GO2-94-289, Submits Simulator Facility Certification, for Wpps WNP-2 Per 10CFR55.45
| ML17291A567 | |
| Person / Time | |
|---|---|
| Site: | Columbia |
| Issue date: | 12/29/1994 |
| From: | Parrish J WASHINGTON PUBLIC POWER SUPPLY SYSTEM |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| Shared Package | |
| ML17291A568 | List: |
| References | |
| GO2-94-289, NUDOCS 9501040180 | |
| Download: ML17291A567 (5) | |
Text
P RIQRITY (ACCELERATED RIDS PROCESSIX REGULATORY INFORMATXON DISTRIBUTION SYSTEM (RIDS)
- ~
ACCESSION NBF$ 9501040180 DOC. DATE: 94/12/29 NOTARIZED: NO DOCKET FACIL:50-397 WPPSS Nuclear Project, Unit, 2, Washington Public Powe 05000397 AUTH.NAME AUTHOR AFFILIATION PARRISH,J.V.
Washington Public Power Supply System RECIP.NAME RECIPIENT AFFILIATXON Document Control Branch (Document Control Desk)
P
SUBJECT:
Submits "Simulator Facility Certification," for WPPS WNP-2 per 10CFR55.45.
DISTRIBUTION CODE:
A005D COPIES RECEIVED:LTR ENCL J SIZE:
+
TITLE: Simulator Facility Certification GL-9 -08 NOTES:
0 I
0 RECIPXENT ID CODE/NAME CLIFFORD,J INTERNAL: PTER CENTER 0
EXTERNAL: NRC PDR COPXES LTTR ENCL 1
1 1
1 1
1 RECIPIENT ID CODE/NAME NRR/DRCH/HOLB COPIES LTTR ENCL 1
1 R
Y D
0, C'
N iNOTE TO ALL"RlDS" RECIPI EYTS:
PLEASE HELP US TO REDUCE KVKSTE!CONTACT;II IE DOCL'XfEYTCONTROL
'ESK, ROOM Pl -37 (EXT. 5&.00S3 ) TO ELIMIN~ATE 5'OL'R NAlfL FROM D!s'rR!nu'I'Io~ Lls rs FoR DoCnfEi"I's voU Doi "I'El'.D!
TOTAL NUMBER OF COPIES REQUIRED:
LTTR 4
ENCL 4
f
WASHINGTON PUBLIC POWER SUPPLY SYSTEM RO. Box 968
~ 3000 George Washington Way
~ Richland, Washington 99352-0968
~ (509) 372-5000 Docket No. 50-397 December 29, 1994 G02-94-289 U.S. Nuclear Regulatory Commission Attn; Document Control Desk Washington, D.C.
20555 Gentlemen:
Subject:
WNP-2, OPERATING LICENSE NPF-21 OPERATOR TRAININGSIMULATORINITIALCERTIFICATION 10 CFR 55.45 The Washington Public Power Supply System, in accordance with the requirements of 10 CFR 55.45, submits the initialcertification report for its new Nuclear Plant No. 2 (WNP-2) operator training simulator.
NRC Form 474 "Simulator Facility Certification" is enclosed to certify that the WNP-2 simulator has been evaluated in accordance with the Nuclear Regulatory Commission's requirements for a plant-referenced simulator.
This certification has been prepared in accordance with the subject Federal Regulation, the Nuclear Regulatory Commission's Regulatory Guide 1.149 and its reference ANSI/ANS-3.5 (1985) National Standard for Nuclear Power Plant Simulators for use in Operator Training. Our submittal includes the completed NRC Form 474 and supporting documentation.
Should you have any questions or desire additional information regarding this matter, please call me or J.W. Baker at (509) 377-8322.
Sincerely,
. V. Parrish (Mail Drop 1023)
Assistant Managing Director, Operations RWL/ml Attachment cc:
LJ Callan - NRC RIV KE Perkins, Jr. - NRC RIV, Walnut Creek Field Office NS Reynolds - Winston & Strawn JW Clifford - NRC DL Williams - BPA/399 NRC Sr. Resident Inspector - 927N 9501040180 941229 PDR ADOCK 05000397 P
PDR I
q)~y 4 1
a't ~
NAC eanu ala U.S. NUCLEAR R EGO LATOltY COMMI55ION f '""'III""c SIMULATlQN FACILITY CERTIFICATION P
>TRUCTIONS. This for~is'to be tiled for initial certification, recertification fifreouired), and far any change to a simulatian tacility performance testing p4n made after initial submittal at such a plan. Provide the fallawing information, and check the appropriate box to indicate reasan for submittal.
FACILITY Washington Plant Nuclear'2 LICENSEE Washington Public Power Supply System
)
OOCccET NUMBER 50 397 CATE 12-19-94 seve n co cause mes, 1. she eoove nemas ceceer sceneee n uano e enneeoen cectey conusono eauy oc ~ osens enrenceo eneeesa uus metes she raeiranmee or 10 cya ~ 55.oL 2. ove ernuuoon ceovsy mecca see gunence consaneo as ANSI/ANS 2.5. Isos. ee enooreeo oy Nitc etgvsesay auoe I.sole eno 2. oocsenensesces
~ eruucee cor Nnc ctnen es cconunrce unn 10 cFR 'cLeaiel. It snae ae eny
~scots<one so me can%tenon or ean 2 eoovt. cnece nae P eno oeecrtse lucy as eoouones oegee te neceeeay.
NAMEforochrridtnrifkurionfANO LOCATIONOF SIMULATIONFACILITY Washington Public Power Supply System, Unit 2, Plant Support Facility, Richland, WA SIMULATIONFACILITYPEAFOAMANCETEST ABSTRACTS ATTACHED.fFor Performs'e mrs conduccedin mt Period endinF erich Chtdtce ol this corrilicscionl OESCRIPTION OF PEAFOAMANCETESTING COMPLETEO fArcecheddicionef pegt(sl esnectcmry, tndidenrify chtirern description bang concinutdf Please refer to Appendix "D" of the attached"Simulator Facility Certification" report for a complete list of the completed performance tests.
SIMULATIQNFACILITYPE AFOAMANCE TESTING SCHEOULE ATTACHEO. fFor tht conduct ol eoproecmerdy 25% olperlcrmence ctsn per ymr lorene lour yeer ptnod X commmcino w rh cht dect ol this terri%'cecion l O ESCA IPTION OF PE A FOA MAN CF TESTING TO BE CONOUCTcO fAcreen eddh'cioner Pegtrrf es necessary, end cdencily Chtirtm dtscriolcon Caing conrfnutdf Please refer to Attachment "E" of the attached "Simulator Facility Certification" report for the quadrennial Simulator Certification test schedule.
pEAFQRMANcE TEsTING pLAN cHANGE. fper eny modilicsrion roe perfonnenct ctsring plan sucmirced on e pron'our cn i!icscionl QEscRipTIQN oF pERFQRMANcE TEsTING pLAN cHANGE fAccech eddirionel pegtlrl esnecessery. endidtnrify rneicern descriprion ren'ngcordinutdl R ECcR
~ IF ICA > ION IDrscrsca cceva..nu terrene recon, ercece resents or onvaestd perrormenct ramnr sn eaorsarea ~ CO CF o j rc eaconSccr I
l oeeerss es necessav end narrnrv mt irem~ Onrvr Connnued I "v Islle statement 01 omisuon sn this oocumenc, sncluding ettecnmencs. nuy bt suoiect to owl eno cnm~nsl senccions.
I ceruty under peneity ol pertucy tost tne mcocmeuon m tms went snd euscnmenis snd correct.
ATUR U
RIZ REPA ENTATIVE TITLE CATE Assistan't Managin'g-'Direotor",'-Operatig@gic In accor s
e with 10 CF R "55.5. Communications, this form shall be submitted to the NRC as follows:
BY MAILADDRESSED TO: Director, Otfice of Nuc4ar,Reactor Regu4tion BY DELIVERYIN PERSON
'.S. Nuclear Regulatory Comnsission To THE NRC OFFICE AT:
7920 Norfolk Avenue Washington, DC 20555 Bethesda, MD