Scott A. Vance Vice President, Corporate Governance and General Counsel P.O. Box 968, MD PE13 Richland, WA 99352-0968 Ph. 509.377-4650 l F. 509.372.5330 savance@energy-northwest.com GO2-25-076 U.S. Nuclear Regulatory Commission Document Control Desk Washington, D.C. 20555

Subject:

COLUMBIA GENERATING STATION, DOCKET NO. 50-397 2024 ENVIRONMENTAL OPERATING REPORT

Dear Sir or Madam:

This letter is submitted pursuant to Section 5.4.1 of the Columbia Generating Station (CGS)

Environmental Protection Program (EPP), Appendix B to the Facility Operating License No.

NPF-21, which requires Energy Northwest (EN) to submit an Annual Operating Report for the EPP to the U.S. Nuclear Regulatory Commission (NRC) for the prior calendar year.

There was no instance of EPP noncompliance and no change in station design or operation, tests, or experiments that involved an unreviewed environmental question.

On March 6, 2024, there was a malfunction to the halogenation/dehalogenation system resulting in a total residual halogen (TRH) exceedance to the 0.1 mg/L TRH limit established in the stations National Pollutant Discharge Elimination System (NPDES) permit WA0025151.

This event resulted in a nonroutine report pursuant to 10 Code of Federal Regulations (CFR)

§ 50.72(b)(2)(xi), which was completed on March 7, 2024: NRC Notification Event Number 57013.

On September 10, 2024, CGS determined that no more than 30 gallons of silicone oil was inadvertently discharged into the plant service water system due to a failed heat exchanger on a plant installed air compressor. While no visible oil sheen was discovered, this oil leak had a potential to reach the Columbia River via the circulation water basin blowdown line. This event resulted in a nonroutine report pursuant to 10 CFR § 50.72(b)(2)(xi), which was completed on September 10, 2024: NRC Notification Event Number 57314.

  



 



 



April 30, 2025 ENERGY NORTHWEST

GO2-25-076 Page 2 of 2 On September 18, 2024, CGS identified a potential release of lubricating oil into the plant service water system and notified the Washington State Energy Facility Site Evaluation Council and the Washington State Department of Ecology. However, after thorough troubleshooting, EN determined that no oil entered the plant service water system or the Columbia River. This event resulted in a nonroutine report pursuant to 10 CFR § 50.72(b)(2)(xi), which was completed on September 18, 2024: NRC Notification Event Number 57329 and subsequently retracted on October 10, 2024.

A summary of the monthly Discharge Monitoring Report data submitted to the Washington State Department of Ecology as a requirement of the CGS NPDES permit WA0025151 is provided in the

Attachment:

Summary of Discharge Monitoring Reports.

There are no commitments being made to the NRC by this letter. If you have any questions or require additional information, please contact Mr. C. Plager at (509) 308-2326.

Respectfully, Scott A. Vance Vice President, Corporate Governance and General Counsel

Attachment:

Summary of Discharge Monitoring Reports cc:

NRC Region IV Administrator NRC NRR Project Manager NRC Sr. Resident Inspector SAV/lw

  



 



 



[

DocuSigned by:

c5ff14__

D58EB9055F2F498...

GO2-25-076 Attachment 2024 ENVIRONMENTAL OPERATING REPORT Page 1 of 1 COLUMBIA GENERATING STATION 2024 COOLING WATER

SUMMARY

OF DISCHARGE MONITORING REPORTS Month Days of Discharge pH Total Residual Halogen (mg/L)

Maximum Total (ug/L)

Discharge Volume (Millions of gallons/day)

Heat Load (kcal/day)

Monthly Average (f)

Low High Copper (c) Chromium (d)

Zinc (e)

Average (a)

Maximum (b)

Jan 31 7.8 8.7

<0.1 1.07 13.2 2.6 3.2 Feb 28 7.7 8.8

<0.1 1.06 16.6 2.5 3.1 Mar 31 7.7 8.4 1.06

<1.0 15.2 2.6 3.0 Apr 30 7.5 8.5

<0.1 1.16 14.3 2.8 3.2 May 31 7.6 8.0

<0.1 1.38 13.7 2.7 3.0 Jun 29 7.4 8.2

<0.1 1.78 15.5 2.6 5.0 2.56e+008 July 31 7.5 8.0

<0.1 1.54 15.9 4.9 5.0 5.61e+008 Aug 31 7.7 8.5

<0.1 1.41 11.5 4.2 4.7 4.72e+008 Sep 28 7.6 8.4

<0.1 1.34 8.7 3.3 4.3 3.62e+008 Oct 31 7.8 8.2

<0.1 2.21 15.2 2.6 2.9 2.55e+008 Nov 30 7.8 8.3

<0.1 2.06 17.8 2.0 2.3 Dec 31 7.8 8.3

<0.1 2.35 26.8 2.2 2.3 Permit Limit 6.5 9.0 0.1 (c)

(d)

(e) 5.6 9.4 1.27e+009 (a) Average daily discharge for the month.

(b) Maximum daily discharge for the month.

(c) No permit limit for copper.

(d) Chromium limits are: 8.2 ug/L monthly average, 16.4 ug/L daily maximum.

(e) Zinc limits are: 53 ug/L monthly average, 107 ug/L daily maximum.

(f) Heat Load (June through October only) limit: 1.27e+009 kilocalories per day (kcal/day) monthly average.

  



 



 



I I