GO2-92-028, Forwards Results of Plant Analysis of EDR-TK-4A Split Sample Collected in Conjunction W/Ref NRC Insp Rept 50-397/91-40

From kanterella
(Redirected from GO2-92-028)
Jump to navigation Jump to search
Forwards Results of Plant Analysis of EDR-TK-4A Split Sample Collected in Conjunction W/Ref NRC Insp Rept 50-397/91-40
ML17289A359
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 01/30/1992
From: John Baker
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To: Bocanegra R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
Shared Package
ML17289A358 List:
References
GO2-92-028, GO2-92-28, NUDOCS 9203050007
Download: ML17289A359 (4)


Text

4 C

RECEiVED HRC REGION V WASHINGTON PUBLIC POWER SUPPLQQ'~M(

Q iLi; 2g P.O. Bo'r96'8 ~ 3000 George Wasblng(on Way ~ Rtcbktnd, Wasbtngton 99352~

~ t509) 372-5000 January 30, 1992 G02-92-028 Docket No. 50-397 Ray Bocanegra U.S. Nuclear Regulatory Commission Region V

, 1450 Maria Lane, Suite'210 Walnut Creek, California 94596-5368

Dear Mr. Bocanegra:

Subject:

NUCLEAR PLANT NO. 2, OPERATING LICENSE NPF-21 NRC SPLIT SAMPLE RESULTS

Reference:

NRC Region V Inspection Report 0'50-397/91-40, Dated March 19, 1991 The results of WNP-2's analysis of the EDR-TK-4A'split sample collected in conjunction with the referenced NRC Inspection Report, are attached.

Very truly yours, J. W. Baker WNP-2 Plant Manager (927M)

DJP/grt Attachment CC:

JB Martin - NRC RV NS Reynolds - Winston Ec Strawn PL Eng - NRC/13E16 DL Williams - BPA/399 NRC Site Inspector - 901A 9203050007 920226 PDR ADOCK 05000397 8

PDR

~'

ATTACHMENTTO NRC SPLIT SAMPLE RESULTS WNP-2's analysis of EDR-TK-4A split sample; Sample Number:

91-9089 Sample from:

EDR-TK-4A Sample date:

December 17, 1991, at 1020 pe~i Tritium Iron-55 Strontium-89 Strontium-90 Gross Beta Counted on 1.19E-3 + 1.87E-5 uCi/cc 2.65E-8 f 1.54E-8 uCi/cc 5.64E-9 f 4.46E-9 uCi/cc 63.41E-9 uCi/cc 3.03E-9 + 1.01E-9 January 6, 1992, at 1430

~"