GO2-83-007, Forwards Rev 0 to Visual Exam Acceptance Criteria for Reverification Insp of Welded Structures
| ML17277A433 | |
| Person / Time | |
|---|---|
| Site: | Columbia |
| Issue date: | 01/17/1983 |
| From: | Bouchey G WASHINGTON PUBLIC POWER SUPPLY SYSTEM |
| To: | Schwencer A Office of Nuclear Reactor Regulation |
| Shared Package | |
| ML17277A434 | List: |
| References | |
| GO2-83-007, GO2-83-7, NUDOCS 8302090401 | |
| Download: ML17277A433 (4) | |
Text
REGULATORY ORMATION DISTRIBUTION SY
<l (RIDS)
ACUTE'SSION NBRe8302090401 DOC ~ DATE: 83/01/17 NOTARIZED:
NO DOCKET FACIL:50 397 WPPSS Nuclear Projecti Uni t 2< Washington )Public Powe 05000397 AUTH BYNAME AUTHOR AFFILIATION BOfJCHEY>G ~ DE Washington.Public Power Supply 'System RECIP ~ NAME RECIPIENT AFFILIATION SCHhENCERiA, Licensing Branch 2
SUBJECT:
For wards Rey 0 to "Visual Exam Acceptance Criteria for Reverification Insp of Welded Structures,,"
DISTRIBUTION CODE:
B001S COPIES 'RECEIVED:LTR ENCL.4 SI E:
f I
+
TITLE: Licensing Submittal: iPSAR/FSAR Amdts 8 Related Correspondence NOTES:
RECIPIENT ID CODE/NAME NRR/DL/ADL NRR LB?. LA INTERNAL: ELD/HDS2 IE/DEP EPOS 35 NRR/DE/AEAB NRA/DE/EQB 13 NRR/DE/HGEB 30 NRR/DE/MTEB 17 NRA/DE/SAB 24 NRR/DHFS/HFEB00 NRR/DL/SSPB NRR/DSI/ASB NRR/DS I/CSB 09 NRA/DSI/METB 12 AB
?2 EG FILE 04 I
IB EXTERNALS ACRS 41 DMB/DSS (AMDTS)
LPDR 03 NSIC 05
'COPIES LTTR ENCL 1
0 1
0 1
0 1
1 i
0 2
2 1
1 1
1 1
1 0
1 1
1 1
1 1
1 1
0 6
6 1
1 1
1 RECIPIENT ID CODE/NAME NRR LB2 BC AULUCKgR~
01 IE FILE-IE/DEP/EPLB 36 NRR/DE/CEB 11 NRR/DE/GB 28 NRR/DE/HEB 18 NRR/DE/QAB 21 NRR/DE/SEB 25 NRR/DHFS/LQB 3?
NRR/DS I/AEB 26 NRR/DS I/CPS 10 NRR/DSI/ICSB 16 NRR/DSI/PSB 19 NRR/DSI/RSB 23 RGN5 BNL(AMDTS ONLY)
FEMA REP DIV 39 NRC PDR 62 NTIS COPIES LTTR ENCL 0
1 1
1 1
3 3
2 2
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 3
3 TOTAL NUMBER OF COPIES REQUIRED:
LTTR 5?.
ENCL 05
rig g i
lll rrrv g
R r, I r, I'I r TI i
Pi gg f Irrr W
~
<Wi fgrl iW rira
'A lr W
', Iiir rl w,w r;
ilr,,rr, W
I
> r, ff
~i'll ti JI p
W "Irr rl i y li I
W o
r M
1 r>
r A
Wr Wl I
r e
,)
Washington Public Power Supply System P.O. Box 968 3000 George Washington Way Richland, Washington 99352 (509) 372-5000 Januaryt7, 1983 G02-83-007 Director of Nuclear Reactor Regulation Attention:
Mr. A. Schwencer, Chief Licensing Branch No.
2 Division of Licensing U. S. Nuclear Regulatory Commission Washington, D.
C.
20555
Subject:
NUCLEAR PROJECT NO.
2 WNP-2 PROJECT VISUAL EXAMINATION ACCEPTANCE CRITERIA FOR REVERIFICATION INSPECTION OF WELDED STRUCTURES (QVI-09, REV. 0)
During a reinspection of structural steel and miscellaneous metal welds, certain exceptions were taken to AWS Dl.l.
These exceptions are described in the attached report, QVI-09, and referenced in the WNP-2 FSAR, Page 3.8-190.
Very truly yours, G.
D. Bouchey, Manager Nuclear Safety and Regulatory Programs sm Attachment cc: