MONTHYEARGO2-05-050, February 2005 Monthly Operating Report for Columbia Generating Station2005-03-0909 March 2005 February 2005 Monthly Operating Report for Columbia Generating Station GO2-05-025, January 2005 Monthly Operating Report for Columbia Generating Station2005-02-0909 February 2005 January 2005 Monthly Operating Report for Columbia Generating Station GO2-05-006, December 2004 Monthly Operating Report Columbia Generating Station2005-01-12012 January 2005 December 2004 Monthly Operating Report Columbia Generating Station ML0435202542004-12-0808 December 2004 November 2004 Monthly Operating Report for Columbia Generating Station ML0432804992004-11-12012 November 2004 October 2004 Monthly Operating Report for Columbia Generating Station GO2-04-182, September 2004 Monthly Operating Report for Columbia Generating Station2004-10-15015 October 2004 September 2004 Monthly Operating Report for Columbia Generating Station GO2-04-159, August 2004 Monthly Operating Report for Columbia Generating Station2004-09-15015 September 2004 August 2004 Monthly Operating Report for Columbia Generating Station GO2-04-140, July 2004 Monthly Operating Report for Columbia Generating Station2004-08-0909 August 2004 July 2004 Monthly Operating Report for Columbia Generating Station GO2-04-123, June 2004 Monthly Operating Report for Columbia Generating Station2004-07-14014 July 2004 June 2004 Monthly Operating Report for Columbia Generating Station GO2-04-109, May 2004 Monthly Operating Report for Columbia2004-06-15015 June 2004 May 2004 Monthly Operating Report for Columbia ML0414102042004-05-12012 May 2004 April 2004 Monthly Operating Report for Columbia ML0411204382004-04-14014 April 2004 March 2004 Monthly Operating Report for Columbia Generating Station GO2-04-034, February 2004 Monthly Operating Report for Columbia Generating Station2004-03-11011 March 2004 February 2004 Monthly Operating Report for Columbia Generating Station GO2-04-023, January 2004 Monthly Operating Report for Columbia Generating Station2004-02-12012 February 2004 January 2004 Monthly Operating Report for Columbia Generating Station GO2-04-006, December 2003 Monthly Operating Report for Columbia Generating Station2004-01-14014 January 2004 December 2003 Monthly Operating Report for Columbia Generating Station GO2-03-182, November 2003 Monthly Operating Report for Columbia Generating Station2003-12-0808 December 2003 November 2003 Monthly Operating Report for Columbia Generating Station GO2-03-170, October 2003 Monthly Operating Report for Columbia Generating Station2003-11-11011 November 2003 October 2003 Monthly Operating Report for Columbia Generating Station GO2-03-158, September 2003 Monthly Operating Report for Columbia2003-10-0808 October 2003 September 2003 Monthly Operating Report for Columbia GO2-03-146, August 2003 Monthly Operating Report for Columbia Generating Station2003-09-11011 September 2003 August 2003 Monthly Operating Report for Columbia Generating Station GO2-03-126, July 2003 Monthly Operating Report for Columbia Generating Station2003-08-11011 August 2003 July 2003 Monthly Operating Report for Columbia Generating Station ML0321205362003-07-14014 July 2003 June 2003 Monthly Operating Report for Columbia Generating Station GO2-03-096, May 2003 Monthly Operating Report for Columbia2003-06-11011 June 2003 May 2003 Monthly Operating Report for Columbia GO2-03-083, April 2003 Monthly Operating Report for Columbia Generating Station2003-05-13013 May 2003 April 2003 Monthly Operating Report for Columbia Generating Station ML0310704072003-04-0909 April 2003 March 2003 Monthly Operating Report for Columbia Generating Station ML0307902822003-03-11011 March 2003 February 2003 Monthly Operating Report for Columbia Generating Station GO2-03-026, January 2003 Monthly Operating Report for Columbia Generating Station2003-02-12012 February 2003 January 2003 Monthly Operating Report for Columbia Generating Station ML0302806502003-01-13013 January 2003 December 2002 Monthly Operating Report for Columbia Generating Station ML0235401322002-12-11011 December 2002 November 2002 Monthly Operating Report for Columbia Generating Station, Docket No.50-397 GO2-02-186, October 2002 Monthly Operating Report for Columbia2002-11-14014 November 2002 October 2002 Monthly Operating Report for Columbia GO2-02-163, September 2002 Monthly Operating Report for Columbia2002-10-0909 October 2002 September 2002 Monthly Operating Report for Columbia GO2-02-146, August 2002 Monthly Operating Report for Columbia Generating Station2002-09-11011 September 2002 August 2002 Monthly Operating Report for Columbia Generating Station GO2-02-133, July 2002 Monthly Operating Report for Columbia Generating Station2002-08-13013 August 2002 July 2002 Monthly Operating Report for Columbia Generating Station ML0220004632002-07-11011 July 2002 June 2002 Monthly Operating Report for Columbia Generating Station GO2-02-096, May 2002 Monthly Operating Report for Columbia Generating Station2002-06-10010 June 2002 May 2002 Monthly Operating Report for Columbia Generating Station GO2-02-090, April 2002 Monthly Operating Report for Columbia Generating Station2002-05-15015 May 2002 April 2002 Monthly Operating Report for Columbia Generating Station GO2-02-062, March 2002 Monthly Operating Report for Columbia Generating Station2002-04-0909 April 2002 March 2002 Monthly Operating Report for Columbia Generating Station GO2-02-041, February 2002 Monthly Operating Report for Columbia Generating Station2002-03-12012 March 2002 February 2002 Monthly Operating Report for Columbia Generating Station GO2-02-026, January 2002 Monthly Operating Report for Columbia Generating Station2002-02-12012 February 2002 January 2002 Monthly Operating Report for Columbia Generating Station GO2-02-007, December 2001 Monthly Operating Report for Columbia Generating Station2002-01-14014 January 2002 December 2001 Monthly Operating Report for Columbia Generating Station 2005-03-09
[Table view] |
Text
ENERGY NORTHWEST People. Vision - Solutions P.O. Box 968
- 99352-0968 October 15, 2004 G02-04-182 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555-0001
Subject:
COLUMBIA GENERATING STATION, DOCKET NO. 50-397 MONTHLY OPERATING REPORT SEPTEMBER 2004
Dear Sir or Madam:
Transmitted herewith is the Monthly Operating Report for the month of September 2004 as required by Technical Specification 5.6.4.
Respectfully, WS Oxeo Plant Gen a Manager Mail Drop 27M Attachment cc: BS Mallett - NRC RIV WA Macon - NRC NRR NRC Senior Resident Inspector - 988C TC Poindexter - Winston & Strawn INPO ANI Library Utility Data Institute RN Sherman - BPA /1399
OPERATING STATUS REPORT for Columbia Generating Station Date: October 1, 2004
- 1. Docket: 50-397
- 2. Reporting Period: September 2004
- 3. Utility
Contact:
Patricia Campbell (509) 377-4664
- 4. Design Electrical Rating (Net MWe): 1153
- 5. Maximum Dependable Capacity - summer (Net MWe): 1107 MONTH YEAR CUMULATIVE
- 6. "--HoursReactor Critical- -720;0-- ^67100.1 132,958.6
- 7. Hours Generator On-Line 720.0 6,013.8 129,427.4
- 8. Unit Reserve Shutdown Hours 0.0 0.0 3,274.7
- 9. Net Electrical Energy (MWH) 791,277 6,534,399 129,402,051
UNIT SHUTDOWNS DOCKET NO.: 50-397 UNIT NAME: Columbia Generating Station DATE: October 1, 2004 COMPLETED BY: P. Campbell TELEPHONE: (509) 377-4664 REPORT PERIOD: September, 2004 I Type Method of Cause / Corrective Actions No ae F: Forced Duration Shutting N Da S: Scheduled ours) Reason (l) Down (2) _ Comments l N/A _ I _ __I ______
SUMMARY
- Columbia Generating Station began and ended the month at 100% power. On September 5, 2004 power was reduced to about 73% to repair an oil leak on COND-F-3B. Full power was resumed on the afternoon of September 5, 2004. On August 15th the reactor was manually scrammed in response to a feedwater pump trip. The cause was a combination of reduced hotwell level controller response (adjusted to the high tend of the control band) and the shutdown water management condition (higher than normal water inventory in the Condensate Storage and Transfer system). High water level in the main condenser hotwell overflowed to cause a high water level in the feedwater drive turbine condenser drain tank and resulted in a trip signal to the feedwater pumps.
(1) REASON (2) METHOD A - Equipment Failure E - Operator Training & I - Manual B - Maintenance or Test License Examination 2 - Manual Trip/Scram C - Refueling F - Administration 3 - Auto Trip/Scram D - Regulatory Restriction G - Operational Error 4 - Continuation H - Other 5 - Other (Explain)