GO2-03-170, October 2003 Monthly Operating Report for Columbia Generating Station
| ML033230396 | |
| Person / Time | |
|---|---|
| Site: | Columbia |
| Issue date: | 11/11/2003 |
| From: | Oxenford W Energy Northwest |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| GO2-03-170 | |
| Download: ML033230396 (3) | |
Text
ENERGY NORTH WEST PO. Box 968 Richland, Washington 99352-0968 November 11, 2003 G02-03-170 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555-0001
Subject:
COLUMBIA GENERATING STATION, DOCKET NO. 50-397 MONTHLY OPERATING REPORT OCTOBER 2003
Dear Sir or Madam:
Transmitted herewith is the Monthly Operating Report for the month of October 2003 as required by Technical Specification 5.6.4.
Respectfully, Plant General Manager Mail Drop 927M
-- Attachment cc:
BS Mallett - NRC RIV BJ Benney - NRC NRR NRC Senior Resident Inspector - 988C TC Poindexter - Winston & Strawn INPO ANI Library Utility Data Institute RN Sherman - BPA / 1399 i
A.
s
4=
OPERATING STATUS REPORT for Columbia Generating Station Date: November 1, 2003
- 1.
Docket: 50-397
- 2.
Reporting Period: October 2003
- 3.
Utility
Contact:
Patricia Campbell (509) 377-4664
- 4.
Design Electrical Rating (Net MWe): 1153
- 5.
Maximum Dependable Capacity - summer (Net MWe): 1107
- 6.
Hours Reactor Critical -
- 7.
Hours Generator On-Line
- 8.
Unit Reserve Shutdown Hours
- 9.
Net Electrical Energy (MWH)
MONTH 745.0 745.0 0.0 817,158 YEAR 5,699.0 5,578.1 0.0 5,976,924 CUMULATIVE 125,394.5 121,949.6 3,274.7 121,229,703
'i UNIT SHUTDOWNS DOCKET NO.: 50-397 UNIT NAME:
Columbia Gencrating Station DATE: November 1, 2003 COMPLETED BY: P. Campbell TELEPHONE: (509) 377-4664 REPORT PERIOD: October, 2003 Type Method of Cause / Corrective Actions F: Forced Duration S
No.
Date S: Scheduled (Hours)
Reason (1)
Shuttig Comments NA i
I I
SUMMARY
The plant began and ended the month at 100% power.
(1) REASON A - Equipment Failure B - Maintenance or Test C - Refueling D - Regulatory Restriction E - Operator Training &
License Examination F - Administration G - Operational Error H - Other (2) METHOD I - Manual 2 - Manual Trip/Scram 3 - Auto Trip/Scram 4 - Continuation 5 - Other (Explain)