GO2-82-936, Responds to NRC Re Resolution of Licensing Review Group II Issue 3-CPB Concerning Channel Box Deflection.Util Channel Mgt Program for Facility Discussed
| ML17276B734 | |
| Person / Time | |
|---|---|
| Site: | Columbia |
| Issue date: | 11/19/1982 |
| From: | Bouchey G WASHINGTON PUBLIC POWER SUPPLY SYSTEM |
| To: | Schwencer A Office of Nuclear Reactor Regulation |
| References | |
| GO2-82-936, NUDOCS 8211290279 | |
| Download: ML17276B734 (6) | |
Text
EYlg t:
REGULATORY FORMATION DISTRIBUTION S EM (RIDS)
ACCES lION NBR: 8211290279 DOC DATE: 8?/11/19 NOTARIZED:
NO DOCKET
'FACIL:50 397 WPPSS Nuclear Projecti Unit 2I Washington Public Powe 05000397 AUTH BYNAME AUTHOR AFFILIATION BOUCHEY<G.D, Washington Public Power Supply System RECIP,NAME RECIPIENT AFFILIATION SCHhENCEREA.
Licensing Branch 2
SUBJECT:
Responds to NRC 880922 ltr re resolution of Licensing Review Group II Issue 3"CPU concerning channel box deflection, Util channel mgt program for facility discussed, DISTRIBUTION CODE:
BOO IS COPIES RECEIVED:LTR ENCL l.
SIZE; TITLE: Licensing Submittal:
PSAR/FSAR Amdts 8 Related Correspondence NOTES:
RECIPIENT ID CODE/NAME'RR/DL/ADL NRR L82 LA
'NTERNAL: ELD/HDS2 IE/DEP EPOS 35 NRR/DE/AEAB NRR/DE/EQB 13 NRR/DE/HGEB 30 NRR/DE/MTEB 17 NRR/DE/SAB 2A NRR/DHFS/HFEB<l0 NRR/DHFS/OLB 3W NRR/DS I/AEB 26 NRR/DS I/CSB 09 NRR/DSI/METB 12 NRR/DSI/RAB 22 04 MI/MIB EXTERNAL: ACRS 41 DMB/DSS (AMDTS)
LPDR 03 NSIC 05 COPIES LTTR ENCL 1
0 1
0 1
0 1
1 0
2 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
0 6
1 1
1 1
1 1
RECIPIENT ID CODE/NAME NRR L82 BC AULUCKER~
01 IE FILE IE/DEP/EPLB 36 NRR/DE/CEB 11 NRR/DE/GB 28
NRR/DE/MEB 18 NRR/DE/QAB 21 NRR/DE/SEB 25 NRR/DHFS/LQB 32 NRR/DL/SSPB NRR/DS I/CPB 10 NRR/DS I/ICS8 16 NRR/DS I/PSB 19 NRR/DS I/RSB 23 RGN5 BNL(AMDTS ONlY)
FEMA REP DIV 39 NRC PDR 02 NTIS COPIES LTTR ENCL 0
1 1
1 1
3 3
1 2
?
1 1
1 1
1 1
1 1
1 0
1 1
1
.1 1
1 1
1 3
3 TOTAL NUMBER OF COPIES REQUIRE,D:
LTTR 5?
ENCL 45 yhl
"k 1 rl)kp i
'j)t 1
jf )1 jt tl k
t f f Rjl
'P k
Rp),WWRl,g>>t'pr'h
~
~
>>,jj,t krp>> r f f f t
~ Kkt>>5 Pj 'f P
~
N Pk '
'>>p
'P't rr '>> II
'WN lpjf I
p'pr N
II, r-r R
'1 k tr RK -:. M~ O~
K) 3 '
I '-u>>k&
)7(1 lll Kt WRP I
Ii IR N p,", WRRRN
7 W jP,)
R,p " J K I p I P t
j
..., I
~
rig I) l P) t IW1 Iu 1
R li-p R
j NR
)I Ft 4
R
)
t
)t)
') 1 R
i,,'g uu
')
I
'l I'pg f l)R ~RR pp I~
'I K
II l
I l
P k l)$
R pu I k
K
Washington Public Power Supply System P.O. Box 968 3000 George Washington Way Richland, Washington 99352 (509) 372-5000 Docket No. 50-397 November 19, 1982 G02-82-936 Mr. A. Schwencer, Chief Licensing Branch No.
2 Division of Regulation U.S. Nuclear Regulatory Commission Washington, D.C.
20555
Dear Mr. Schwencer:
Subject:
RESOLUTION OF LRG-II CHANNEL BOX DEFLECTION ISSUE
Reference:
NRC Letter, A. Schwencer (NRC) to RL Ferguson (SS),
"Resolution of LRG-II Channel Box Deflection Issue (LRG-II Issue 3-CPB)," dated September 22, 1982.
In the referenced letter, you requested that we respond as soon as possible on the channel box deflection issue for l<NP-2 in order that this item be resolved.
The Supply System has initiated a channel management program for WNP-2.
The elements of this program include:
~
Compiling complete operating history records for each channel.
Data to be collected include channel location, orientation of welded sides, exposure and control history.
~
Compiling complete analytical history records for each channel including fast fluence
(>1 MeV), and flux gradient history.
~
Measurement of post-operation channel box deflection.
The Supply System is planning to measure channel box deflection after each
'efueling outage for selected channels which are discharged to the spent fuel pool.
The reuse of discharged channels'ill be determined based upon these measurements as compared to predetermined criteria.
Other items which will be addressed in this program include development of channel manufacturing history data and analytical prediction capability.
1'
I Mr. A. Schwencer Page Two November 19, 1982 G02-82-936 The Channel Management Program has already resulted in some potential improvement in channel operation.
Data from Commonwealth Edison measure-ments which recently became available indicate that major channel bow may be a strong function of channel manufacturing history rather than location of the channel within the core.
Their data indicate that prime candidates for channel bow are manufactured from mismatched halves.
This means that the channel was manufactured from two pieces of stock material not from the same original material batch.
Also, Commonwealth Edison channels which experienced major bow, in many cases, were never on the core periphery.
Based on this information, the Supply System has identified which of the NNP-2 channels are manufactured from mismatched halves (75 out of 764) and we have set up special plans to manage the use of these channels to minimize potential channel bow.
These measures include taking advantage of core locations which are not adjacent to control blades and, in addition, identification of locations of minimal exposure and fast flux tilt.
In addition to the above channel management
- program, the Supply System is proposing to take a number'of operational actions to monitor channel dis-tortion in the core.
Prior to startup after each reload, scram time testing and rod notch testing will be performed.
For rods which fail the above
- test, the pressure test described in NEDE-21354-P (4.4.2) will then be performed.
Very truly yours, G.
D. Bouchey (MD 370)
- Manager, Nuclear Safety 6 Licensing lfCi0:jms cc:
R. Auluck - NRC NS Chin - BPA R. Feil - NRC-Site
4 0
'I