GO2-92-161, Monthly Operating Rept for June 1992 for WPPSS Unit 2
| ML17289A742 | |
| Person / Time | |
|---|---|
| Site: | Columbia |
| Issue date: | 06/30/1992 |
| From: | John Baker, Hutchison L WASHINGTON PUBLIC POWER SUPPLY SYSTEM |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| GO2-92-161, NUDOCS 9207220386 | |
| Download: ML17289A742 (10) | |
Text
ACCELERATED DISTRIBUTION DEMONSTPWTION SYSTEM Cp REGULATE INFORNRTION DISTRIBUTIO1+YSTEN (RIDE)
DOCKET
>ACIL:50-397 WPPSS Nuclear Project, Unit 2, Washington Public Powe 05000397 AUTH.NAME AUTHOR AFFILIATION HUTCHISON,L.B.
Washington Public Power Supply System BAKER,J.W.
Washington Public Power Supply System RECIP.NAME RECIPIENT AFFILIATION
SUBJECT:
operating rept for June 1992 for WPPSS unit 2.
W/92070 tr.
DISTRIBUTION CODE:
IE24D COPIES RECEIVED:LTR J ENCL Q SIZE: 9 TITLE: Monthly Operating Report (per Tech Specs)
NOTES:
REC1PIENT ID CODE/NAME PD5 LA DEANFW.
INTERNAL: ACRS AEOD/DSP/TPAB NRR/DOEA/OEAB RGN5 COPIES LTTR ENCL 3
3 1
1 10 lo 1
1 1
1 1
1 RECIPIENT ID CODE/NAME PD5 PD AEOD/DOA LPEB10 REG FILE 01 COPIES LTTR ENCL 1
1 1
1 1
1 1
1 EXTERNAL:
EGGG BRYCE,J.H NSIC 1
1 1
1 NRC PDR 1
1 NOTE TO ALL"RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASIE! CONTACT THE DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT. 20079) TO ELIMINATEYOUR NAMEFROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!
TOTAL NUMBER OF COPIES REQUIRED:
LTTR 24 ENCL 24
4 r
WASHINGTONPUBLIC POWER SUPPLY SYSTEM P.O. Bax 968 ~ 3000 George Wasbtngton Way ~ Rtcbland, Wasbtngton 99352-096'8
~ (509) 372-5000 Docket No. 50-397 July 7, 1992 G02-92-161 U.S. Nuclear Regulatory Commission Document Control Desk Washington, D.C.
20555
Dear Sir:
Subject:
NUCLEAR PLANT NO. 2 MONTHLYOPERATING REPORT JUNE 1992 Transmitted herewith is the Monthly Operating Report for the month of June 1992 as required by our Technical Specifications 6.9.1.6.
Very truly yours, J.
Baker
-2 Plant Manager (MD 927M)
LBH:bap Enclosure CC:
Mr. W.H. Lovelace, NRC, Washington, DC Mr. J.B. Martin, NRC Region V Ms. Dottie Sherman, ANI, Hartford, CT Mr. C. Sorensen, NRC Resident Inspector (901A)
Mr. J.T. Wheelock, INPO Mr. F. Yost, UtilityData Institute
~"ot "'
9207220386,920630
,.PDR.,
ADOCK 0500039 R
(
( r l,"
~~
a 1
4I I
C V'~
S
'I V
OPERATING DATA REPORT WNP-2 DATE:
01-Jul-92 1.
DOCKET: 50-397 2.
REPORTING PERIOD:
3.
UTILITY CONTACT:
Jun-92 OUTAGE + ON-LINE HOURS LEONARD HUTCHISON (509) 377-2486 720 4.
LICENSED THERMAL POWER,(MWt):
5.
NAMEPLATE RATING (GROSS MWe):
6.
DESIGN ELECTRICAL RATING (NET MWe):
7.
MAXIMUM DEPENDABLE CAPACITY (GROSS MWe):
8.
MAXIMUM DEPENDABLE CAPACITY (NET MWe):
9.
IF CHANGES OCCUR ABOVE SINCE LAST REPORT, GIVE REASONS:
None.
3323 1200.9 1100 1129 1085 10.
POWER TO WHICH RESTRICTED, IF ANY (NET MWe):
11.
REASONS FOR RESTRICTIONS, IF ANY:
None.
12.
REPORT PERIOD HOURS 13.
HOURS REACTOR CRITICAL 14.
RX RESERVE SHTDWN HRS 15.
HRS GENERATOR ON LINE 16.
UNIT RESERVE SHUTDOWN HOURS 17.
GROSS THERMAL ENERGY (MWH) 18.
GROSS ELECTRICAL ENERGY (MWH) 19.
NET ELECTRICAL ENERGY (MWH)
- 20. UNIT SERVICE FACTOR
- 21. UNIT AVAILABILITYFACTOR 22.
UNIT CAPACITY FACTOR (MDC NET) 23.
UNIT CAPACITY FACTOR (DER NET) 24.
UNIT FORCED OUTAGE RATE 25.
FORCED OUTAGE HOURS MONTH 720 0.0 0.0 0 '0.0 0
0
-6405 0.04 0.0%
- 0. 0%'
0.0%
0.0 YEAR 4367 2085.0 0.0 2042.6 0.0 6588250 2233530 2122910 46.84 46.84 44.
84'4.
24'1.34 552.0, CUMULATIVE 66151.2 45475.7 340.4 43842.5 381.7 126204072 42089350 40380949 66.34 66.9%
55.84 55.5%
13.54 6855.8 2 6 ~
SHUTDOWNS SCHEDULED OVER THE NEXT 6 MONTHS (TYPE g DATE g DURATION)
- 27. IF CURRENTLY SHUTDOWN ESTIMATED STARTUP DATE:
7/10/92
C ro DOCKET NO.:
50-397 UNITNAME:
WNP-2 DATE:
JULY 1, 1992 COMPLETED BY:
LB HUTCHI$0N TELEPHONE:
(509) 377-2486 UNIT SHUTDOWNS / REDUCTION REPORT PERIOD: JUNE 19~2 92-03 4/18/92 S
720 RC FUEL XX Refueling outage continues.
SUMMARY
- WNP-2 remained shutdown during June for scheduled refueling outage.
TYPE REASON METHOD SYSTEM &COMPONENT F-FORCED S-SCHED A-EQUIP FAILURE B-MAINTOR TEST C-REFUELING D-REGULATORYRESTRICTION E-OPERATOR TRAINING&
LICENSE EXAM F-ADMIN G-OPER ERROR H-OTHER 1-MANUAL 2-MANUALSCRAM 3-AUTO SCRAM 4-CONTINUED 5-REDUCED LOAD 9-OTHER EXHIBITF &H INSTRUCTIONS FOR PREPARATION OF DATAENTRY SHEET LICENSEE EVENT REPORT (LER) FILE (NUREG4161)
~
~
A RAGE DAILYUNIT POWER L L
DOCKET NO.:
UNIT:
DATE:
COMPLETED BY:
TELEPHONE:
50-397 WNP-2 JULY 1, 1992 LB HUTCHISON (509) 377-2486 MONTH:
JUNE 1992 DAYAVERAGE DAILYPOWER LEVEL (MWe-NET)
DAYAVERAGEDAILYPOWER LEVEL (MWe-NET) 17.
2.
18.
3.
19.
20.
S.
21.
22.
7.
10.
26.
27.
12.
28.
13.
29.
14.
30.
15.
31.
16.
INSTRUCTIONS ON THIS FORM, LIST THE AVERAGE DAILYUNIT POWER LEVELIN MWe-NET FOR EACH DAYIN THE REPORTING MONTH. COMPUTE TO THE NEAREST WHOLE MEGAWATT.
THESE FIGURES WILLBE USED TO PLOT A GRAPH FOR EACH REPORTING MONTH. NOTE THATWHEN MAXIMUMDEPENDABLECAPACITYIS USED FOR THE NETELECTRICALRATINGOF THE UNIT,THRE MAY BE OCCASIONS WHEN THE DAILY AVERAGE POWER LEVEL EXCEEDS THE 100% LINE (OR THE RESTRICTED POWER LEVELLINE). IN SUCH CASES, THE AVERAGE DAILYUNITPOWER OUTPUT SHEET SHOULD BE FOOTNOTED TO EXPLAINTHE APPARENT ANOMALY.
0 4
t g
g
\\