Text
P S
Washington Public Power Supply System A JOINT OPERATING AGENCY P. O. BOX 958 3000 GaO, WASnlNOtON W*Y R>CSLaNO, WASHINOrON 99353 PHONL'509) 375 5000 November 30, 1979 G02-79-212 Nuclear Regulatory Commission Region V
Office of Inspection and Enforcement Suite 202, Walnut Creek Plaza 1900 North California Boulevard Walnut Creek, CA 94596 Attention:
Mr.
R.
H. Engelken, Director
Subject:
WPPSS NUCLEAR PROJECT NO.
2 DOCKET NUMBER 50-397 REPORTABLE DEFICIENCY - 10CFR50.55 e
4 PEcEIv[0 OEC 5 1979
/]
6 Ot
References:
Letter G02-79-191 from D. L. Renberger to R.
H. Engelken dated October 18,
- 1979, same subject
Dear Mr. Engelken:
The referenced letter documented a reportable condition in accordance with the provisions of 10CFR50.55(e) involving the WNP-2 spent fuel pool cooling system.
The letter.also included an interim report of the deficiency.
The final report of action being taken to correct this condition is attached.
Please contact us if you have additional questions.
Very t~ruly yours, D. L.
RENBERGEk Assistant Director Technology DLR:TRM:cd attachment:
as stated CC:
JM Blas -
B&R w/att JJ Verderber - B&R w/att RE Snaith B&R w/att JR Lewis. BPA w/att JG Davis, Director, NRC, Washington, D.C., w/att RC Root -
B&R Site w/att MJ Parise - B&R Site w/att WNP-2 files w/att GT Harper -
B&R Site w/att