GO2-83-814, Forwards WPPSS Unit 2 Single-Loop Operation Analysis. Rept Will Be Incorporated in Amend 32 to FSAR

From kanterella
(Redirected from GO2-83-814)
Jump to navigation Jump to search
Forwards WPPSS Unit 2 Single-Loop Operation Analysis. Rept Will Be Incorporated in Amend 32 to FSAR
ML17277A820
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 09/08/1983
From: Sorensen G
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To: Schwencer A
Office of Nuclear Reactor Regulation
Shared Package
ML17277A821 List:
References
GO2-83-814, NUDOCS 8309290514
Download: ML17277A820 (6)


Text

,Ap r

R<<ESULATORY~ IFORNA<<TION DISTRIBUTION S'lEN (RIDE)

ACCESSI OI< 54R o 83092905]

~l DOC ~ DATE o 83/09/08 NOTARIZED:

NO DOCKET FACIL:50-307 NPPSS Nuclear Project<

Unit 2E Washington Public Powe 0500tl397 AUTH ~NAME, AUTHOR AFFILIATION SORENSEN<G<C.

Washington Public Power Supply System

'RECIP.NAML RECIPIkN1 AFFILIATION SOHO)ENCEREA.

Licensing Branch 2

SUBJECT:

Forwards "NPPSS Unit 2 Single-Loop Operation will be incorporated in Amend 32 to,FSAR.

DISTRIBUTION CODE:

000]S I-'OPIES RECEIVED:LTR ENCL TITLE: Licensing Submittal:

PSAR/FSAR Amdts L Aelated NOTES Analysis;" Rept SIZE:

Correspondence HEC I'P IENT ID CODE/NAME NRA/DL/ADL NRR LB2 LA INTERNAL: kL0/HDS2 IE/DFPER/EPB 36 IE/OEQA/QAB 21 NRR/OE/CEB

]i NRA/DE/EQB

]3 NRA/DE/MEB 18 NRA/DE/SAB 20 NRH/DHFS/HFEBAO NRA/OHFS/PSRB NRI(/OS I/AEB 26 ARE/OSI'/CPB 10 NRH/DSI/ICSB 16 NRk/OS I/PSB 19 NRh/DSI/RSU 23 RGA5 EXTkRNAL: ACRS

<]

DMb/DSS (AMDTS)

LPUR 0$

NS/C 05 COPIES LTTR ENCL 0

0 1

0 3

'3 1

1 1

2 2

i 1

.1 1

1 1

1 1

1 1

1 1

1 i

3 6

.1]

RECIPIENT ID CODE/NAME NRR LB2 BC AULUCKER~

Ol IE F ILE IE/DEPER/IRB 35 NRR/DE/AEAB NRR/DE/EHEB NRR/DE/GB 28 NRR/DE/ATEB i7 NRR/DE/SGEB 25 NRR/DHFS/LQB 32 NRR/DL/8SPB NRR/OSIS ASS NRR/DS I/CSB 09 NRR/DS I/METB 12 NRR'/0 RAB 22 oA

/MIB BNL(AMOTS ONLY)

FEMA REI DIN 59 NRC PDR 02 NTIS COPIES LTTR ENCL 1

1 1

1 1

1 i

1, 0

1 2

2 i

i i

1 1

0 1

1 1

i 1

1 1

1 1,

i 1

0 1

1 1

i 1

~

~ A A

~

TOTAL NUMBER OF COPIES REQUIRED:

LTTR 53 EtlCL 46 A

%!'e7ar

~% ~

e r )

r i.l M

pi i'

Washington Public Power Supply System P.O. Box 968 3000 George Washington Way Richland, Washington 99352 (509) 372-5000 September 8,

1983 G02-83-814 Docket No. 50-397 Director of Nuclear Reactor Regulation Attention:"- Mr. A. Schwencer, Chief Licensing Branch No.

2 Division of Licensing U.S. Nuclear Regulatory Commission Washington, D.C.

20555

Dear Mr. Schwencer:

Subject:

NUCLEAR PROJECT NO.

2 RECIRCULATION SYSTEM SINGLE-LOOP OPERATION Attachment 1 analyzes Single-Loop Operation (SLO) for WNP-2.

In the event the recirculation pump or other component maintenance renders one loop inoperative, SLO operation of WNP-2 is a necessary option for continuous, reliable power generation.

This submittal justifies the use of SLO for WNP-2.

In summary, Attachment 1 concludes:

o No increase in rated MCPR operating limit and no change in the flow dependent Minimum Critical Power Ratio (MCPR) limit factors are required for Single-Loop Operation.

o The, Average Planar Linear Heat Generation Rate (MAPLHGR) reduction factor for single-loop operation is calculated to be 0.84.

o The containment response for a Design Basis Accident recircu-

- lation line break with single-loop operation is bounded by the rated power two-loop operation analysis presented in FSAR Section 6.2.

This attachment will be incorporated in Amendment 32 to the WNP-2 FSAR.

Additionally, Attachment 2 provides the changes required to the technical specifications to support single-loop operation consistent with the safety limits analyzed in Attachment 1.

The WNP-2 draft technical specification has been used for this attachment and only those changes highlighted by double parallel lines in the right hand margin apply to SLO.

ZO 8~0~

q7 830929055, 050003PQR POR ADOC

Y l

A.< Schwencer Page Two September 8,

1983 RECIRCULATION SYSTEM SINGLE-LOOP OPERATION With this submittal, the Supply System is requesting that the option for SLO be included as a necessary part of the WNP-2 operating license.

Should you have any questions, please contact Mr. P. L. Powell, Acting

Manager, WNP-2 Licensing.

Very truly yours, G.

C.

S

ensen, Acting Manager Nuclear Safety and Regulatory Programs PLP/tmh Enclosures cc:

R Auluck -

NRC WS Chin BPA A

Toth NRC Site

4 l

l