GO2-94-158, Forwards Rev 0 to Core Operating Limits Rept,Cycle 10, for WNP-2
| ML17291A212 | |
| Person / Time | |
|---|---|
| Site: | Columbia |
| Issue date: | 07/11/1994 |
| From: | Parrish J WASHINGTON PUBLIC POWER SUPPLY SYSTEM |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| Shared Package | |
| ML17291A213 | List: |
| References | |
| GO2-94-158, NUDOCS 9407190054 | |
| Download: ML17291A212 (4) | |
Text
(e '1>> I4 '-
ACCELERATED RIDS PROCESSING)
REGULATORY INFORMATXON DISTRIBUTION SYSTEM (RIDS)
ACCESSXON NBR:9407190054 DOC.DATE: 94/07/11 NOTARIZED: NO DOCKET FACIL:50-397 WPPSS Nuclear Project, Unit 2, Washington Public Powe 05000397 AUTH.NAME AUTHOR AFFILIATION PARRISH,J.V.
Washington Public Power Supply System P
RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk) g>P
SUBJECT:
Forwards rev 0 to "Core Operating Limits Rept.,Cycle 10," for WNP-2.
I DISTRIBUTION CODE:
AOOID COPIES RECEIVED:LTR I
ENCL Q SIZE:
TITLE: OR Submittal:
General Distribution NOTES:
RECIPIENT ID CODE/NAME PDIV-3 LA CLIFFORD,J INTERNAL: ACRS NRR/DORS/ONDD NRR/DRPW NRR/DSSA/SRXB
~
0 ~
01 EXTERNAL: NRC PDR COPIES LTTR ENCL 1
1 2
2 6
6 1
1 1
1 1
1 1
0 1
1 1
1 RECIPIENT ID CODE/NAME PDIV-3 PD NRR/DE/EELB NRR/DRCH/HICB NRR/DSSA/SPLB NUDOCS-ABSTRACT OGC/HDS3 NSXC COPIES LTTR ENCL 1
1 1
1 1
1 1
1 1
1 1
0 1
1 D
C U
N NOTE TO ALL"RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTE! CONTACTTIIE DOCUMENTCONTROL DESK, ROOM PI-37 (EXT. S04-2083 ) TO ELIMINATEYOUR NAMEI'ROM DISTRIBUTIONLISTS FOR DOCUMENTS YOU DON'T NEEDl TOTAL NUMBER OF COPIES REQUIRED:
LTTR 22 ENCL 20
(I h
e '+
V
WASHINGTONPUBLIC POWER SUPPLY SYSTEM P.O. Box'968 ~ 3000 Geotge Washington Way ~ Richland, Washington 99352C968
~ (509) 372-5000 July 11, 1994 G02-94-158 Docket No. 50-397 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.C.
20555 Gentlemen:
Subject:
WNP-2, OPERATING LICENSE NPF-21 CYCLE 10 CORE OPERATING LIMITSREPORT (COLR)
Reference:
Letter GO2-94-108 dated May 10, 1993, JV Parrish (SS) to NRC, "Request for Amendment to Stability and Power/Flow Sections of the Technical Specifications" The Supply System is submitting the COLR 94-10, Revision 0, in accordance with the requirements of WNP-2 Technical Specification 6.9.3.4.
The operating limits in the COLR resulting from the Cycle 10 reload and licensing analyses have been evaluated against the criteria of 10CFR50.59.
No unreviewed safety questions were identified and no changes to the Technical Specifications that would need approval of the NRC prior to implementation are necessary.
The COLR has been reviewed and approved by the WNP-2 Plant Operating Committee.
The reference requested a change to the power to flow maps contained within the Technical Specifications.
However, prior approval of this change is not required in order to implement the limits specified in COLR 94-10, Revision 0.
Ifyou should have any questions, please contact me or P.R. Bemis at (509) 377-4027 as soon as possible.
Sincerely
. V. Parrish (Mail Drop 1023)
Assistant Managing Director, Operations MGE/kd Attachments CC:
NRC Sr. Resident Inspector - 901A DL Williams - BPA/399 NS Reynolds - Winston & Strawn JW Clifford - NRC LJ Callan - NRC RIV KE Perkins, Jr. - NRC RIV, Walnut Creek Attic Office 9407290054 9407<>
PDR ADOCK 05000397 P
I, gW