GO2-93-158, Monthly Operating Rept for May 1993 for WNP-2
| ML17290A447 | |
| Person / Time | |
|---|---|
| Site: | Columbia |
| Issue date: | 05/31/1993 |
| From: | John Baker, Embree D WASHINGTON PUBLIC POWER SUPPLY SYSTEM |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| GO2-93-158, NUDOCS 9306210317 | |
| Download: ML17290A447 (8) | |
Text
A.CCELERA 9 DOCUMENT DIST UTION SYSTEM 4~
REGULA Y INFORMATION -DISTRIBUTI SYSTEM (RIDS)
I FACIL:.50-i397 WPPSS Nuclear Project, Unit 2, Washington Public Powe AUTH.NAME AUTHOR AFFILIATION EMBREE,D.G.
Washington Public Power Supply System BAKERgJ.W.
Washington Public Power Supply System RECIP.NAME RECIPIENT AFFILIATION DOCKET 05000397
SUBJECT:
perating rept for May 1993 for WNP-2.
tr.
DISTRIBUTION CODE:
IE24D COPIES RECEIVED:LTR ENCL SIZE:
TITLE: Monthly Operating Report (per Tech Specs)
NOTES:
RECIPIENT ID CODE/NAME PDV LA CLIFFORD,J INTERNAL: ACRS AEOD/DSP/TPAB NRR/DRPW/OEAB RGN5 EXTERNAL: EGSG BRYCE,J.H NSIC COPIES LTTR ENCL 3
3 1
1 10 10 1
1 1
1 1
1 1
1 1
1 RECIPIENT ID CODE/NAME PDV PD AEOD/DOA BR DRIL/RPEB REG FIL 01 NRC PDR COPIES LTTR ENCL 1
1 1
1 1
1 1
1 1
1 NOTE TO.ALL"RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTEI CONTACT THE DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT. 504-2065) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LISIS FOR DOCUMENTS YOU DON'T NEEDI TOTAL NUMBER OF COPIES REQUIRED:
LTTR 24 ENCL 24
L 0
ai WASHINGTON PUBLIC POWER SUPPLY SYSTEM P.o. Box 968
~ 3000 George Washington Way
~ Richland, Washington 99352 Docket No. 50-397 G02-93-158 U. S. Nuclear Regulatory Commission Document Control Desk Washington, D. C. 20555
Dear Sir:
Subject:
NUCLEAR PLANTNO. 2 MONTHLYOPERATING REPORT MAY1993 Transmitted herewith is the Monthly Operating Report for the month of February, 1993 as required by our Technical Specifications 6.9.1.6.
Very truly yours, J.
Baker
-2 Plant Manager (MD 927M)
DE/ja CC:
Mr. W. H. Lovelace, NRC, Washington, DC Mr. J. B. Martin, NRC Region V Mr. R. C. Barr, NRC Resident Inspector (901A)
Mr. J. T. Wheelock, INPO Mr. F. Yost, UtilityData Institute 930h210317 930531 PDR,'DQCK 05000397 R
/
'P
~
4 t
(
II X3:00:~ ~
E E
OPERATING DATAREPOR WNP-2 DATE:
June 1, 1993 1.
DOCKET: 50-397 2.
REPORTING PERIOD:
May-93 OUTAGE + ON-LINE HOURS:
744 3.
UTILITYCONTACT:
David G. Embree (509) 377-8448 4.
5.
6.
7.
8.
LICENSED THERMALPOWER (MWt):
NAMEPLATE RATING (GROSS MWe):
DESIGN ELECTRICAL RATING (NET MWe):
MARIMIIMDEPEEDAELE CAPACIYY(CRESS MW E MAXIMUMDEPENDABLE CAPACITY (NET MWe):
3323 1200.9 1120 1165 1112 9.
IF CHANGES OCCUR ABOVE SINCE LAST REPORT, GIVE REASONS:
N ne 10.
POWER TO WHICH RESTRICTED, IF ANY (NET MWe):
11.
REASONS FOR RESTRICTIONS, IF ANY:
None 12.
REPORT PERIOD HOURS 13.
HOURS REACTOR CRITICAL 14.
RX RESERVE SHUTDOWN HOURS 15.
HOURS GENERATOR ON LINE 16.
UNIT RESERVE SHUTDOWN HOURS 17.
GROSS THERMALENERGY (MWH) 18.
GROSS ELECTRICAL ENERGY (MWH) 19.
NET ELECTRICAL ENERGY (MWH) 20.
UNIT SERVICE FACTOR 21.
UNIT AVAILABILITYFACTOR 22.
UNIT CAPACITY FACTOR (MDC NET) 23.
UNIT CAPACITYFACTOR (DER NET) 24.
UNIT FORCED OUTAGE RATE 25.
FORCED OUTAGE HOURS MONTH 744.0 15.8 0.0 1.2 0.0 8,789 150
- 6,999 0.2%
0.2%
0.0%
0.0%
0.0%
0.0 YEAR 3,623.0 2,447.0 0.0 2,342.5 0.0 7,364,734 2,556,790 2,423,410 64.7%
64.7%
60.2%
59.7%
14.4%
392.5 CUMULATIVE 74,191.2 51,595.7 340.4 49,650.2 381.7 144,529,384 48,405,880 46,373;829 66.9%
67.4%
57.1%
56.8%
13.4%
7,665.8 26.
SHUTDOWNS SCHEDULED OVER THE NEXT 6 MONTHS (TYPE,'DATE, DURATION:
Refuelin uta e R8 Scheduled from M 1
1 hrou h
une 1
1 27.
IF CURRENTLY SHUTDOWN ESTIMATED STARTUP DATE:
une1 1
REPORT PERIOD:
MAY1993 DOCKET NO.:
UNIT:
DATE:
COMPLETED BY:
TELEPHONE:
50-397 WVNP-2 JUNE 1, 1993
. DGEMBREE (509) 377-8448 DAY 2.
3.
4 5.
6.
7.
8.
9.
10.
12.
13.
14.
15.
AVERAGE DAILYPOWER LEVEL (Net MWe)
DAY 16.
17.
18.
19.
20.
21.
22.
23.
24.
25.
26.
27.
28.
29.
30.
31.
AVERAGE DAILYPOWER LEVEL (Net MWe)
INSTRUCTIONS On this form, list the average daily unit power level in MWe (net) for each day in the reporting month.
Compute to the nearest whole megawatt.
These figures willbe used to plot a graph for each reporting month. Note that when maximum dependable capacity is used for the net electrical rating of the unit, there may be occasions when the daily average power level exceeds the 100% line (or the restricted power level line). In such cases, the average daily unit power output sheet should be footnoted to explain the apparent anomaly.
1 Plt
UNIT SHUTDOWNS AND POWER REDUCTIONS REPORT PERIOD: MAY1993 DOCKET NO.:
50-397 UNITNAME:
WNP-2 DATE:
JUNE 1, 1993 COMPLETED BY: DG EMBREE TELEPHONE:
(509) 3774448 No.
Date Type Hours Reason Method LER Number System Component Cause and Corrective Action To Prevent Recurrence 93-06 5/01/93 S
728.2 C
1 n/a RC FUELXX Plant was shutdown as scheduled for the annual refueling outage R-8.
SUMMARY
WNP-2 operated on May 1, 1993 just a few hours before it was shutdown for the annual refueling outage R-8.
TYPE F - Forced S - Scheduled REASON A - Equipment Failure B - Maintenance or Test C - Refueling D - Regulatory Restriction E - Operator Training &
License Examination F - Administration G - Operational Error H - Other METHOD 1 - Manual 2 - Manual Scram 3 - Auto Scram 4 - Continued 5 - Reduced Load 9 - Other SYSTEM & COMPONENT NUREG4161 Exhibits F &H
~
~