GO2-94-032, Monthly Operating Rept for Jan 1994 for WNP-2
| ML17290A954 | |
| Person / Time | |
|---|---|
| Site: | Columbia |
| Issue date: | 01/31/1994 |
| From: | Embree D, Galen Smith WASHINGTON PUBLIC POWER SUPPLY SYSTEM |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| GO2-94-032, GO2-94-32, NUDOCS 9402160010 | |
| Download: ML17290A954 (9) | |
Text
ACCELERATED DI UTION DEMONST TION SYSTEM REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
ACCESSION NBR:9402160010 DOC.DATE: 94/01/31 NOTARIZED: NO DOCKET g
FACIL:50-397 WPPSS Nuclear Project, Unit 2, Washington Public Powe 05000397 AUTH.NAME AUTHOR AFFILIATION EMBREE,D.G.
Washington Public Power Supply System SMITH,G.O.
Washington Public Power Supply System RECIP.NAME RECIPIENT AFFILIATXON R
/
DISTRIBUTION,CODE:
IE24D COPIES RECEIVED:LTR ENCL SIZE:
TITLE: Monthly Operating Report (per Tech Specs NOTES:
RECIPIENT ID CODE/NAME PDV PD INTERNAL: ACRS AEOD/DSP/TPAB NRR/DRXL/RPEB RGN5 EXTERNAL: EG&G BRYCE,J.H NSIC COPXES LTTR ENCL 1
1 10 10 1
1 1
1 1
1 1
1 1
1 RECIPIENT ID CODE/NAME CLIFFORD,Z AEOD/DOA NRR DORS OEAB G FI 01 NRC PDR COPIES LTTR ENCL 1
1 1
1 1
1 1
1 1
1 NOTE TO ALL"RIDS" RECIPIENTS:
D D
PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOM P 1-37 (EXT. 20079) TO ELIMINATEYOUR NAMEFROM DISTRIBUTION LISIS FOR DOCUMENTS YOU DON'T NEEDI TOTAL NUMBER OF COPIES REQUIRED:
LTTR 21 ENCL 21
4'
WASHINGTONPUBLIC POWER SUPPLY SYSTEM P.O. Box 9E8 ~ 3000 George Wasbtrtgtort Way ~ Rtcblartd, 1Wasbtrtgtort 99352-0968
~ (509) 372-5000 February 10, 1994 G02-94-32 Docket No. 50-397 U. S. Nuclear Regulatory Commission Document Control Desk Washington, D. C. 20555
Dear Sirs:
Subject:
NUCLEAR PLANT NO. 2 MONTHLYOPERATING REPORT JANUARY 1994 Transmitted herewith is the Monthly Operating Report for the month of January, 1994 as required by'our Technical Specifications 6.9.1.6.
Sincerely, 4~<~d4.
G. O. Smith Operations Division Manager (MD 9270)
GOS:DGE CC:
Mr. W.H. Lovelace, NRC, Washington, DC Mr. K.E. Perkins, NRC Region V Mr. R.C. Barr, NRC Resident Inspector (901A)
Mr. J.T. Wheelock, INPO Mr. C. Bergesen, UtilityData Institute Mr.. J.T. Irish, BPA (399)...,,,
~ 0 II sd-II
OPERATING STATUS REPORT for WNP-2 Date:
February 1, 1994 2.
3.
4.
5.
6.
7.
8.
9.
3323 1200.9 1120 1132 1086 n/a Docket:
50-397 Reporting Period:
JANUARY 1994 Outage + On-Line Hours:
744.0 UtilityContact:
David G. Embree (509) 377-8448 Licensed Thermal Power (MW, ):
Nameplate Rating (Gross MW, ):
Design Electrical Rating (Net MW,);
Maximum Dependable Capacity (Gross MW,):
Maximum Dependable Capacity (Net MW, ):
Ifchanges occur above since last report, give reasons:
10.
11.
Power to which restricted, ifany (Net MW,):
Reasons for restrictions, ifany:
n/a n/a 12.
13.
14.
15.
16, 17.
18.
19.
20.
21.
22.
23.
24.
25.
Report Period Hours Hours Reactor Critical Rx Reserve Shutdown Hours Hours Generator On-Line Unit Reserve Shutdown Hours Gross Thermal Energy (MWH)
Gross Electrical Energy (MWH)
Net Electrical Energy (MWH)
Unit Service Factor Unit AvailabilityFactor
'Unit Capacity Factor (MDC Net)
Unit Capacity Factor (DER Net)
Unit Forced Outage Rate Forced Outage Hours MONTH 744.0 744.0 0.0 744.0 0.0 2,405,620 837,680 806,082 100.0%
100.0%
99.8%
96.7%
0.0%
0.0 YEAR 744.0 744.0 0.0 744.0 0.0 2,405,620 837,680 806,082 100.0%
100.0%
99.8%
96.7%
0.0%
0.0 CUMULATIVE 80,072.2 56,854.2 340.4 54,811.0 381.7 161,166,926 54,149,890 51,891,467 68.5%
68.9%
59.3%
58.8%
12.6%
7,885.3 26.
27.
Shutdowns scheduled over the next 6 months (type, date, duration):
Refueling Outage, about April30, 1994, 60 Days.
Ifcurrently shutdown estimated startup date:
n/a Note:
Cumualtive Unit Capacity Factors (MDC &DER) are calculated with weighted averages.
4 II I
t t
AVERAGE DAILY UNIT POWER LEVEL REPORT PERIOD:
JANUARY 1994 DOCKET NO.:
UNIT:
DATE:
COMPLETED BY:
TELEPHONE:
50-397 WNP-2 February 1, 1994 D. G. Embree (509) 3774448 DAY AVERAGE DAILYPOWER LEVEL (Net MWe)
AVERAGE DAILYPOWER LEVEL DAY (Net MWe) 10 12 13 14 15 1092 1117 1114 1107 1117 1109 1117 1117 1113 1082 1107 1112 1012 528 16 17 18 19 20 21 22 23 25 26 27 28 29 30 31 971 1114 1116 1109 1109 1092 1116 1116 1109 1110 1114 1113 1088 1117 1118 1121 INSTRUCTIONS On this form, list the average daily unit power level in MWe (net) for each day in the reporting month.
Compute to the nearest whole megawatt.
These figures willbe used to plot a graph for each reporting month.
Note that when maximum dependable capacity is used for the net electrical rating of the unit, there may be occasions when the daily average power level exceeds the 1009o line (or the restricted power level line). In such cases, the average daily unit power output sheet should be footnoted to explain the apparent anomaly.
r
'h c
H
UNIT SHUTDOWNS AND POWER REDUCTIONS REPORT PERIOD:
JANUARY 1994 DOCKET NO.:
50-397 UNIT NAME:
WNP-2 DATE:
February 1, 1994 COMPLETED BY:
D.G. Embree TELEPHONE:
(509) 3774448 No.
Date Type Hours Reason Method LER Number System Component Cause and Corrective Action To Prevent Recurrence 94-01 1/14/94 S
49.8 B
HF HTEXECH The plant reduced power to conduct maintenance on numerous plant components that needed attention.
An attempt was made to plug a main condenser tube leak. Steam leaks were repaired and a condensate system pump was repaired.
SUlVPdARY:
WNP-2 operated near full power during the month with one significant power reductions ()20%) which was conducted to complete needed maintenance.
TYPE F - Forced S - Scheduled REASON A - Equipment Failure B - Maintenance or Test C - Refueling D - Regulatory Restriction E - Operator Training &
License Examination F - Administration G - Operational Error H - Other METHOD 1 - Manual 2 - Manual Scram 3 - Auto Scram 4 - Continued 5 - Reduced Load 9 - Other SYSTEM & COMPONENT NUREG4161 Exhibits F &H