GO2-84-272, Advises That Reactor Coolant Disolved Gas Grab Sampling Capability Installed,Tested & Operational,Per Condition of Amend 1 to License NPF-21.Procedures Prepared & Appropriate Personnel Trained
| ML17277B391 | |
| Person / Time | |
|---|---|
| Site: | Columbia |
| Issue date: | 04/27/1984 |
| From: | Sorensen G WASHINGTON PUBLIC POWER SUPPLY SYSTEM |
| To: | Schwencer A Office of Nuclear Reactor Regulation |
| References | |
| GO2-84-272, NUDOCS 8405040199 | |
| Download: ML17277B391 (4) | |
Text
REGULATORY 1, ORMATION DISTRIBUTION SYS
< (BIDS)
ACCESSION NBR:8005040199 DOC.DATE: 80/00/27 NOTARIZED:
NO FACIL:50 397 NPPSS Nuclear ProJect<
Unit 2~ Nashington Public Powe AUTH BYNAME AUTHOR AFFILIATION SORENSEN,G.CD Washington Public Power Supply System RECIP ~ NAME RECIPIENT AFFILIATION
=SCHHENCERiA.
'icensing Branch 2
SUBJECT:
Advises. that reactor coolant disolved gas grab sampling capability installed. tested 8 operationalrper condition of-Amend 1 to License NPF-21.Procedures prepared 8 appropriate personnel trained.
DISTRIBUTION CODE:
BO01S COPIES RECEI YED:LTR ENCL SIZE:
Q TITLE: Licensing Submittal:
PSAR/FSAR Amdts 8 Related Correspondence NOTES:
DOCKET 05000397 REC IPIENT ID CODE/NAME NRR/DL/ADLl NRR LB2 LA COPIES LTTR ENC 1
1 RECIPIENT L
ID CODE/NAME NRR LB2 BC AULUCKtR~
01 COPIES LTTR EflCL INTERNALS ELD/HDS2 IE/DEPER/EPB 36 IE/DQASIP/QAB21 NRR/DE/CEB 11 NRR/DE/EQB 13 NRR/DE/MEB 18 NRR/DE/SAB 20 NRR/DHFS/HFEBQO NRR/DHFS/PSRB NRR/DS I/AEB 26 NRR/DS I/CPB 10 NRR/DSI/ICS8 16 NRR/DS I/PSB 19 NRR/DSI/RSB 23 RGN5 EXTERNAL: ACRS 41 DMB/DSS (AMDTS)
LPDR 03 NSIC 05.
1 3
1 1
2 1
1 1
1 1
1 1
1 3
3 6
6 1
1 1
1 1
1 IE FILE IE/DEPER/IRB 35 NRR/DE/AEAB NRR/DE/EHEB NRR/DE/GB 28 NRR/DE/MTEB 17 NRR/DE/SGED 25 NRR/DHFS/LQB 32 NRR/DL/SSPB'RR/DSI/ASB NRR/DSI/CSB 09 NRR/DSI/METB 12 NRR/DSI/RAB 22 OQ 0 AMI/MIB BNL(AMDTS ONLY)
FEMA"REP DIY 39 NRC PDR 02 NTIS 1
1 1
1 2
1 1
1 1
1 1
1 1
1 1
'1 1
TOTAL NUMBER OF COPIES REQUIRED:
LTTR 53 ENCL
H M if
~ tl li W
Mli ii Ii>i W1 1 a'iii
~
~
I
>fta ii
>'I fit f gr tf li I Chai I"'ii, i i i
~ H i >>i(
s'Q(4; Jl, 0
I ~
W,'t~'1
~ k t>
J l I'. (1/
1 If; M
'K i i q
1
'14
~
1
)4 '!'1 i
I 4'i g K
l, 1
4>"tt,
~
'll (Mk Ik t4I ct'k, I 'ff, tfl 1'cta (HH ~
4 i K" t'il'j4',1 k
t )
ji if, i
a O W>l H
ll f I'I l'
I'iIt'f' w lf M
a A
H f K
~
t
'11 I
i f,ti,'lg H
I i 1>
iit
)bi I-i',lit(i M
l k
Jt J(
W )ff ti t
Ii Et tl I X t.
i ilj i
I 4(
!'it I
i I
KsK K k
I 44 j(
r->I if I
r
,PI M k, I'44 i'I l,
it I
H 1,
44 i
~
4 M
I KJ ts
Washington Public Power Supply System P.O. Box 968 3000 George Washington Way Richland, Washington 99352 (509) 372-5000 April 27 1g84 G02-84-272 Docket No. 50-397 Director of Nuclear Reactor Regulation Attention:
Hr. A. Schwencer, Chief Licensing Branch No.
2 Division of Licensing U.S. Nuclear Regulatory Commission Washington, D.C.
20555 8405040199 840427 PDR ADGCK 05000397 PDR
Dear Hr. Schwencer:
Subject:
Reference:
NUCLEAR PLANT NO.
2 OPERATING LICENSE NPF-21, AMENDMENT NO, 1, LICENSING CONDITION 2.C. (13),
POST-ACCIDENT SAMPLING SYSTEM Letter, G02-84-177, G.
C. Sorensen (SS) to A. Schwencer (NRC}, "Post Accident Sampling System.Modifications",
dated March 28, 1984 As a condition of Amendment No.
1 to the subject Operating License, prior to Hay 1, 1984, the Supply System was required to install, test, and have operational the reactor coolant dissolved gas grab sampling capability.
Accordingly, the Supply System has accomplished the above requirements and considers this licensing condition complete.
In addition, procedures have been prepared and appropriate personnel have been trained.
Additional personnel will receive further training on an "as-needed" basis.
Should you have any questions, please contact Hr. P. L. Powell, Manager, WNP-2 Licensing.
Yery truly yours, G.
C.
- orensen, Manager Regulatory Programs HLA/tmh cc: