GO2-85-758, Forwards Crdr & Emergency Procedure Functional Task Analysis Summary Rept & Emergency Operating Procedures, Including Rev 1 to Procedure 5.0.0, Emergency Procedure General Precautions

From kanterella
(Redirected from GO2-85-758)
Jump to navigation Jump to search
Forwards Crdr & Emergency Procedure Functional Task Analysis Summary Rept & Emergency Operating Procedures, Including Rev 1 to Procedure 5.0.0, Emergency Procedure General Precautions
ML17278A470
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 11/01/1985
From: Sorensen G
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To: Butler W
Office of Nuclear Reactor Regulation
Shared Package
ML17278A471 List:
References
GO2-85-758, NUDOCS 8511110262
Download: ML17278A470 (4)


Text

I REGULATO~INFO'TION DISTR IBUT ION STEM

( R IDS )

ACCESSION NBR: B511110262 DOC. DATE: 85/11/01 NOTARI ED:

NO DOCKET 8 FAC IL:50-397 WPPSS Nuclear Pro Jecti Unit 2>

Washington Public Pore 05000397 AUTH. NAME AUTHOR AFFILIATION SORENSENI G. C.

Washington Public Power Supply System RECIP. NAME RECIPIENT AFFILIATION BUTLERI W. R.

Licensing Branch 2

SUBJECT:

Forwards "CRDR '5 Emergency Procedure Functional Task Analgsis Summary Rept" 9~ emergency operating proceduresi including Rev 1 to,Procedure

5. 0. OI "Emergencu Procedure General Precautions.

DISTRIBUTION CODE:

AOOBD COPIEB RECEIVED: LTR +ENCL ~BIIE:

TITLE: OR/Licensing Submittal:

Supp I 1 to NUREQ-0737(Generic Ltr 82-33)

NOTES QL: 12/20/83 05000397 REC IP IENT ID CODE/NAME NRR LB2 BC COPIES LTTR ENCL 7

7 RECIPIENT ID CODE/NAME COPIES LTTR ENCL

, INTERNAL: ADM/LFMB NRR PAULSONI N NRR/DHFS/PSRB NRR/DL/QRB5 NRR/DSI/ICSB

~l NRaj B

ES EXTERNAL: 24X NRC PDR 1

0 1

1 2

2 5

5 1

1 1

1 1

1 IE/DEPER/EPB NRR/DHFS/HFEB NRR/DL/ORAB NRR /DS I/CPB NRR /DSI/METH NRR /DS I/RSB RGN5 LPDR NSI C 3

3 5

5 1

1 1

1 1

1 1

1 1

1 1

1 1

TOTAL NUMBER OF CQP IES REQUIRED:

LTTR 36 ENCL 35

I

/

0 V(

h I'J "

I 6

Ih,'I hQ t,'Q I'F I

1 t

~ j.

~

V W

II

< I" t

V h J-"L II

",'~ I'"W, Y;Qy

l.I >>. 'l g,ll hw

~~ltll

'I), )

II II V

h

Washington Public Power Supply System P.O. Box 968 3000 George Washington Way Richland, Washington 99352 (509) 372-5000 ss~s~x02m ss>ioi PDR ADOCK 05000397 F

PDR November 1,

1985 G02-85-758 Docket No. 50-397 Director of Nuclear Reactor Regulation Attention:

Mr.

W.

R. Butler, Chief Licensing Branch No.

2 Division of Licensing U.S. Nuclear Regulatory Commission Washington, D.C.

20555

Dear Mr. Butler:

Subject:

NUCLEAR PLANT NO.

2 DETAILED CONTROL ROOM DESIGN REVIEW (DCRDR)

SUMMARY

REPORT, SUBMITTAL OF Licensing Condition (16) Attachment 2, Requirement 1, to the WNP-2 Operating

License, requires submittal of a Detailed Control Room Design Review (DCRDR)

Summary Report, "not later than six months prior to the first refueling outage".

Accordingly, the attached report is submitted.

Copies of the WNP-2 Emergency Operating Procedures (EOPs) that were utilized in the preparation of this report have been included as an additional attach-ment (No. 2).

With this submittal, the Supply System considers Licensing Condition (16} Attachment 2, Requirement 1, to be satisfied.

Should you have any further questions, please contact Mr. P. L. Powell, Manager, WNP-2 Licensing.

Very truly yours, G.

C.

S

ensen, Manager Regulatory Programs PLP kit Attachments (2}

cc:

RC Barr

- BPA JO Bradfute -

NRC JB Martin NRC RV E. Revell

- BPA AD Toth NRC Site NS Reynolds BLCP8R y0@~

t b

J~

I'