, Washington 99352-0968
~ (509) 372-5000 September 12, 1995 G02-95-175 Docket No. 50-397 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.C.
20555 Gentlemen:
Subject:
WNP-2, OPERATING LICENSE NPF-21 INSERVICE INSPECTION SU1VPCA,RY REPORT FOR TENTH REFUELING OUTAGE The Inservice Inspection Summary Report forWNP-2's tenth refuel outage is attached, including the NIS-1 Owner's Data Report for Inservice Inspection and NIS-2 Owner's Reports for Repairs and Replacements.
Two welds did not receive fullASME Code examination coverage.
Relief requests for these welds willbe submitted under a separate transmittal.
Should you have any questions or desire additional information regarding this matter, please call me or D. A. Swank at (509) 377-4563.
Sincerel
. V. Parrish (Mail Drop 1023)
Vice President, Nuclear Operations CJF/ml Attachments CC:
LJ Callan - NRC RIV KE Perkins, Jr. - NRC RIV, Walnut Creek Field Office NS Reynolds - Winston & Strawn JW Clifford - NRC DL Williams - BPA/399 NRC Sr. Resident Inspector - 927N