GNRO-2004/00049, July 2004 Monthly Operating Report for Grand Gulf

From kanterella
Jump to navigation Jump to search
July 2004 Monthly Operating Report for Grand Gulf
ML042260406
Person / Time
Site: Grand Gulf Entergy icon.png
Issue date: 08/12/2004
From: Bottemiller C
Entergy Operations
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
GNRO-2004/00049
Download: ML042260406 (5)


Text

Maneger P!ai?t Lcenslng G N RO-2004~00

~ u g u s t 12,2004 U S. Nuclear Regulatory Commission

~ashington, D.C. 20555-0001 ocument Control Desk

Subject:

Monthly Operating Report Docket No. 50-416 License No. NPF-29 In accordance w~th the require ent of Technical Specification 5.6.4, Entergy Operations, Inc. is providing the Monthly Operating Report (MOR) for Gran Nuclear Station Unit 1 for July 2004.

This letter does not contain any commitments.

If you have any questions or require additional information, please contact this office.

Yours truly, attachments:

1. Operating Status
2. Average Daily Power Level
3. Unit Shutdo n and Power Reductions cc:

(See Next Page)

G N RO-2004/00049 Page 2 of 2 cc:

NRC Senior Resident Inspector Grand Gulf Nuclear Station Port Gibson, MS 39150 U.S. Nuclear Regulatory Commission ATTN: Dr. Bruce S. Mallett (w/2)

Regional Administrator, Region IV 61 1 Ryan Plaza Drive, Suite 400 Arlington, TX 7601 1-4005 U.S. Nuclear Regulatory Commission ATTN: Mr. Nageswaran Kalyanam, NRWDLPM (w/2)

ATTN: ADDRESSEE ONLY ATTN: U.S. Postal Delivery Address Only Mail Stop OWFNI7D-1 Washington, D.C. 20555-0001 Mr. D. E. Levanway (Wise Carter)

Mr. L. J. Smith (Wise Carter)

Mr. N. S. Reynolds Mr. H. L. Thomas GO40049

Attachment I to GNRO-2004l00049 DOCKET NO 50-416 DATE 08/04/2004 COMPLETED BY J. Charboneau TELEPHONE (601) 437-6797 OPERATING STATUS I.

2.
3.
4.
5.
6.
7.
8.
9.
10.

1 I.

12.
13.
14.
15.
16.
17.
18.
19.
20.
21.
22.
23.
24.

Unit Name: GGNS UNIT 1 Reporting Period: July, 2004 Licensed Thermal Power (MWt): 3898 MWT Nameplate Rating (Gross MWe): 1372.5 MWE Design Electrical Rating (Net MWe): 1250 MWE Maximum Dependable Capacity (Gross MWe): 1257 MWE Maximum Dependable Capacity (Net MWe):

1207 MWE If changes occur in Capacity Ratings (Items 3 through 7) Since Last Report. Give Reason: N/A Power Level To Which Restricted, If Any (Net MWe):

Reasons For Restrictions, If Any: NIA None Hours in Reporting Period Number of Hours Reactor was Critical Reactor Reserve Shutdown Hours Hours Generator On-Line Unit Reserve Shutdown Hours Gross Thermal Energy Generated (MWH)

Gross Electrical Energy Generated (MWH)

Net Electrical Energy Generated (MWH)

Unit Service Factor Unit Availability Factor Unit Capacity Factor (Using MDC Net)

Unit Capacity Factor (Using DER Net)

Unit Forced Outage Rate This Month 744 744.0 0

744.0 n

2,898,539 984,144 945,455 100.0 100.0 105.3 101.7 0.0 Yr to Date 5111 4427.5 0

4374.0 0

16,845,949 5,754,080 5,529, I78 85.6 85.6 89.6 86.6 0.0 Cumulative*

173,4 15 149,793.1 0

145,990.4 0

534,487.665 175,848,081 168,770.843 85.4 85.4 85.5 79.8 4.7 Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):

25.
26.

If Shut Down At End of Report Period. Estimated Date of Startup: NIA Units in Test Status (Prior to Commercial Operation):

Forecast Achieved INITIAL CRITICALITY 08/18/82 INITIAL ELECTRICITY 10120184 COMMERCIAL OPERATION 07101/85

  • -Items 11 through 18 are cumulative results since initial electricity GO40049 to GNRO-2004/00049 MONTH: July 2004 DAY AVERAGE DAILY POWER LEVEL (MWe-Net) 1 2

3 4

5 6

7 8

9 10 11 12 13 14 15 16 1278 1275 1271 1269 1270 1271 1270 1273 1275 1271 1272 1268 1269 1267 1264 1263 DOCKET NO 50-4 16 DATE 08/04/2004 COMPLETED BY J. Charboneau TELEPHONE 1601) 437-6797 DAY AVERAGE DAILY POWER LEVEL (MWe-Net) 17 1269 18 1271 19 1276 20 1274 21 1274 22 1266 23 1265 24 1267 25 1265 26 1272 27 1279 2s 1278 29 1273 30 1268 31 1269 GO40049 to GNRO-2004/00049 No.

Date Type (1)

Duration Reason Method Of Licensee Event System Code Component Hours (2)

Shutting Down Report #

(4)

Code (5)

UNIT SHUTDOWNS AND POWER REDUCTIONS Cause & Corrective Action To Prevent Recurrence (C&CA) 1 I 07/10/2004 I S

I 0.9 B

I 5

NA I

NA NA 1

2 3

4 5

F: Forced Reason:

Method:

Exhibit G - Instructions for Preparation of Exhibit I - Same Source S: Scheduled A-Equipment Failure (Explain) 1-Manual Data Entry Sheets for Licensee Event B-Maintenance or Test C-Refueling 3-Automatic Scram D-Regulatory Restriction 4-Continued E-Operator Training &

5-Reduced load F-Administrative G-Operational Error (Explain)

H-Other (Explain) 2-Manual Scram Report (LER) File (NUREG-0 16 1)

Licensing Examination 6-Other GO40049