GO2-83-102, Forwards Rev 2 to Pump & Valve Inservice Test Program Plan & 21 Oversize Drawings
| ML17277B078 | |
| Person / Time | |
|---|---|
| Site: | Columbia |
| Issue date: | 11/04/1983 |
| From: | Sorensen G WASHINGTON PUBLIC POWER SUPPLY SYSTEM |
| To: | Schwencer A Office of Nuclear Reactor Regulation |
| Shared Package | |
| ML17277B080 | List:
|
| References | |
| GO2-83-1024, NUDOCS 8311300333 | |
| Download: ML17277B078 (4) | |
Text
SUBJECT:
Forwards Rev 2 to pump
& valve inservice test program plan
& 21 oversize drawings.
~PS'-~%3 DISTRIBUTION CODE:
0001 COPIES ECEIVED:LTR ENCL SIZE:S.
TITLE: Licensing Submittal:
PSAR/FSAR Amdts
& Related Correspondence BOOTES:
~% C~+WWW~
REC IP IENT RECIPIENT COPIES ID CODE/NAME ID CODE/NAME LTTR'NCL NRR/DL/ADL.
NRR LB2 LA AULUCKgR~
01 1
1 COPIES LTTR ENCL 1
0 1
0 REGULATORY I RMATION DISTRIBUTION SYS1 (RIDS)
'ACCESSION. NBR:8311300333 DOC DATE: 83/11/04 NOTARIZED:
NO DOCKET FACIL:50 397 NPPSS Nuclear Pr ojecti Unit 2i Nashington Public Powe 05000397 AUTH BYNAME AUTHOR AFFILIATION SORENSENiG,C.
Hashington Public Power Supply System RECIP ~ NAME RECIPIENT AFFILIATION SCHNENCERiA, Licensing Branch 2
INTERNAL: ELD/HDS2 IE/DEPER/EPB 36 IE/DEQA/GAB 21 NRR/DE/CEB 11 NRR/DE/EQB 13 NRR/DE/MEB 18 NRR/DE/SAB 20 NRR/DHFS/HF EBrl 0 NRR/DHFS/PSRB NRR/DS I/AEB 26 NRR/DSI/CPB 10 NRR/DSI/ICSB 16 NRR/DSl/PSB 19 NRR/DS I/RSB 23 RGN5 1
0 3
3 1
1 1
2 2
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 3
3 IE F ILE IE/DEPER/IRB 35 NRR/DE/AEAB NRR/DE/EHEB NRR/DF/GB '8 NRR/DE/MTEB 17 NRR/DE/SGEB 25 NRR/DHFS/LQB 32 NRR/DL/SSPB NRR/DS IIASB NRR/DSI/CSB 09 NRR/DS I/METB 12 NRR D
AB 22 0rl MIB 1
1 1
1 1
0 1
1 2
2 1
1 1
1 1
1 1
0 1
1 1
1 1
1 1
1 1
0 EXTERNAL: ACRS rl ]
DMS/DSS
('AMDTS)
LPDR 03 NSIC 05 6
6 BNL(AMDTS ONLY) 1 1
1 NRC PDR 02 1
1 NTIS "1
1 1
1 1
1 TOTAL NUMBER OF COPIES REQUIREDe LTTR 53 ENCL 46
W It e "I W
,I y ~II r
tl 44 ij I ttl 44 4,
Wtl 1
It
Washington Public Power Supply System P.O. Box 968 3000 George Washington Way Richland, Washington 99352 (509) 372-5000 November 4, 1983 G02-83-1024 Docket No. 50-397 Director of Nuclear Reactor Regulation Attention:
Mr. A. Schwencer, Chief Licensing Branch No.
2 Division of Licensing U.S. Nuclear Regulatory Commission Washington, D.C.
20555
Dear Mr. Schwencer:
Subject:
NUCLEAR PROJECT NO.
2 PUMP AND VALVE INSERVICE TEST PROGRAM PLAN UPDATE The Supply System has recently revised the WNP-2 Pump and Valve Inservice Test (PVT) Program Plan.
This revision (Revision 2) of the program plan incorporates the latest design and as-built information available as of October 25, 1983 and thus provides added assurance of material quality and public safety.
The Supply System has been informed that neither the original version nor revision 1 to the PVT Program Plan has been reviewed by the NRC.
The Supply System, therefore, respectful.ly requests that revision 2 of the WNP-2 PVT Program Plan be reviewed and approved for imple-mentation in conjunction with the issuance of the WNP-2 operating license.
Enclosed for NRC review and approval are sixty (60) copies of Revision 2 of the WNP-2 PVT Program Plan and seven (7) copies of full-size blue lines of each applicable drawing.
Should you have any further questions, please contact Mr. P. L. Powell,
- Manager, WNP-2 Licensing.
Very truly yours, G.
C.
- orensen, Manager Regulatory Programs RPW/tmh Attachments cc:
R Auluck -
NRC Site J
Page -
NRC
,.<~,:-, BSlXSO0SSS Sslloe
~
l
,'['-",'DR ADOCK 05000397
"..*;~
PDR pl@
'g4
~ @
~QUAL Ai>
j
I
'I C
I v'
~
V 1