GO2-91-049, Application for Amend to License NPF-21 Revising Tech Spec 3/4.3.2 & Table 4.3.2.1-1 Re Isolation Actuation Instrumentation & Surveillance Requirements

From kanterella
(Redirected from GO2-91-049)
Jump to navigation Jump to search
Application for Amend to License NPF-21 Revising Tech Spec 3/4.3.2 & Table 4.3.2.1-1 Re Isolation Actuation Instrumentation & Surveillance Requirements
ML17286A660
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 03/11/1991
From: Sorensen G
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML17286A661 List:
References
GO2-91-049, GO2-91-49, NUDOCS 9103210132
Download: ML17286A660 (14)


Text

ACCELERATED DISTRIBUTION DEMONS+TION SYSTEM REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:9103210132 DOC.DATE: 91/03/11 NOTARIZED: YES

'OCKET FACIL:50-397 WPPSS Nuclear Project, Unit 2, Washington Public Powe 05000397 AUTH.NAME AUTHOR AFFILIATION SORENSEN,G.C.

Washington Public Power Supply System RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)

'R

SUBJECT:

Forwards request for amend to TS 3/4.3.2

& Table 4.3.2.1-1 isolation actuation instrumentation

& surveillance requirements.

DISTRIBUTION CODE:

AOOID COPIES RECEIVED:LTR l

ENCL J SIZE:

TITLE: OR Submittal:

General Distribution NOTES:

P3 RECIPIENT ID CODE/NAME PD5 LA ENG, P. L.

INTERNAL: ACRS NRR/DET/ESGB NRR/DST 8E2 NRR/DST/SICB 7E NUDOCS-ABSTRACT OGC/HDS1 RES/DSIR/EIB EXTERNAL: NRC PDR COPIES LTTR ENCL 1

1 2

2 6

6 1

1 1

1 1

1 1

1 1

0 1

1 1

1 RECIPIENT ID CODE/NAME PD5 PD NRR/DET/ECMB 9H NRR/DOEA/OTSB11 NRR/DST/SELB 8D NRR/DST/SRXB 8E

~0~EMIL 01 NSIC COPIES LTTR ENCL 1

1 1

1 1

1 1

1 1

1 1

0 1

1 1

1 D

D D

NOTE TO ALL"RIDS" RECIPIENTS:

A D

D PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENI'ONTROLDESK, ROOM P 1-37 (EXT. 20079) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!

TOTAL NUMBER OF COPIES REQUIRED:

LTTR 24 ENCL 22

t r

C

WASHINGTON PUBLIC POWER SUPPLY SYSTEM P.O. Box 968

~ 3000 George Washington Way

~ Richland, Washington 99352 March 11, 1991 G02-91-049 Docket No. 50-397 U.S. Nuclear Regulatory Commission Attn:

Document Control Desk Washington, D.C.

20555 Gentlemen:

Subject:

NUCLEAR PLANT NO. 2, OPERATING LICENSE NPF-21, REQUEST FOR AMEND.

TO TS 3/4.3.2

& TABLE 4.3.2.1-1 ISOLATION ACTUATION INSTRUMENTATION AND SURVEILLANCE RE(UIREMENTS

Reference:

See Attachment l.

In accordance with the Code of federal Regulations, Title 10 Parts 50.90 and

2. 101, the Supply System hereby submits a request for amendment to the WNP-2 Technical Specifications (TS).

Specifically, the Supply System is requesting that the subject sections be modified, see Attachment 2, to incorporate Isolation Actuation surveillance frequencies and outage times recommended in References 1) and 2) and approved by the Staff in References 3) and 4).

References 5), 6) and 7) requested changes to Reactor protection system (RPS),

Emergency Core Cooling System (ECCS),

and Reactor Core Isolation Cooling (RCIC)

TS, to allow optimizing surveillance test intervals (STIs) and allowable outage times (AOTs).

Because some isolation actuation instrumentation is common to either RPS or ECCS instrumentation, maximum benefit for the common instrumenta-tion required similar analysis with respect to the isolation actuation function.

Reference

1) provided the analysis to justify similar changes in the Isolation Actuation STIs and AOTs for the common instrumentation.

Reference

2) provided the analysis to justify similar changes to the remainder of the actuation isolation instruments (i.e., those not common to either ECCS or RCIC).

9103210132 910311 PDR ADOCK 05000397 P

PDR

t

'4 S g

t t

REO/EST FOR AMEND. TO TS 3/4.3.2 5 TABLE 4.3.2.1-1 ISOLATION

'ND SURVEILLANCE RE(UIREHENTS The technical basis for the isolation actuation instrumentation TS improvements is based on the reliability approach established in support of changes proposed by the Boiling Water Reactor Owners Group (BWROG) for RPS,

ECCS, RCIC and Rod Block Instrumentation.

In application of the BWROG methodology, the isolation actuation instrumentation fault trees were developed to model the isolation system of each BWR plant line.

The affect of the proposed changes in STI and AOTs on the isolation signal could then be compared to the availability of the isolation signal without the proposed changes in the fault tree.

The net change in the failure of the system isolation function was then used to determine the acceptability of the proposed changes.

As shown in Table 2 of Reference

1) for BWR 5/6 relay plants (ECCS and RCIC instrumentation),

the increase in probability of isolation failure due to an STI increase to 92 days is negligible.

Further, Reference
1) section 3.5 provides a sensitivity analysis showing that an AOT increase to 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> has a less than 2% effect on the probability of failure of the isolation function given a demand.

For Actuation Instrumentation not used for ECCS and RCIC, Reference

2) stated that STI and AOT changes were assessed to be acceptable if the calculated change in isolation failure frequency was less than lE-07/year on an absolute basis or 10% on a relative basis.

As stated in References 3) and 4),

the staff found the analysis an acceptable basis for extending the STIs and AOTs of the subject instrumentation.

Because of more restrictive AOT requirements on RPS instrumentation established in Reference 5),

the test and repair AOTs for isolation instrumentation common to RPS is constrained to 6 and 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> respectively.

AOTs established in Reference

6) for ECCS equipment are 6 and 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> (for test and repair AOTs) which are the values proposed by this submittal for the isolation actuation instrumentation.

Where an isolation actuation instrument is common to both RPS and the isolation actuation instrumentation the more restrictive AOT is proposed.

In both References

3) and 4), the Staff found the corresponding BWROG submittals acceptable bases for extending STIs and AOTs for isolation actuation instrumenta-tion and stated that applicants for the proposed TS changes must:

1.

Confirm the applicability of the generic analyses to the plant 2.

Confirm that any increase in instrument drift due to the extended STIs is properly accounted for in the setpoint calculation methodology.

(For additional information on this issue, see letter from C.E.

Rossi to R.F.

Janecek, dated April 27, 1988.)

Accordingly, in response to condition 1,

the Supply System confirms that the generic analyses provided in References

1) and 2) are applicable to WNP-2.

See Attachment 3,

a GE affidavit attesting the applicability of Reference

2) to WNP-2.)

T r

RE/VEST FOR AMEND. TO TS 3/4.3.2

& TABLE 4.3.2.1-1 ISOLATION

'ND SURVEILLANCE RE(UIREMENTS For condition 2, additional clarification was provided in the noted letter (C.E.

Rossi to R.F. Janecek, dated April 27, 1988) such that:

"To address the setpoint drift issue in the amendment proposals to extend

STIs, licensees need only confirm that the setpoint drift which could be expected under the extended STIs has been studied and either (1) has been shown to remain within the existing allowance in the RPS and ESFAS instrument setpoint calculation or (2) that the allowance and setpoint have been adjusted to account for the additional expected drift.

No additional information need be provided for staff review.

However, records showing the actual setpoint calculation and supporting data should be retained onsite for possible future staff audit."

In response, the Supply System has reviewed setpoint drift characteristics of the isolation actuation instrumentation affected by this change and confirmed that the setpoints will remain within existing allowances throughout the requested surveillance test interval extensions.

Appropriate detailed justification for the proposed changes is provided in References 1) and 2) which were in turn found acceptable by the Staff in References

3) and 4).

Further, the proposed TS. changes represent an optimization of testing resulting in negligible impact on the isolation function which when

'combined with the Reference 5), 6) and 7) changes to RPS, ECCS and RCIC provide a net improvement to plant safety and operation.

The Supply System has determined that these changes do not represent a

significant hazard and provides the following in support of this conclusion:

1)

The proposed changes do not involve a

significant increase in the probability or consequences of an accident previously evaluated because the changes have been shown to have negligible impact to overall isolation actuation function failure rates.

As shown by References 1) and 2), the changes do not significantly degrade the reliability of the isolation actuation instrumentation.

Hence, the probability or consequences of previously evaluated accidents are not significantly increased due to this change.

To the contrary, as stated in References 1) and 2), the changes combined with RPS, ECCS and RCIC changes requested in References 5),

6) and

7) represent a net improvement to plant safety.

2)

The proposed changes do not create the possibility of a new or different kind of accident from any accident previously evaluated because isolation actuation function and reliability are not significantly degraded by these changes.

No new modes of plant operation are introduced with these changes.

No new or different kind of accident is therefore credible.

T

t Page 4

RE(VEST FOR AMEND. TO TS 3/4.3.2

& TABLE 4.3.2.1-1 ISOLATION AND SURVEILLANCE RE(UIREMENTS 3)

The proposed changes do not involve a significant reduction in a margin of safety

because, as shown in References 1) and 2) and found acceptable by the Staff in References 3) and 4), the changes combined with previously requested changes

[(References 5),

6) and 7)] represent an overall net

, improvement to plant safety and operations.

Further, the changes were shown to have negligible impact on isolation function availability and reliability.

As such, the margin of safety overall is enhanced by the proposed changes.

As discussed above, the Supply System considers that this change does not involve a significant hazards consideration, nor is there a potential for significant change in the types or significant increase in the amount of any effluents that may be released offsite, nor does it involve a significant increase in individual or cumulative occupational radiation exposure.

Accordingly, the proposed change meets the eligibility criteria for categorical exclusion set forth in 10 CFR 51.22(c)(9) and therefore, per 10 CFR 51.22(b),

an environmental assessment of the changes is not required.

This Technical Specification change has been reviewed and approved by the WNP-2 Plant Operations Committee (POC) and the Supply System Corporate Nuclear Safety Review Board (CNSRB).

In accordance with 10 CFR 50.91, the State of Washington has been provided a copy of this letter.

Very truly yours, G.

C.

S rensen, Manager Regulatory Programs PLP/bk Attachments CC:

RG Waldo -

EFSEC JB Hartin -

NRC RV NS Reynolds

- Winston

& Strawn PL Eng -

NRC DL Williams - BPA/399 NRC Site Inspector

- 901A

I I

I

STATE OF WASHINGTON)

)

COUNTY OF BENTON

)

Subject:

@Qds/ W 7 + ~aer4jAr(w~

3b.s z-I. G. C.

SORENSEN, being duly sworn, subscribe to and say that I am the Manager, Regulatory Programs, for the WASHINGTON PUBLIC POWER SUPPLY SYSTEM, the applicant herein; that I have the full authority to execute this oath; that I have reviewed the foregoing; and that to the best of my knowledge, information, and belief the statements made in it are true.

DATE y/

&/~Cd 1991 G.

C.

S

ensen, Manager Regulatory Programs On this date personally appeared before me G.

C.

SORENSEN, to me known to be the individual who executed the foregoing instrument, and acknowledged that he signed the same as his free act and. deed for the uses and purposes herein mention.ed GIVEN under my hand and seal this ~day of 1991.

Notary Pub ic in and for the STATE OF WASHINGTON Residing at Hy Commission Expires

.0 I

1 4

))

II I

~ggybl I'

~ r

~ 1 ~ ~ ~

ia/c

'p

~1 ~

ATTACHMENT 1 References 1)

GE Topic Report NEDC-30851P-A, Supplement 2,

"Technical Specification Improvement Analysis for BWR Isolation Actuation Instrumentation Common to RPS and ECCS Instrumentation",

dated March 1989.

2)

GE Topical Report NEDC-31677P-A, "Technical Specification Improvement Analyses for BWR Isolation Actuation Instrumentation",

dated July 1990.

3)

Letter, CE Rossi (NRR) to DN Grace (BWROG) "General Electric Company (GE)

Topical Report NEDC-30851P, Supplement 2,

'Technical Specification Improvement Analysis for BWR Isolation Instrumentation Common to RPS and ECCS Instrumentation',

dated January 6,

1989 4)

Letter, CE Rossi (NRR) to SD Floyd (BWROG) "General Electric Company (GE)

Topical Report NEDC-31677P," Technical Specification Improvement Analysis for BWR Isolation Instrumentation, dated

June, 1990.

5)

Letter, G02-89-161, GC Sorensen to NRC "Request for Amendment to Technical Specification 3/4.3. 1 Reactor Protection System Instrumentation and Closeout of Item 4.5.3 of Generic Letter 83-28", dated September 14, 1989 6)

Letter G02-89-162, GC Sorensen (SS) to

NRC, "Request for Amendment to Technical Specification 3/4.3. 1 Reactor Protection System Instrumentation and Closeout of Item 4.5.3 of Generic Letter 83-28", dated September 14, 1989 (Proprietary information supporting Reference 5).

7)

Letter, G02-91-035, GC Sorensen to NRC "Request for Amendment to Technical Specification 3/4.3.3 and Tables 3.3.3-1, 4.3.3. 1-1, 3.3.5-1 and 4.3.5. 1-1 Emergency Core Cooling and Reactor Core Isolation Cooling System Acuation Instrumentation and Surveillance Requirements",

dated February 21, 1991.