GO2-93-010, Monthly Operating Rept for Dec 1992 for Wpps 2

From kanterella
Jump to navigation Jump to search
Monthly Operating Rept for Dec 1992 for Wpps 2
ML17289B110
Person / Time
Site: Columbia 
Issue date: 12/31/1992
From: John Baker, Hutchison L
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
GO2-93-010, GO2-93-10, NUDOCS 9301210276
Download: ML17289B110 (6)


Text

A<CEI.ERAVNDDOCVMENT DIST VTION SYSTEM REGUL~Y INFORMATION DISTRIBUTI..

SYSTEM (RIDS)

>>>>>>7 DOCKET FACIE:50-397 WPPSS Nuclear Project, Unit 2, Washington Public Powe 05000397

~

~

AUTH.NAME AUTHOR AFFILIATION HUTCHISON,L.

Washington Public Power Supply System BAKER,J.W.

Washington Public Power Supply System RECIP.NAME RECIPIENT AFFILIATION

SUBJECT:

M crating rept for Dec 1992 for Nuclear Plant 2.

/930110 r.

DISTRIBUTION CODE:

IE24D COPIES RECEIVED:LTR ENCL SIZE:

TITLE: Monthly Operating Report (per Tech Specs)

NOTES:

D RECIPIENT COPIES ID CODE/NAME LTTR ENCL PD5 LA 3

3 CLIFFORDiJ 1

1 RECIPIENT ID CODE/NAME PD5 PD COPIES LTTR ENCL 1

1 D

INTERNAL: ACRS AEOD/DSP/TPAB NRR/DOEA/OEAB RGN5 EXTERNAL: EGSG BRYCEiJ.H NSIC 10 10 1

1 1

1 1

1 1

1 1

1 AEOD/DOA NRRJ/DLPQ/LPEB10 R

01 NRC PDR 1

1 1

1 1

1 1

1 D

e~ P7X~~'~>~<

D A

D NOTE TO ALL"RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTEI CONTACI'HEDOCUMENT CONTROL DESK, ROOM Pl-37 (EXT. 504-2065) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEEDI D

TOTAL NUMBER OF COPIES REQUIRED:

LTTR 24 ENCL 24

'1 ~

r

) 1

~

C l

ai WASHINGTON PUBLIC POWER SUPPLY SYSTEM P.O. Box 968

~ 3000 George Washington Way

~ Richland, Washington 99352 Docket No. 50-397 January 10, 1993 G02 010 U. S. Nuclear Regulatory Commission Document Control Desk Washington, D. C. 20555

Dear Sir:

Subject:

NUCLEAR PLANT NO. 2 MONTHLYOPERATING REPORT DECEMBER 1992 Transmitted herewith is the Monthly Operating Report for the month of December 1992 as required by our Technical Specifications 6.9.1.6.

Very truly yours,

. Baker

-2 Plant Manager (MD 927M)

LBH/kam CC:

Mr. W. H. Lovelace, NRC, Washington, DC Mr. J. B. Martin, NRC Region V Ms. Dottie Sherman, ANI, Farmington, CT Mr. R. C. Barr, NRC Resident Inspector (901A)

Mr. J. T. Wheelock, INPO Mr. F. Yost, UtilityData Institute (qP t g)~ l<~

S301210276 921231 PDR ADOCK 05000397 PDR

~

OPERATING DATAREPORT WNP-2 DATE:

January 1, 1993 DOCKET: 50-397 2.

REPORTING PERIO:

Dec-92 OUTAGE + ON-LINEHOURS:

744 3.

4.

5.

6.

7.

8.

9.

UTILITYCONTACT:

Leonard Hutchison (509) 377-2486 LICENSED THERMALPOWER (MWt):

NAMEPLATERATING (GROSS MWe):

DESIGN ELECTRICALRATING (NET MWe):

MAXIMUMDEPENDABLE CAPACITY (GROSS MWe):

MAXIMUMDEPENDABLE CAPACITY (NET MWe):

IF CHANGES OCCUR ABOVE SINCE LAST REPORT, GIVE REASONS:

None.

.3323 1200.9 1100 1129 1085 10.

POWER TO WHICH RESTRICTED, IF ANY (NET MWe):

REASONS FOR RESTRICTIONS, IF ANY:

None 12.

13.

14.

15.

16.

17.

18.

19.

20.

21.

22.

23.

24.

25.

REPORT PERIOD HOURS HOURS REACTOR CRITICAL RX RESERVE SHUTDOWN HOURS HOURS GENERATOR ON LINE UNIT RESERVE SHUTDOWN HOURS GROSS THERMALENERGY (MWH)

GROSS ELECTRICALENERGY (MWH)

NET ELECTRICALENERGY (MWH)

UNIT SERVICE FACTOR UNIT AVAILABILITYFACTOR UNIT CAPACITYFACTOR (MDC NET)

UNIT CAPACITYFACTOR (DER NET)

UNIT FORCED OUTAGE RATE FORCED OUTAGE HOURS MONTH 744.0 744.0 0.0 744.0 0.0 2,458,719 865,080 829,402 100.0%

100.0%

102.7%

101.3%

0.0%

0.0 YEAR 8,784.0 5,758.0 0.0 5,507.9 0.0 17,548,828 5,993,270 5,692,379 62.7%

62.7%

59.7%

58.9%

15.0%

969.5 CUMULATIVE 70,568.2 49,148.7 340.4 47,307.7 381.7 137,164,650 45,849,090 43,950,418 67.0%

67.6%

57.0%

56.6%

13,3%

7 273 3 26.

SHUTDOWNS SCHEDULED OVER THE NEXT 6 MONTHS (TYPE, DATE, DURATION:

Refuelin Ou e

-8 startin A ril 1 1

for 45 da s

27.

IF CURRENTLY SHUTDOWN ESTIMATED STARTUP DATE:

DOCKET NO.:

50-397 UNITNAME:

WNP-2 DATE:

JANUARY 1, 1993 COMPLETED BY:

LB HUTCHISON TELEPHONE:

(509) 377-2486I UNIT SHUTDOWNS REDUCTIONS REPORT PERIOD: DECEMBER 1992 NO.

DATE TYPE HOURS REASON METHOD LER NO SYSTEM COMPONENT CAUSE &CORRECTIVE ACTIONTO PREVENT RECURREN NONE

SUMMARY

WNP-2 operated routinely during December with no outages or significant power reductions.

TYPE REASON METHOD SYSTEM &COMPONENT F-FORCED S-SCHED A-EQUIP FAILURE B-MAINTOR TEST C-REFUELING D-REGULATORYRESTRICTION E-OPERATOR TRAINING&

LICENSE EXAM F-ADMIN G-OPER ERROR H-OTHER 1-MANUAL 2-MANUALSCRAM 3-AUTO SCRAM 4-CONTINUED 5-REDUCED LOAD 9-OTHER EXHIBITF &H INSTRUCTIONS FOR PREPARATION OF DATAENTRY SHEET LICENSEE EVENT REPORT (LER) FILE (NUREG %161)

~ ERAGE DAILYUNITPONER LEVEL MONTH:

DECEMBER 1992 DOCKET NO.:

UNIT:

DATE:

COMPLETED BY:

TELEPHONE:

50-397 WNP-2 DECEMBER 1992 LB HUTCHISON (509) 377-2486 DAYAVERAGEDAILYPOWER LEVEL (MWe-NET)

DAYAVERAGE DAILYPOWER LEVEL (MWe-NET) 1121 17.

1125 1121 18.

1118 3.

1127 19.

1121 1112 20.

1117 1127 21.

1118 6.

1124 22.

11]2 1126 23.

1114 1123 24.

1115 1112 10.

1120 26.

1058 27.

1118 12.

1038 28.

11]8 13.

1124 29.

1113 14.

1122 30.

] 118 15.

16.

1122 1125 31.

I ] 14 INSTRUCTIONS ON THIS FORM, LIST THE AVERAGE DAILYUNIT POWER LEVELIN MWe-NET FOR EACH DAYIN THE REPORTING MONTH. COMPUTE TO THE NEAREST WHOLE MEGAWATI'.

THESE FIGURES WILLBE USED TO PLOT A GRAPH FOR EACH REPORTING MONTH. NOTE THAT WHEN MAXIMUMDEPENDABLECAPACITYIS USED FOR THE NET ELECTRICALRATINGOF THE UNIT,THRE MAY BE OCCASIONS WHEN THE DAILY AVERAGE POWER LEVEL EXCEEDS THE 100% LINE (OR THE RESTRICTED POWER LEVELLINE). IN SUCH CASES, THE AVERAGE DAILYUNITPOWER OUTPUT SHEET SHOULD BE FOOTNOTED TO EXPLAINTHE APPARENT ANOMALY.