GO2-03-170, October 2003 Monthly Operating Report for Columbia Generating Station

From kanterella
(Redirected from GO2-03-170)
Jump to navigation Jump to search
October 2003 Monthly Operating Report for Columbia Generating Station
ML033230396
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 11/11/2003
From: Oxenford W
Energy Northwest
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
GO2-03-170
Download: ML033230396 (3)


Text

ENERGY NORTH WEST PO. Box 968 Richland, Washington 99352-0968 November 11, 2003 G02-03-170 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555-0001

Subject:

COLUMBIA GENERATING STATION, DOCKET NO. 50-397 MONTHLY OPERATING REPORT OCTOBER 2003

Dear Sir or Madam:

Transmitted herewith is the Monthly Operating Report for the month of October 2003 as required by Technical Specification 5.6.4.

Respectfully, Plant General Manager Mail Drop 927M

-- Attachment cc:

BS Mallett - NRC RIV BJ Benney - NRC NRR NRC Senior Resident Inspector - 988C TC Poindexter - Winston & Strawn INPO ANI Library Utility Data Institute RN Sherman - BPA / 1399 i

A.

s

4=

OPERATING STATUS REPORT for Columbia Generating Station Date: November 1, 2003

1.

Docket: 50-397

2.

Reporting Period: October 2003

3.

Utility

Contact:

Patricia Campbell (509) 377-4664

4.

Design Electrical Rating (Net MWe): 1153

5.

Maximum Dependable Capacity - summer (Net MWe): 1107

6.

Hours Reactor Critical -

7.

Hours Generator On-Line

8.

Unit Reserve Shutdown Hours

9.

Net Electrical Energy (MWH)

MONTH 745.0 745.0 0.0 817,158 YEAR 5,699.0 5,578.1 0.0 5,976,924 CUMULATIVE 125,394.5 121,949.6 3,274.7 121,229,703

'i UNIT SHUTDOWNS DOCKET NO.: 50-397 UNIT NAME:

Columbia Gencrating Station DATE: November 1, 2003 COMPLETED BY: P. Campbell TELEPHONE: (509) 377-4664 REPORT PERIOD: October, 2003 Type Method of Cause / Corrective Actions F: Forced Duration S

No.

Date S: Scheduled (Hours)

Reason (1)

Shuttig Comments NA i

I I

SUMMARY

The plant began and ended the month at 100% power.

(1) REASON A - Equipment Failure B - Maintenance or Test C - Refueling D - Regulatory Restriction E - Operator Training &

License Examination F - Administration G - Operational Error H - Other (2) METHOD I - Manual 2 - Manual Trip/Scram 3 - Auto Trip/Scram 4 - Continuation 5 - Other (Explain)