MONTHYEARGO2-24-109, Summary of Changes and Analysis for Revision 42 of Plant Procedures Manual 13.8.1, Emergency Dose Projection System Operations2024-11-0404 November 2024 Summary of Changes and Analysis for Revision 42 of Plant Procedures Manual 13.8.1, Emergency Dose Projection System Operations GO2-24-110, Summary of Changes and Analysis for Revision 45 of Plant Procedures Manual 13.4.1, Emergency Notification2024-11-0404 November 2024 Summary of Changes and Analysis for Revision 45 of Plant Procedures Manual 13.4.1, Emergency Notification GO2-24-088, Supplement to Response to Request for Additional Information Regarding License Amendment Request to Revise Columbia Emergency Plan2024-09-24024 September 2024 Supplement to Response to Request for Additional Information Regarding License Amendment Request to Revise Columbia Emergency Plan GO2-24-051, Application to Revise Technical Specifications to Adopt TSTF-592, Revise Automatic Depressurization System (ADS) Instrumentation Requirements2024-09-23023 September 2024 Application to Revise Technical Specifications to Adopt TSTF-592, Revise Automatic Depressurization System (ADS) Instrumentation Requirements GO2-24-082, Response to Request for Additional Information Regarding License Amendment Request to Revise Columbia Emergency Plan2024-09-10010 September 2024 Response to Request for Additional Information Regarding License Amendment Request to Revise Columbia Emergency Plan GO2-24-060, Reply to a Notice of Violation, EA-21-170 and EA-23-0542024-07-30030 July 2024 Reply to a Notice of Violation, EA-21-170 and EA-23-054 GO2-24-070, Response to Request for Additional Information Regarding Fifth Interval Inservice Testing Program2024-07-29029 July 2024 Response to Request for Additional Information Regarding Fifth Interval Inservice Testing Program GO2-24-063, Notification of Extension to Columbias Fourth 10-Year Interval Inservice Testing Program Plan2024-07-15015 July 2024 Notification of Extension to Columbias Fourth 10-Year Interval Inservice Testing Program Plan GO2-24-057, Notice of Readiness for Supplemental Inspection2024-06-19019 June 2024 Notice of Readiness for Supplemental Inspection GO2-24-056, Relief Request for the Columbia Generating Station Fourth Ten-Year Interval Inservice Testing2024-06-11011 June 2024 Relief Request for the Columbia Generating Station Fourth Ten-Year Interval Inservice Testing GO2-24-049, 2023 Annual Radiological Environmental Operating Report2024-05-13013 May 2024 2023 Annual Radiological Environmental Operating Report GO2-24-050, Annual Environmental Operating Report2024-04-30030 April 2024 Annual Environmental Operating Report GO2-24-042, 2023 Annual Radioactive Effluent Release Report2024-04-22022 April 2024 2023 Annual Radioactive Effluent Release Report GO2-24-044, Voluntary Response to Regulatory Issue Summary 2024-012024-04-11011 April 2024 Voluntary Response to Regulatory Issue Summary 2024-01 GO2-24-034, Supplement to License Amendment Request to Revise Columbia Generating Station Emergency Plan2024-03-20020 March 2024 Supplement to License Amendment Request to Revise Columbia Generating Station Emergency Plan GO2-24-041, Level of Financial Protection - Annual Reporting Requirement2024-03-12012 March 2024 Level of Financial Protection - Annual Reporting Requirement GO2-24-039, Report of Changes or Errors in Emergency Core Cooling System Loss of Coolant Accident Analysis Models Pursuant to 10 CFR 50.462024-03-11011 March 2024 Report of Changes or Errors in Emergency Core Cooling System Loss of Coolant Accident Analysis Models Pursuant to 10 CFR 50.46 GO2-24-036, Presentation Information for Pre-Application Meeting Regarding Columbia’S Replacement Steam Dryer Evaluation Approach for Extended Power Uprate2024-03-11011 March 2024 Presentation Information for Pre-Application Meeting Regarding Columbia’S Replacement Steam Dryer Evaluation Approach for Extended Power Uprate GO2-24-004, License Amendment Request to Revise Emergency Plan2024-01-30030 January 2024 License Amendment Request to Revise Emergency Plan GO2-24-003, Relief Requests for the Columbia Generating Station Fifth Ten-Year Interval Inservice Testing2024-01-29029 January 2024 Relief Requests for the Columbia Generating Station Fifth Ten-Year Interval Inservice Testing GO2-24-014, Independent Spent Fuel Storage Installation, Supplement to Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2024-01-15015 January 2024 Independent Spent Fuel Storage Installation, Supplement to Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation GO2-24-005, Docket No. 50-397 Supplement to Reply to a Notice of Violation; EA-21-1702024-01-0808 January 2024 Docket No. 50-397 Supplement to Reply to a Notice of Violation; EA-21-170 GO2-23-136, Guarantee of Payment of Deferred Premium2023-12-20020 December 2023 Guarantee of Payment of Deferred Premium GO2-23-135, Notice of Readiness for Supplemental Inspection2023-12-14014 December 2023 Notice of Readiness for Supplemental Inspection GO2-23-130, Reply to a Notice of Violation; EA-23-0542023-12-14014 December 2023 Reply to a Notice of Violation; EA-23-054 GO2-23-105, Licensing Basis Document Update and Biennial Commitment Change Report2023-12-12012 December 2023 Licensing Basis Document Update and Biennial Commitment Change Report GO2-23-107, Application to Revise Technical Specifications to Adopt TSTS-584, Eliminate Automatic RWCU System Isolation on SLC Initiation2023-12-0505 December 2023 Application to Revise Technical Specifications to Adopt TSTS-584, Eliminate Automatic RWCU System Isolation on SLC Initiation GO2-23-126, Docket No. 50-397 Voluntary Response to Regulatory Issue Summary 2023-012023-11-28028 November 2023 Docket No. 50-397 Voluntary Response to Regulatory Issue Summary 2023-01 GO2-23-121, Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-11-27027 November 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation GO2-23-097, In-Service Inspection Summary Report for the Twenty-Sixth Refueling Outage (R26)2023-09-0606 September 2023 In-Service Inspection Summary Report for the Twenty-Sixth Refueling Outage (R26) GO2-23-100, Technical Specification Section 5.6.4 Post Accident Monitoring Instrumentation 14-Day Report for Inoperable Suppression Pool Level Indication2023-08-31031 August 2023 Technical Specification Section 5.6.4 Post Accident Monitoring Instrumentation 14-Day Report for Inoperable Suppression Pool Level Indication GO2-23-056, Application to Revise Technical Specifications to Adopt TSTF-230, Add New Condition B to LCO 3.6.2.3, RHR Suppression Pool Cooling2023-08-29029 August 2023 Application to Revise Technical Specifications to Adopt TSTF-230, Add New Condition B to LCO 3.6.2.3, RHR Suppression Pool Cooling GO2-23-093, Supplement to Reply to a Notice of Violation: EA-21-1702023-07-27027 July 2023 Supplement to Reply to a Notice of Violation: EA-21-170 GO2-23-068, Notification of Completion of Commitments Required Prior to Entry Into the Period of Extended Operation2023-07-19019 July 2023 Notification of Completion of Commitments Required Prior to Entry Into the Period of Extended Operation GO2-23-090, Reply to a Notice of Violation2023-07-12012 July 2023 Reply to a Notice of Violation GO2-23-073, Notification of NPDES Permit Issuance2023-06-26026 June 2023 Notification of NPDES Permit Issuance GO2-23-072, Cycle 27 Core Operating Limits Report2023-06-0505 June 2023 Cycle 27 Core Operating Limits Report GO2-23-055, Independent Spent Fuel Storage Installation, 2022 Annual Radiological Environmental Operating Report2023-05-15015 May 2023 Independent Spent Fuel Storage Installation, 2022 Annual Radiological Environmental Operating Report GO2-23-006, License Amendment Request to Clean-Up Operating License and Appendix a Technical Specifications2023-05-0101 May 2023 License Amendment Request to Clean-Up Operating License and Appendix a Technical Specifications GO2-23-053, 2022 Annual Environmental Operating Report2023-04-26026 April 2023 2022 Annual Environmental Operating Report GO2-23-057, 2022 Annual Radioactive Effluent Release Report2023-04-25025 April 2023 2022 Annual Radioactive Effluent Release Report GO2-23-012, Application to Revise Technical Specifications to Adopt Tstf-541, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position2023-03-27027 March 2023 Application to Revise Technical Specifications to Adopt Tstf-541, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position GO2-23-038, Plant Decommissioning Fund Status Report2023-03-15015 March 2023 Plant Decommissioning Fund Status Report GO2-23-041, Generation Station - Level of Financial Protection - Annual Reporting Requirement2023-03-15015 March 2023 Generation Station - Level of Financial Protection - Annual Reporting Requirement GO2-23-034, Report of Changes or Errors in Emergency Core Cooling System Loss of Coolant Accident Analysis Models Pursuant to 10 CFR 50.462023-03-13013 March 2023 Report of Changes or Errors in Emergency Core Cooling System Loss of Coolant Accident Analysis Models Pursuant to 10 CFR 50.46 GO2-23-035, Supplement to License Amendment Request to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling2023-03-0909 March 2023 Supplement to License Amendment Request to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling GO2-23-019, Emergency Plan - Summary of Changes and Analysis for Revision 68 of the EP-012023-02-0808 February 2023 Emergency Plan - Summary of Changes and Analysis for Revision 68 of the EP-01 GO2-22-131, Guarantee of Payment of Deferred Premium2022-12-19019 December 2022 Guarantee of Payment of Deferred Premium GO2-22-122, Response to Request for Additional Information Related to License Amendment Request to Adopt TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b2022-11-28028 November 2022 Response to Request for Additional Information Related to License Amendment Request to Adopt TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b GO2-22-076, Status of License Renewal Commitments2022-10-31031 October 2022 Status of License Renewal Commitments 2024-09-24
[Table view] |
Text
Alex L. Javorik P.O. Box 968, PE23 NORTHW ESTRichland, WA 99352-0968 Ph. 509-377-8555 F. 509-377-2354 aljavorik@ energy-northwest.com April 23, 2012 G02-12-064 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555-0001
Subject:
COLUMBIA GENERATING STATION, DOCKET NO. 50-397 RESPONSE TO NRC INFORMATION REQUEST, LICENSE RENEWAL APPLICATION
References:
- 1) Letter, G02-10-011, dated January 19, 2010, WS Oxenford (Energy Northwest) to NRC, "License Renewal Application"
- 2) Letter dated January 28, 2011, SK Gambhir (Energy Northwest) to NRC, "Response to Request for Additional Information License Renewal Application," (G02-11-031)
- 3) Letter dated November 16, 2011, Al Javorik (Energy Northwest) to NRC, "Response to Request for Additional Information License Renewal Application," (G02-11-185)
Dear Sir or Madam:
By Reference 1, Energy Northwest requested the renewal of the Columbia Generating Station (Columbia) operating license. Via reference 2 Energy Northwest submitted Amendment 28 to the Columbia License Renewal Application (LRA) which provided amended pages for the FSAR supplement related to Upper Shelf Energy (USE). Per a recent telephone conversation with the NRC staff, Energy Northwest noted that the wording provided in Amendment 28 required revision to clarify the discussion on USE.
Per the request of the NRC staff this revised wording is provided in the attached Amendment 53.
Additionally, based on recent conversations with NRC staff, information provided under Amendment 48 submitted via reference 3 requires clarification. The clarification is also provided in Amendment 53 attached to this letter.
RESPONSE TO NRC INFORMATION REQUEST LICENSE RENEWAL APPLICATION Page 2 of 2 contains Amendment 53 to the Columbia License Renewal Application. No new or revised commitments are included in this letter.
If you have any questions or require additional information, please contact John Twomey at (509) 377-4678.
I declare under penalty of perjury that the foregoing is true and correct. Executed on the date of this letter.
Respectfully, AL Javorik Vice President, Engineering
Enclosure:
License Renewal Application Amendment 53 cc: NRC Region IV Administrator NRC NRR Project Manager NRC Senior Resident Inspector/988C EFSEC Manager RN Sherman - BPA/1 399 WA Horin - Winston & Strawn AD Cunanan - NRC NRR (w/a)
MA Galloway - NRC NRR RR Cowley - WDOH
RESPONSE TO NRC INFORMATION REQUEST LICENSE RENEWAL APPLICATION Enclosure Page 1 of 1 LICENSE RENEWAL APPLICATION AMENDMENT 53 Section Page RAI Number Number Number A.1.3.1.2 A-29 Editorial B.2.5 B-40 Editorial
Columbia Generating Station A. 1.3.1.2 Upper Shelf Energy Evaluation I License Renewal Application Technical Information JAdditionally, a All.e.. pI.-.Jted USE values for thoveo, be..line plates and welds for wh,*h the initial USE is known remnain above 50 ft Ibs through the end of Mhc pcrivd of extended opcrntion (54 EFPY). For the vessel b-"tlin plates - and welds few which the initial USE A pecific 54 Iý
...
F.-.."F.. ...
I I%.JL ILJVVII ,
.
-~ ..
...
I-^..
....
1.11 A . . I... . ; '" "r .....
'J..s WO
....
U11 AP 6.1 N* H.. n
~oUiaiII1va 44*;-
..
VuIIlIlu
.
~U5~
. . .4 Z----.---.
J EFPY equivalent
-de......se the. ....... equivalentmargin"
......
dccrcacc in USE Wor 64 EFPY fr these b"ltline plates and welds ar,e bounded b, t analyases Th.- .. ....ur predica
/ /I margins /!
analysis will and w,.elds *9 neeenartble fe the oeried of PW'PtCndod anorationn wr,. ............ r* ..... V be performed Disposition ,er Replace with Insert A from Page A-29a.
for N12 nozzle eshelf energy TLAAs have been projected to the end of the period forgings prior of extended operation __. for all reactor vessel beltline materials. *1 to the period of extend A.1.3.1.3 Adjusted Reference Temperature Analysis operation. All In addition to USE, the other key parameter that characterizes the fracture toughness of Qth@rr --:ar-tQr a material is the RTNDT. This reference temperature changes as a function of exposure to neutron radiation resulting in an adjusted reference temperature, ART.
The initial RTNDT is the reference temperature for the unirradiated material. The change due to neutron radiation is referred to as ARTNDT. The ART is calculated by adding the initial RTNDT, the ARTNDT, and a margin to account for uncertainties as prescribed in nozzle Regulatory Guide 1.99, Revision 2. forgings, The ART evaluations of record for the vessel beltline plates ,,d elds for the currently
\J~/~ S'~-'and licensed period (33.1 EFPY) include power uprate conditions. Based on projected fluence values, the methodology in Regulatory Guide 1.99 was used to project the ART for 54 EFPY. The ART values projected to 54 EFPY are used to develop P-T limit curves. Projected ART values are well below the 200°F end of life ART suggested in Section 3 of Regulatory Guide 1.99 and are, thus, acceptable for the period of extended operation.
Disposition Reactor vessel adjusted reference temperature TLAAs have been projected to the end of the period of extended operation.
A. 1.3.1.4 Pressure-Temperature Limits To ensure that adequate margins of safety are maintained for various modes of reactor operation, 10 CFR 50, Appendix G specifies pressure and temperature requirements for affected materials for the service life of the reactor vessel. The basis for these fracture toughness requirements is ASME Section XI, Appendix G. The ASME Code requires P-T limits be established for hydrostatic pressure tests and leak tests; for operation with the core not critical during heatup and cooldown; and for core critical operation.
Final Safety Analysis Report Supplement Page A-29 t5tAmendment 53
Columbia Generating Station B.2.5 Buried Piping and Tanks Inspection Program License Renewal Application Technical Information 0Dotocation of Aging Effoct5, Require that an inspection of a representatiVc sample of buried piping be pn riurrm e Iwirn T ne 10 y, aFr preFIr PriOF H) cn nr rng n cT pcr lEu orf extcn nu opcration (i.e., between Year 30 and year 10).
in polyvinyl chloride Reqlufire an additional inspectionR of a ropresontatfiye sample of buried piping bee (PVC) performF'ed within 10 years after entering the period of extended operation (i.e.-,
piping in a between year 40 and year 50).
N Inert B fr4a- p...g.- B , stainless steel, portion of Operating Experience . I ... -m p 9 and polymeric the Potable iplant-specific I (PVC)
Water No history of piping degradation dueto external corrosion of buried piping was i',u I System for Columbia through searches of operating experience or discussions with program that is owners. Columbia operating experience demonstrates that the coating of buried steel outside the piping and tanks is effective in managing the effects of aging. Plant design scope of considerations addressed the potential for degradation of buried piping components License through the application of protectiveJorcoatincs internally-- I Insert
on Page B-40b.
- "
Renewal.
A review was conducted of station piping failures, and w was determined that there had been no documented failures attributed to externall -initiated corrosion. Identified instances of leakage associated with buried piping have been the resulit of internal RQt;4hlQ Insert J to LRA Section B.2.5 on Page B-40b. Insert K to LRA Section B.2.5 on Page B-40b.
The environmental conditions at Columbia are very good base n the sandy soil and System electrolyte resistivity of the soil which is considered very high. This has resulted in that--s minimal degradation of buried piping as evidenced by excavations of certain sections of etsidtewta piping for examination. There have been no significant areas of degradation caused by protective coating failure. This was determined after a section of buried Standby Renpewal Service Water (SW) System piping was excavated and evaluated in 2007.
Conclusion Insert L to LRA Section Replace with Insert 1B.2.5 on Page B-40c. A OR Pag* 9 4/a The tIid Piping adi Tanks Inspection Pogran vvwi ,,,anage lous u, material due to nUfr suseptible piping components and tanks in buried envirnments The Buried Piping and Tanks Inspection Program, with the required enhancements, ovides reasonable assurance that the aging effects will be managed such that mponents subject to aging management review will continue to perform heir int ed functions consistent with the current licensing basis for the period of exten led eration.
MUlnsert to LRA Section B.2.5 on Page B-40c.-I Insert C from pa B a Aging Management Programs Page B-40 Januay2010 53 lAmendmentA:- *49