Text

t ACCT r

LERATED OCUMENT DISTRIBUTION SYSTEM REGULATO INFORMATION DISTRIBUTIO ON STEM (RIDS)

ACCESSION NBR:9310150106 DOC.DATE:

DOCKET AUTH.NAME uc ear Prospect, Unit 2, Washington Public Powe 05000397 EMBRACE,D.G.

Washin ton P

R PARRISH,J.V.

g on Public Power Supply System Washington Public Power Su 1

S s I

SUBJECT:

Monthl nthly operate.ng rept for Sept 1993 for WNP-2.

931007 tr.

DISTRIBUTION CODE:

IE24D COPIES RECEIVED:LTR g..t:hi ap....,.g ing eport (per Tech Specs)

NOTES:

RECIPIENT ID CODE/NAME PDV LA CLIFFORD,J INTERNAL: ACRS AEOD/DSP/TPAB NRR/DRIL/RPEB RGN5 COPIES LTTR ENCL 3

3 1

1 10 10 1

1 1

1 1

1 RECIPIENT ID CODE/NAME PDV PD AEOD/DOA RRJJ30RS/OEAB REG FILE 01 COPIES LTTR ENCL 1

1 1

1 1

1 1

1 D

D EXTERNAL EGSG BRYCE g J

~ H NSIC 1

1 1

1 NRC PDR 1

1 D

NOTE TO ALL"RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE! CON

.ONTACT THE DOCUMEN I COYTROL DESk, 4.2065) 'I'O ELIMINATEYOUR YAMEPROM DIS'I'I~II3UIION R DOCUMENTS YOU DON'T NEED!

TOTAL NUMBER OF COPIES REQUIRED:

LTTR 24 ENCL 24

WASHINGTON PUBLIC POWER SUPPLY SYSTEM P.O. Box 968

~ 3000 George Washington Way

~ Richland, Washington 99352 October 7, 1993 G02-93-246 Docket No. 50-397 U. S. Nuclear Regulatory Commission Document Control Desk Washington, D. C. 20555

Dear Sirs:

Subject:

NUCLEAR PLANTNO. 2 MONTHLYOPERATING REPORT SEPTEMBER, 1993 Transmitted herewith is the Monthly Operating Report for the month of September, 1993 as required by our Technical Specifications 6.9.1.6.

Sincerely, J. V. Parrish Assistant Managing Director, Operations (MD 1023)

JVP:DGE CC:

Mr. W. H. Lovelace, NRC, Washington, DC Mr. J. B. Martin, NRC Region V Mr. R. C. Barr, NRC Resident Inspector (901A)

Mr. J. T. Wheelock, INPO Mr. F. Yost, UtilityData Institute r

nnnn 9310150106 930930 PDR ADQCK 05000397 R

PDR

1

C AVERAGE DAILY UNIY POWER LEVEL REPORT PERIOD:

SEPTEMBER 1993 DOCKET NO.:

50-397 UNIT:

WNP-2 DATE:

October 1, 1993 COMPLETED BY:

D. G. Embree TELEPHONE:

(509) 377-8448 DAY AVERAGEDAILYPOWER LEVEL (Net MWe)

AVERAGEDAILYPOWER LEVEL DAY (Net MWe),

10 12 13 14 15 1093 1093 1085 1089 1090 1090 1091 1089 1090 1058 1067 1100 1103 1103 1097 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 1098 1100 1102 1104 1108 1108 1106 1105 1100 1104 1105 1105 1101 1098 1095 INSTRUCTIONS On this form, list the average daily unit power level in MWe (net) for each day in the reporting month.

Compute to the nearest whole megawatt.

These figures willbe used to plot a graph for each reporting month.

Note that when maximum dependable capacity is used for the net electrical rating of the unit, there may be occasions when the daily average power level exceeds the 100% line (or the restricted power level line). In such cases, the average daily unit power output sheet should be footnoted to explain the apparent anomaly.

OPERATING STATUS REPORT for WNP-2 Date:

October 1, 1993 2.

3.

4.

5.

6.

7.

8.

9.

10.

11.

3323 1200.9 1120 1165 1112

" n/a n/a n/a Docket:

50-397 Reporting Period:

SEPTEMBER 1993 Outage + On-Line Hours:

720.0 UtilityContact:

David G. Embree (509) 377-8448 Licensed Thermal Power (MW, ):

Nameplate Rating (Gross MW,):

Design Electrical Rating (Net MW,):

Maximum Dependable Capacity (Gross MW,):

Maximum Dependable Capacity (Net MW, ):

Ifchanges occur above since last report, give reasons:

Power to which restricted, ifany (Net MW,):

Reasons for restrictions, ifany:

12.

13.

14.

15.

16.

17.

18.

19.

20.

21.

22.

23.

24.

25.

Report Period Hours Hours Reactor Critical Rx Reserve Shutdown Hours Hours Generator On-Line Unit Reserve Shutdown Hours Gross Thermal Energy (MWH)

Gross Electrical Energy (MWH)

Net Electrical Energy (MWH)

Unit Service Factor Unit AvailabilityFactor Unit Capacity Factor (MDC Net)

Unit Capacity Factor (DER Net)

Unit Forced Outage Rate Forced Outage Hours MONTH 720.0 720.0 0.0 720.0 0.0 2,386,632 819,990 788,993 100.0%

100.0%

98.5%

97.8%

0.0%

0.0 YEAR 6,551,0 4,752.5 0.0 4,550.3 0.0 14,286,681 4,918,430 4,683,662 69.5%

69,5%

64.3%

63.8%

11.9%

612.0 CUMULATIVE 77,119.2 53,901.2 340.4 51,858.0 381.7 151,451,331 50,767,520 48,634,081 67.2%

67.7%

57.6%

57.3%

13.2%

7,885.3 26.'hutdowns scheduled over the next 6 months (type, date, duration):

None.

27.

Ifcurrently shutdown estimated startup date:

n/a Note:

Cumualtive Unit Capacity Factors (MDC&DER) are calculated with weighted averages.

UNIT SHUTDOWNS AND POWER REDUCTIONS REPORT PERIOD:

SEPTEMBER 1993 DOCKET NO.:

50-397 UNIT NAME:

WNP-2 DATE:

October 1, 1993 COMPLETED BY:

D.G. Embree TELEPHONE:

(509) 3774448 No.

Date Type Hours Reason Method LER Number System Component Cause and Corrective Action To Prevent Recurrence NONE

SUMMARY

WNP-2 operated near fullpower during the month of September with no outages or significant power reductions

()20%).

TYPE F - Forced S - Scheduled REASON A - Equipment Failure B - Maintenance or Test C - Refueling D - Regulatory Restriction E - Operator Training &

License Examination F - Administration G - Operational Error H - Other METHOD 1 - Manual 2 - Manual Scram 3 - Auto Scram 4 - Continued 5 - Reduced Load 9 - Other SYSTEM & COMPONENT NUREG%161 Exhibits F &H