GO2-83-408, Responds to Re TMI Action Item II.K.3.18, Mods to ADS Sys Logic. One of Two Options (2 or 4) Will Be Implemented.Choice Based on Benefit to Design Impact on Schedule,Availability of Hardware & Analysis & Total Cost
| ML17277A571 | |
| Person / Time | |
|---|---|
| Site: | Columbia |
| Issue date: | 05/04/1983 |
| From: | Bouchey G WASHINGTON PUBLIC POWER SUPPLY SYSTEM |
| To: | Schwencer A Office of Nuclear Reactor Regulation |
| References | |
| RTR-NUREG-0892, RTR-NUREG-892 GO2-83-408, NUDOCS 8305100110 | |
| Download: ML17277A571 (4) | |
Text
l ~.
REGULATORY OORNATION DISTRIBUTION SYS'<
(RIBS)
/
AOCE'SSION NBR: 8305100110 DOC ~ DATE: 83/05/04 NOTARIZED; NO FACIL'.50"397 NPPSS Nuc 1 ear Proj ect
~ Unit '2~ Washington lpubl i c Powe "AUTH BYNAME AUTHOR AFFILIATION BOUCHEY<G..D, Nashington Public Power Supply System RECIP.NAME RECIPIENT AFFILIATION SCHWA'ENCER<A, Licensing Branch 2
DOCKET 05000397
SUBJECT:
Responds
.to 830013 1 tr r e TMI Action Item II,K~ 3 ~ 18 wi1 1 be implemented,"Mods to ADS Sys Logic ~,"
One of'.two options'2 or 9)based on evaluated benefi,t "to design impact on scheduleiavailability of hardware L analysis 8 total cost
~
DISTRIBUTION CODE:
B001S COPIES RECEIVED: LTR f ENCL g
SIZE:.. J.
TITLE: Licensing Submittal:
PSAR/FSAR Amdts 8, Related Correspondence' NOTES:
RECIPIENT ID CODE/NAME NRR/DL/ADL NRA LB2 LA INTERNAL: ELD/HDS2 IE/DEPER/EPB 36 XE/DEQA/QAB 21 NRR/DE/CEB 1i NRR/DE/EQB 13 NRR/DE/HGEB 30 NRR/DE/MTEB 17 NRA/DE/SGEB 25 NRR/DHFS/LQB 32 NRA/DSI/AEB 26 NRR/DSI/CPB 10 NRR/DSI/ICSB 16 NRR/DSI/PS&
19 NRR/DSI/RSB 23 RGN5 COPIES LTTR ENCL 1
0 1
0 1
0 3
3 1
1 1
2 2
1 1
1 2
2 1
1 1
1 i
1 1
1 1
3 3
RECIPIENT ID CODE./NAME NRR LB2 BC AULUCKgRN 01 IE FILE IE/DEPER/IRB 35 NRR/DE/AEAB NRR/DE/EHEB NRR/DE/GB 28 NRR/DE/MEB 18 NRR/DE/SAB 20 NRR/DHFS/HFEB40 NRR/DL/SSPB NRR/DSI/ASB NRR/DS I/CSB 09 NRR/DS I/METB 12 NRR DS I/RAB 22 G
00 AMI/MI8 COPIES LTTR ENCL 1
0 1
1 1
1 1
1 1
.0 1
1 2
2 1
1i 1
1 1
0 1
1 1
1 1
1 1
1 1
0 EXTERNAL'CRS 41 DMB/DSS (AMDTS)
LPOR 03 NSIC 05 6
6 BNL(AMDTS ONLY) 1 1
1 NRC PDR 02 1
1 NTIS 1
1 1
1 1
1 1
1
.TOTAL NUMBER OF COPIES REQUIRED:
L'TTR 54 ENCL 47
W M rl lrl Jl ff kr'I W
iffr 4 ~ g' i
)
fj f M f I,ff fj
)'
tj If lf fl MW rj1 4
W ff,rrr f g j Iff jf l I,'
M I I'4 I I rlk r ~ m~r>>
MMMM>>I>>=-MMMPpe
)jf)r)IMMWffjfff'ifkr)MMMM)jr II ll
>Jr flirt fill Mg 1'rk p
W il I,,
MMMI
Washington Public Power Supply System P.O. Box 968 3000 George Washington Way Richland, Washington 99352 (509) 372-5000 May 4,
- 1983, G02-83-408 Docket No. 50-397 Director of Nuclear Reactor Regulation Attention:
Mr. A. Schwencer, Chief Licensing Branch No.
2 Division of Licensing U.S. Nuclear Regulatory Commission Washington, D.C.
20555
Dear Mr. Schwencer:
Subject:
NUCLEAR PROJECT NO.
2 SAFETY EVALUATION REPORT, NUREG-0892, OUTSTANDING ISSUE 1.7(9),
MODIFICATIONS TO ADS SYSTEM LOGIC
Reference:
- Letter, A. Schwencer (NRC) to R. L. Ferguson (SS),
"NRC Staff Evaluation of the BWR Owners'roup
Response
to TMI Action Plan Item II.K.3.18,"
Dated April 13, 1983 The reference letter provides the NRC staff position regarding implementation of design changes to the existing ADS system to preclude the need for manual actuation during certain events to ensure adequate core cooling.
In addition, the letter requests a Supply System response to this evaluation by May 6, 1983.
The Supply System commits to implementation of one of the two approved options (2 or 4) on the WNP-2 Plant.
Plans are to base the option selection process on evaluated benefit to the overall ADS system design, impact on schedule, avai 1-ability of hardware and analysis, and total cost of implementation.
Details regarding the change, including the option selected and implementation
- schedule, wi 11 be provided upon completion of the decision process.
With submittal of this letter, the Supply System considers that it has satisfied the Commission's requirements included in the Reference.
Very truly yours,
~ G.
D. Bouchey
- Manager, Nuclear Safety and Regulatory Programs RLW:CMP:lp 8305100110 830504