GO2-85-758, Forwards Crdr & Emergency Procedure Functional Task Analysis Summary Rept & Emergency Operating Procedures, Including Rev 1 to Procedure 5.0.0, Emergency Procedure General Precautions
| ML17278A470 | |
| Person / Time | |
|---|---|
| Site: | Columbia |
| Issue date: | 11/01/1985 |
| From: | Sorensen G WASHINGTON PUBLIC POWER SUPPLY SYSTEM |
| To: | Butler W Office of Nuclear Reactor Regulation |
| Shared Package | |
| ML17278A471 | List: |
| References | |
| GO2-85-758, NUDOCS 8511110262 | |
| Download: ML17278A470 (4) | |
Text
I REGULATO~INFO'TION DISTR IBUT ION STEM
( R IDS )
ACCESSION NBR: B511110262 DOC. DATE: 85/11/01 NOTARI ED:
NO DOCKET 8 FAC IL:50-397 WPPSS Nuclear Pro Jecti Unit 2>
Washington Public Pore 05000397 AUTH. NAME AUTHOR AFFILIATION SORENSENI G. C.
Washington Public Power Supply System RECIP. NAME RECIPIENT AFFILIATION BUTLERI W. R.
Licensing Branch 2
SUBJECT:
Forwards "CRDR '5 Emergency Procedure Functional Task Analgsis Summary Rept" 9~ emergency operating proceduresi including Rev 1 to,Procedure
- 5. 0. OI "Emergencu Procedure General Precautions.
DISTRIBUTION CODE:
AOOBD COPIEB RECEIVED: LTR +ENCL ~BIIE:
TITLE: OR/Licensing Submittal:
Supp I 1 to NUREQ-0737(Generic Ltr 82-33)
NOTES QL: 12/20/83 05000397 REC IP IENT ID CODE/NAME NRR LB2 BC COPIES LTTR ENCL 7
7 RECIPIENT ID CODE/NAME COPIES LTTR ENCL
, INTERNAL: ADM/LFMB NRR PAULSONI N NRR/DHFS/PSRB NRR/DL/QRB5 NRR/DSI/ICSB
~l NRaj B
0 1
1 2
2 5
5 1
1 1
1 1
1 IE/DEPER/EPB NRR/DHFS/HFEB NRR/DL/ORAB NRR /DS I/CPB NRR /DSI/METH NRR /DS I/RSB RGN5 LPDR NSI C 3
3 5
5 1
1 1
1 1
1 1
1 1
1 1
1 1
TOTAL NUMBER OF CQP IES REQUIRED:
LTTR 36 ENCL 35
I
/
0 V(
h I'J "
I 6
Ih,'I hQ t,'Q I'F I
1 t
~ j.
~
V W
II
< I" t
V h J-"L II
",'~ I'"W, Y;Qy
- l.I >>. 'l g,ll hw
~~ltll
'I), )
II II V
h
Washington Public Power Supply System P.O. Box 968 3000 George Washington Way Richland, Washington 99352 (509) 372-5000 ss~s~x02m ss>ioi PDR ADOCK 05000397 F
PDR November 1,
1985 G02-85-758 Docket No. 50-397 Director of Nuclear Reactor Regulation Attention:
Mr.
W.
R. Butler, Chief Licensing Branch No.
2 Division of Licensing U.S. Nuclear Regulatory Commission Washington, D.C.
20555
Dear Mr. Butler:
Subject:
NUCLEAR PLANT NO.
2 DETAILED CONTROL ROOM DESIGN REVIEW (DCRDR)
SUMMARY
REPORT, SUBMITTAL OF Licensing Condition (16) Attachment 2, Requirement 1, to the WNP-2 Operating
- License, requires submittal of a Detailed Control Room Design Review (DCRDR)
Summary Report, "not later than six months prior to the first refueling outage".
Accordingly, the attached report is submitted.
Copies of the WNP-2 Emergency Operating Procedures (EOPs) that were utilized in the preparation of this report have been included as an additional attach-ment (No. 2).
With this submittal, the Supply System considers Licensing Condition (16} Attachment 2, Requirement 1, to be satisfied.
Should you have any further questions, please contact Mr. P. L. Powell, Manager, WNP-2 Licensing.
Very truly yours, G.
C.
S
- ensen, Manager Regulatory Programs PLP kit Attachments (2}
cc:
RC Barr
- BPA JO Bradfute -
NRC JB Martin NRC RV E. Revell
- BPA AD Toth NRC Site NS Reynolds BLCP8R y0@~
t b
J~
I'