ENERGY NORTH WEST P0. Box 968

  • Richland, Washington 99352-0968 June 10, 2002 G02-02-096 Docket No. 50-397 U. S. Nuclear Regulatory Commission Document Control Desk Washington, D. C. 20555 Gentlemen:

Subject:

COLUMBIA GENERATING STATION OPERATING LICENSE NPF-21 MONTHLY OPERATING REPORT MAY 2002 Transmitted herewith is the Monthly Operating Report for the month of May 2002 as required by Technical Specification 5.6.4.

Respectfully, W.S. Oxenford (Mail Drop 927M)

Plant General Manager Attachment cc:

E.W. Merschoff-NRC RIV J.S. Cushing - NRR NRC Sr. Resident Inspector - 988C T.C. Poindexter - Winston & Strawn INPO ANI Library Utility Data Institute D.L. Williams - BPA / 1399

OPERATING STATUS REPORT for Columbia Generating Station Date:

June 1, 2002 Docket: 50-397 Reporting Period: May 2002 Utility

Contact:

Patricia Campbell (509) 377-4664 Design Electrical Rating (Net MWe):

Maximum Dependable Capacity - summer (Net MWe):

Hours Reactor Critical Hours Generator On-Line Unit Reserve Shutdown Hours Net Electrical Energy (MWH)

MONTH 744.0 744.0 0.0 808,114 YEAR 3,407.8 3,391.5 0.0 3,689,927 CUMULATIVE 114,558.5 111,234.5 3,274.7 109,961,412

10.

Challenges to safety/relief valves:

1.
2.
3.
4.

5.

6.
7.
8.

9.

1153 1107 None

UNIT SHUTDOWNS DOCKET NO.: 50-397 UNIT NAME:

Columbia Generating Station DATE: June 1, 2002 COMPLETED BY: P. Campbell TELEPHONE: (509) 377-4664 REPORT PERIOD: May, 2002 Type Method of Cause / Corrective Actions F: Forced Duration Shutting No.

Date S: Scheduled (Hours)

Reason (1)

Down(2)

Comments N/A

SUMMARY

The plant began and ended the month at power operation.

(1) REASON A - Equipment Failure B - Maintenance or Test C - Refueling D - Regulatory Restriction E - Operator Training &

License Examination F - Administration G - Operational Error H - Other (2) METHOD 1 - Manual 2 - Manual Trip/Scram 3 - Auto Trip/Scram 4 - Continuation 5 - Other (Explain)