Letter Sequence Response to RAI |
---|
|
|
|
|
---|
Category:Letter type:ET
MONTHYEARET 23-0006, CFR 50.55a Request Number CI3R-01 for the Third Containment Inservice Inspection Program Interval for Proposed Alternative Frequency to Containment Unbonded Post-Tensioning System Components2023-05-17017 May 2023 CFR 50.55a Request Number CI3R-01 for the Third Containment Inservice Inspection Program Interval for Proposed Alternative Frequency to Containment Unbonded Post-Tensioning System Components ET 23-0005, 10 CFR 50.55a Request Number I4R-08 for the Fourth Inservice Inspection Program Interval, Relief for Extension of Follow Up Examination Requirements for Reactor Pressure Vessel Head Penetration Nozzles with Mitigated Alloy 600/82/182 Peen2023-03-16016 March 2023 10 CFR 50.55a Request Number I4R-08 for the Fourth Inservice Inspection Program Interval, Relief for Extension of Follow Up Examination Requirements for Reactor Pressure Vessel Head Penetration Nozzles with Mitigated Alloy 600/82/182 Peened ET 23-0003, License Amendment Request (LAR) for Removal of the Power Range Neutron Flux Rate - High Negative Rate Trip Function from Technical Specifications2023-03-0101 March 2023 License Amendment Request (LAR) for Removal of the Power Range Neutron Flux Rate - High Negative Rate Trip Function from Technical Specifications ET 23-0002, Supplement to License Amendment Request to Adopt TSTF-577-A, Revision 1, Revised Frequencies for Steam Generator Tube Inspections2023-02-0707 February 2023 Supplement to License Amendment Request to Adopt TSTF-577-A, Revision 1, Revised Frequencies for Steam Generator Tube Inspections ET 23-0004, Response to Requests for Additional Information (RAI) Regarding License Amendment Request (LAR) for Deviation from Fire Protection Program Requirements2023-01-26026 January 2023 Response to Requests for Additional Information (RAI) Regarding License Amendment Request (LAR) for Deviation from Fire Protection Program Requirements ET 22-0006, Operating Corp. - Application to Revise Technical Specifications to Adopt TSTF-577-A, Revision 1, Revised Frequencies for Steam Generator Tube Inspections2022-12-0101 December 2022 Operating Corp. - Application to Revise Technical Specifications to Adopt TSTF-577-A, Revision 1, Revised Frequencies for Steam Generator Tube Inspections ET 22-0010, License Amendment Request (LAR) for Deviation from Fire Protection Program Requirements2022-08-0202 August 2022 License Amendment Request (LAR) for Deviation from Fire Protection Program Requirements ET 22-0012, Supplement to License Amendment Request - Diesel Generator Completion Time Extension for Technical Specification 3.8.1, AC Sources - Operating2022-07-12012 July 2022 Supplement to License Amendment Request - Diesel Generator Completion Time Extension for Technical Specification 3.8.1, AC Sources - Operating ET 22-0011, Withdrawal of 10 CFR 50.55a Request I4R-08, Relief for Extension of Follow-up Examination and Visual Examination Requirements for Reactor Pressure Vessel Head Penetration Nozzles with Mitigated Alloy 600/82/182 Peened Surface2022-05-31031 May 2022 Withdrawal of 10 CFR 50.55a Request I4R-08, Relief for Extension of Follow-up Examination and Visual Examination Requirements for Reactor Pressure Vessel Head Penetration Nozzles with Mitigated Alloy 600/82/182 Peened Surface ET 22-0005, Response to Request for Additional Information Regarding License Amendment Request - Diesel Generator Completion Time Extension for Technical Specification 3.8.1, AC Sources - Operating2022-04-13013 April 2022 Response to Request for Additional Information Regarding License Amendment Request - Diesel Generator Completion Time Extension for Technical Specification 3.8.1, AC Sources - Operating ET 22-0003, CFR 50.55a Request I4R-09 for the Fourth Inservice Inspection Program Interval, Relief from Examination of Reactor Vessel Flange Threads2022-04-0606 April 2022 CFR 50.55a Request I4R-09 for the Fourth Inservice Inspection Program Interval, Relief from Examination of Reactor Vessel Flange Threads ET 22-0002, Operating Corp 10 CFR 50.55a Request Number I4R-08 for the Fourth Inservice Inspection Program Interval, Relief for Extension of Follow Up Examination and Visual Examination Requirements for Reactor Pressure Vessel Head .2022-04-0404 April 2022 Operating Corp 10 CFR 50.55a Request Number I4R-08 for the Fourth Inservice Inspection Program Interval, Relief for Extension of Follow Up Examination and Visual Examination Requirements for Reactor Pressure Vessel Head . ET 22-0004, Operating Corp - Response to Request for Confirmation of Information (RCI) Regarding Steam Generator Tube Inspection Report2022-03-15015 March 2022 Operating Corp - Response to Request for Confirmation of Information (RCI) Regarding Steam Generator Tube Inspection Report ET 22-0001, Removal of the Table of Contents from the Technical Specifications2022-01-12012 January 2022 Removal of the Table of Contents from the Technical Specifications ET 21-0017, Response to Request for Additional Information Regarding License Amendment Request - Revision to Technical Specification 3.3.2, Engineered Safety Feature Actuation System (ESFAS) Instrumentation2021-12-22022 December 2021 Response to Request for Additional Information Regarding License Amendment Request - Revision to Technical Specification 3.3.2, Engineered Safety Feature Actuation System (ESFAS) Instrumentation ET 21-0009, Results of the Steam Generator Tube Inservice Inspection During the 24th Refueling Outage2021-11-0101 November 2021 Results of the Steam Generator Tube Inservice Inspection During the 24th Refueling Outage ET 21-0015, Withdrawal of License Amendment Request for a Risk-Informed Resolution to GSI-1912021-10-20020 October 2021 Withdrawal of License Amendment Request for a Risk-Informed Resolution to GSI-191 ET 21-0012, Supplement to License Amendment Request for a Risk-Informed Resolution to GSI-1912021-10-11011 October 2021 Supplement to License Amendment Request for a Risk-Informed Resolution to GSI-191 ET 21-0004, License Amendment Request - Diesel Generator Completion Time Extension for Technical Specification 3.8.1, AC Sources - Operating2021-09-29029 September 2021 License Amendment Request - Diesel Generator Completion Time Extension for Technical Specification 3.8.1, AC Sources - Operating ET 21-0010, License Amendment Request - Revision to Technical Specification 3.3.2, Engineered Safety Feature Actuation System (ESFAS) Instrumentation2021-09-29029 September 2021 License Amendment Request - Revision to Technical Specification 3.3.2, Engineered Safety Feature Actuation System (ESFAS) Instrumentation ET 21-0005, Operating Corp., License Amendment Request for a Risk-Informed Resolution to GSI-1912021-08-12012 August 2021 Operating Corp., License Amendment Request for a Risk-Informed Resolution to GSI-191 ET 20-0013, Response to Request for Additional Information Re Application for Technical Specification Change Re Risk-Informed Justification for Relocation of Specific Surveillance Frequency Requirements to Licensee Controlled Program (TSTF-415)2020-10-26026 October 2020 Response to Request for Additional Information Re Application for Technical Specification Change Re Risk-Informed Justification for Relocation of Specific Surveillance Frequency Requirements to Licensee Controlled Program (TSTF-415) ET 20-0011, Request to Use a Provision of a Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI2020-10-0101 October 2020 Request to Use a Provision of a Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI ET 20-0007, License Amendment Request for Replacement of Engineered Safety Features Transformers with New Transformers That Have Active Automatic Load Tap Changers2020-06-0808 June 2020 License Amendment Request for Replacement of Engineered Safety Features Transformers with New Transformers That Have Active Automatic Load Tap Changers ET 20-0008, Operating Corporation Update for Full Implementation of Open Phase Detection System2020-05-20020 May 2020 Operating Corporation Update for Full Implementation of Open Phase Detection System ET 20-0004, Application for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program (TSTF-425)2020-04-27027 April 2020 Application for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program (TSTF-425) ET 20-0002, Response to Request for Additional Information Regarding Utilizing Code Case N-666-1, Weld Overlay of Class 1, 2, and 3 Socket Welded Connections, Section XI, Division 12020-01-29029 January 2020 Response to Request for Additional Information Regarding Utilizing Code Case N-666-1, Weld Overlay of Class 1, 2, and 3 Socket Welded Connections, Section XI, Division 1 ET 19-0021, Errata for Supplemental Response to Request for Additional Information Revision to Technical Specification 3.3.5, Loss of Power (LOP) Diesel Generator (DG) Start Instrumentation2019-12-0909 December 2019 Errata for Supplemental Response to Request for Additional Information Revision to Technical Specification 3.3.5, Loss of Power (LOP) Diesel Generator (DG) Start Instrumentation ET 19-0020, Supplemental Response to Request for Additional Information Revision to Technical Specification 3.3.5, Loss of Power (LOP) Diesel Generator (DG) Start Instrumentation2019-11-13013 November 2019 Supplemental Response to Request for Additional Information Revision to Technical Specification 3.3.5, Loss of Power (LOP) Diesel Generator (DG) Start Instrumentation ET 19-0019, Response to Request for Additional Information Revision to Technical Specification 3.3.5, Loss of Power (LOP) Diesel Generator (DG) Start Instrumentation.2019-09-10010 September 2019 Response to Request for Additional Information Revision to Technical Specification 3.3.5, Loss of Power (LOP) Diesel Generator (DG) Start Instrumentation. ET 19-0018, Supplement to License Amendment Request to Revise Technical Specification 3.3.5, Loss of Power (LOP) Diesel Generator (DG) Start Instrumentation.2019-08-22022 August 2019 Supplement to License Amendment Request to Revise Technical Specification 3.3.5, Loss of Power (LOP) Diesel Generator (DG) Start Instrumentation. ET 19-0014, lnserv1ce Inspection (ISI) Program Relief Request Number 14R-07, to Utilize Code Case N-513-4, Evaluation Criteria for Temporary Acceptance of Flaws in Moderate Energy Class 2 or 3 Piping Section XI, D1v1s1on 12019-08-15015 August 2019 lnserv1ce Inspection (ISI) Program Relief Request Number 14R-07, to Utilize Code Case N-513-4, Evaluation Criteria for Temporary Acceptance of Flaws in Moderate Energy Class 2 or 3 Piping Section XI, D1v1s1on 1 ET 19-0002, License Amendment Request to Revise Technical Specification 3.3.5, Loss of Power (LOP) Diesel Generator (DG) Start Instrumentation.2019-03-18018 March 2019 License Amendment Request to Revise Technical Specification 3.3.5, Loss of Power (LOP) Diesel Generator (DG) Start Instrumentation. ET 19-0008, Response to Request for Additional Information Related to Thermal Conductivity Degradation for License Amendment Request to Revise Technical Specifications to Transition to Westinghouse Core Design and Safety Analysis Including Adoption.2019-03-0505 March 2019 Response to Request for Additional Information Related to Thermal Conductivity Degradation for License Amendment Request to Revise Technical Specifications to Transition to Westinghouse Core Design and Safety Analysis Including Adoption. ET 19-0003, License Amendment Request to Revise Technical Specification 3.6.3 and Surveillance Requirement 3.6.3.1 to Remove Use of a Blind Flange2019-02-25025 February 2019 License Amendment Request to Revise Technical Specification 3.6.3 and Surveillance Requirement 3.6.3.1 to Remove Use of a Blind Flange ET 19-0001, Application to Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules, Revision 42019-01-23023 January 2019 Application to Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules, Revision 4 ET 18-0032, Operating Corporation Change of Date for Full Implementation of Open Phase Detection System2018-12-0707 December 2018 Operating Corporation Change of Date for Full Implementation of Open Phase Detection System ET 18-0035, Operating Corp., Supplemental Response to RAI for License Amendment Request to Revise Technical Specifications to Transition to Westinghouse Core Design and Safety Analysis Including Adoption of Alternative Source Term2018-12-0606 December 2018 Operating Corp., Supplemental Response to RAI for License Amendment Request to Revise Technical Specifications to Transition to Westinghouse Core Design and Safety Analysis Including Adoption of Alternative Source Term ET 18-0029, (WCGS) - Results of the Twenty First Steam Generator Tube Inservice Inspection2018-10-31031 October 2018 (WCGS) - Results of the Twenty First Steam Generator Tube Inservice Inspection ET 18-0018, Supplement to License Amendment Request to Revise Technical Specifications to Transition to Westinghouse Core Design and Safety Analysis Including Adoption of Alternative Source Term2018-06-19019 June 2018 Supplement to License Amendment Request to Revise Technical Specifications to Transition to Westinghouse Core Design and Safety Analysis Including Adoption of Alternative Source Term ET 18-0016, Response to Generic Letter 2016-01, Monitoring of Neutron Absorbing Materials in Spent Fuel Pools Request for Supplemental Information2018-05-29029 May 2018 Response to Generic Letter 2016-01, Monitoring of Neutron Absorbing Materials in Spent Fuel Pools Request for Supplemental Information ET 18-0014, Response to Request for Additional Information Regarding the License Amendment Request for Addition of New Technical Specification 3.7.20, Class 1E Electrical Equipment Air Conditioning (A/C) System.2018-05-29029 May 2018 Response to Request for Additional Information Regarding the License Amendment Request for Addition of New Technical Specification 3.7.20, Class 1E Electrical Equipment Air Conditioning (A/C) System. ET 18-0013, Relief Request Number I4R-06, Request for Relief from ASME Code Case N-729-4 for Reactor Vessel Head Penetration Nozzle Weld2018-05-0202 May 2018 Relief Request Number I4R-06, Request for Relief from ASME Code Case N-729-4 for Reactor Vessel Head Penetration Nozzle Weld ET 18-0011, (WCGS) - Guarantee of Payment of Deferred Premiums2018-04-30030 April 2018 (WCGS) - Guarantee of Payment of Deferred Premiums ET 18-0012, Operating Corp., Supplement to License Amendment Request to Revise Technical Specifications to Transition to Westinghouse Core Design and Safety Analysis Including Adoption of Alternative Source Term2018-04-19019 April 2018 Operating Corp., Supplement to License Amendment Request to Revise Technical Specifications to Transition to Westinghouse Core Design and Safety Analysis Including Adoption of Alternative Source Term ET 18-0010, Financial Protection Levels2018-03-29029 March 2018 Financial Protection Levels ET 18-0007, Supplement to License Amendment Request for Addition of New Technical Specification 3.7.20, Class 1E Electrical Equipment Air Conditioning (A/C) System.2018-02-15015 February 2018 Supplement to License Amendment Request for Addition of New Technical Specification 3.7.20, Class 1E Electrical Equipment Air Conditioning (A/C) System. ET 18-0005, Withdrawal of License Amendment Request for Revision to the Emergency Plan2018-02-0505 February 2018 Withdrawal of License Amendment Request for Revision to the Emergency Plan ET 18-0004, Supplement to License Amendment Request to Revise Technical Specifications to Transition to Westinghouse Core Design and Safety Analysis Including Adoption of Alternative Source Term2018-01-29029 January 2018 Supplement to License Amendment Request to Revise Technical Specifications to Transition to Westinghouse Core Design and Safety Analysis Including Adoption of Alternative Source Term ET 17-0025, Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specifications to Transition to Westinghouse Core Design and Safety Analyses Including Adoption of Alternative Source Term2017-11-14014 November 2017 Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specifications to Transition to Westinghouse Core Design and Safety Analyses Including Adoption of Alternative Source Term 2023-05-17
[Table view] |
Text
W LF CREEK 'NUCLEAR OPERATING CORPORATION John P. Broschak Vice President Engineering March 20, 2013 ET 13-0011 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555
Reference:
- 1) Letter ET 12-0022, dated October 18, 2012, from J. P. Broschak, WCNOC, to USNRC
- 2) Letter dated February 19, 2013, from C. F. Lyon, USNRC, to M. W.
Sunseri, WCNOC, "Wolf Creek Generating Station - Request for Additional Information Re: Request for Deviation from Fire Protection Program Requirements for Volume Control Tank Outlet Valves (TAC NO. ME9823)"
Subject:
Docket No. 50-482: Response to Request for Additional Information Regarding License Amendment Request for Deviation from Fire Protection Program Requirements for Volume Control Tank Outlet Valves Gentlemen:
Reference 1 provided Wolf Creek Nuclear Operating Corporation's (WCNOC) request for a license amendment to revise Paragraph 2.C.(5)(a) of the renewed facility operating license and the fire protection program as described in the Updated Safety Analysis Report (USAR) to allow a deviation from the separation requirements of 10 CFR Part 50, Appendix R, Section III.G.2, as documented in Appendix 9.5E of the Wolf Creek Generating Station USAR, for the volume control tank outlet valves (BGLCV01 12B and BGLCV01 12C). Reference 2 provided a Nuclear Regulatory Commission (NRC) request for additional information related to the application.
Attachment I provides WCNOC's response to the request for additional information.
The additional information does not expand the scope of the application, and does not impact the no significant hazards consideration determination presented in Reference 1.
In accordance with 10 CFR 50.91, "Notice for public comment; State consultation," a copy of this submittal is being provided to the designated Kansas State official.
A (620) 364-8831 P.O. Box 411 / Burlington, KS 66839 / Phone:
An Equal Opportunity Employer M/F/HCNET LI([--,
ET 13-0011 Page 2 of 3 This letter contains no commitments. If you have any questions concerning this matter, please contact me at (620) 364-4085, or Mr. Michael J. Westman at (620) 364-8831 ext. 4009.
Sincerely,
ý,&&-Mý John P. Broschak JPB/rlt Attachment I - Response to Request for Additional Information cc: E. E. Collins (NRC), w/a T. A. Conley (NRC), w/a C. F. Lyon (NRC), w/a N. F. O'Keefe (NRC), w/a Senior Resident Inspector (NRC), w/a
ET 13-0011 Page 3 of 3 STATE OF KANSAS
)S COUNTY OF COFFEY John P. Broschak, of lawful age, being first duly sworn upon oath says that he is Vice President Engineering of Wolf Creek Nuclear Operating Corporation; that he has read the foregoing document and knows the contents thereof; that he has executed the same for and on behalf of said Corporation with full power and authority to do so; and that the facts therein stated are true and correct to the best of his knowledge, information and belief.
Jod. Broschak
)_c President Engineering SUBSCRIBED and sworn to before me this olG iday of (7areb ,2013.
I ~~
OFFICIAL'
.,,ý.SEAL:.
RHONA L.1EEE E YCMISO Notary Public ei C, / Expiration Dat (9 LrL~2 ,V_
Attachment I to ET 13-0011 Page 1 of 4 Response to Request for Additional Information Reference 1 provided Wolf Creek Nuclear Operating Corporation's (WCNOC) request for a license amendment to revise Paragraph 2.C.(5)(a) of the renewed facility operating license and the fire protection program as described in the Updated Safety Analysis Report (USAR) to allow a deviation from the separation requirements of 10 CFR Part 50, Appendix R, Section III.G.2, as documented in Appendix 9.5E of the Wolf Creek Generating Station USAR, for the volume control tank outlet valves (BGLCV01 12B and BGLCV01 12C). Reference 2 provided a Nuclear Regulatory Commission (NRC) request for additional information related to the application. The specific NRC questions are provided in italics.
- 1. The LAR does not provide a description of the impact on the plant for a fire in room 1318.
- a. Please describe the impact on the plant and postulatedscenario that requires an LAR for a fire in room 1318.
Response: The postulated scenario that requires a license amendment request for a fire in room 1318 is a design basis fire in fire area A-8 that damages both redundant volume control tank (VCT) isolation valves and prevents them from closing automatically or manually (from the control room). The same fire is also postulated to affect makeup to the VCT. With an Emergency Core Cooling System (ECCS) centrifugal charging pump running and injecting into the Reactor Coolant System (RCS), this scenario causes the VCT to drain and allow hydrogen to enter the pump suction, causing damage to the pump.
As discussed on page 12 of 15 of Reference 1, a fire contained within room 1318 will not cause a loss of normal letdown. Consequently, makeup to the VCT will remain available, preventing hydrogen binding of the centrifugal charging pumps. A spurious low-low VCT level signal due to damage to BGLT01 12 will initiate swapover to the Refueling Water Storage Tank (RWST) and open valve BNLCV01 12D (RWST to charging header valve). If this occurs with both VCT outlet valves open a net positive suction head will be maintained on the centrifugal charging pumps because makeup to the VCT remains available and check valves in the RWST to charging header prevent the VCT from draining to the RWST.
In the event of a postulated fire in room 1318 that prevents closing one of the VCT outlet valves, post fire safe shutdown (PFSSD) is assured because makeup to the VCT remains available. Therefore, the VCT is not expected to drain and hydrogen is not expected to enter the ECCS centrifugal charging pump suction.
Based on the above discussion, a postulated fire in room 1318 will have no adverse impact on the PFSSD capability.
Attachment I to ET 13-0011 Page 2 of 4
- 1. The LAR does not provide a description of the impact on the plant for a fire in room 1318.
- b. Please describe whether a loss of offsite power is credible for a fire in room 1318 and, if credible, summarize the impact on the plant.
Response: Loss of offsite power is not credible for a fire in room 1318. Calculation XX-E-013, "Post-Fire Safe Shutdown (PFSSD) Analysis," Appendix 2, provides a loss of offsite power evaluation for fires outside the control room. The evaluation shows that a fire in fire area A-8 could cause a loss of Train 'A' offsite and onsite power but will not cause a loss of Train 'B' onsite or offsite power. Further review of cable routing data shows that none of the Train 'A' onsite and offsite power cables run in room 1318. Therefore, a fire in room 1318 will not cause a loss of either Train 'A' or Train 'B' offsite or onsite power.
- 1. The LAR does not provide a description of the impact on the plant for a fire in room 1318.
- c. In the event a fire affects both volume control tank (VCT) outlet valves (by preventing both valves from closing), please describe the operating procedures available to the control room operatorsto close the VCT outlet valves.
Response: Upon indication of a fire, control room operators enter procedure OFN KC-016, "Fire Response." Attachment B2 of OFN KC-016 provides a list of possible fire-induced failures and mitigating operator actions in the event of a fire in fire area A-8. In the event the VCT outlet valves fail to close and makeup to the VCT is lost, operators are directed to stop the operating ECCS centrifugal charging pump, line up centrifugal charging pump suction from the RWST, stop the reactor makeup water pumps and isolate the hydrogen supply to the VCT.
These actions prevent hydrogen gas binding of the operating centrifugal charging pump in cases where the VCT cannot be isolated. These actions are considered compensatory measures until approval of this license amendment request. Upon approval, the mitigating action will be revised to direct operators to line up RWST suction to the charging header and close BGLCV0112B or BGLCV0112C from the control room.
- 1. The LAR does not provide a description of the impact on the plant for a fire in room 1318.
- d. Please describe if there is a manual action to close the VCT outlet valves in the event of a fire and, if so, provide a summary of the feasibility and reliability of the manual action.
Response: There are no operator manual actions (local actions, in response to a fire) to close the VCT outlet valves in the event of a fire in fire area A-8, as the outlet valves are located in the fire area of concern. Operators would have to traverse the fire-affected area to close the valve, which would not prove to be feasible or reliable. The license amendment request seeks approval of the current configuration to credit the ability to close one of the two VCT outlet valves from the control room.
As stated in the response to Question 1.c. above, upon approval of this license amendment request, a control room operator action will have the operators close both VCT outlet valves using the hand switches in the control room. This action will be identified in procedure OFN KC-016, "Fire Response."
Attachment I to ET 13-0011 Page 3 of 4
- 2. In Amendment No. 193, dated March 9, 2011 (ADAMS Accession No. MLl 10530183), a deviation was granted to the WCGS FPPfor fire area A-8.
- a. Please identify all other deviations granted for area A-8.
Response: There are two equipment hatches in fire area A-8 for which deviations were granted. NUREG-0881, Supplement No. 5 (Reference 3), Section 9.5.1.4, "Fire Protection for Specific Areas," states, in part:
"The auxiliary building is provided with two sets of equipment hatchways in the northern and southern ends of the auxiliary building corridors. A monorail hoist serves each set of hatchways to allow equipment to be moved from one location to another. Steel hatch covers and automatic sprinkler water curtains are provided for each hatchway at elevations 2000 ft, 2026 ft, and 2047 ft to separate the corridor fire areas.
Because of the low fuel loading and configuration of equipment in these areas, the staff finds that the water curtains and steel covers provide a level of safety equivalent to the technical requirements of Section C.5.b of BTP CMEB 9.5-1."
- 2. In Amendment No. 193, dated March 9, 2011 (ADAMS Accession No. MLl10530183), a deviation was granted to the WCGS FPPfor fire area A-8.
- b. Please provide a technicaljustification that demonstrates that the current application will not affect the conclusion of any priordeviation for area A-8.
Response: License Amendment No. 193 (Reference 4) addresses the interface designation of the pressurizer power-operated relief valves (PORVs) from high/low pressure interface to non-high/low pressure interface. Cables associated with the Train 'A' pressurizer PORV and associated block valve are run in fire area A-8. Therefore, fire area A-8 is included in the areas affected by Amendment No. 193. The NRC staff conclusions in Section 3.3 of Reference 4 state, in part:
"The removal of the PORVs and block valves as high/low pressure interface components is a reduction in the PFSSD analysis methodology contained in WCNOC's PFSSD analysis. However, the defense-in-depth measures provide reasonable assurance that a fire that does occur will be limited in severity and that there is reasonable assurance that safe shutdown can be achieved."
The defense-in-depth measures provided in fire area A-8 are not affected by the current license amendment request (Reference 1). Therefore, Amendment No. 193 is not affected by Reference 1.
The license amendment request (Reference 1) does not affect the conclusion in Section 9.5.1.4 of Reference 3 regarding equipment hatch covers. The low combustible loading configuration of the equipment hatch covers and automatic suppression and detection provides an acceptable defense-in-depth approach commensurate with the area hazards. The nearest equipment hatch is located approximately 30 feet horizontally from the room 1318 door.
Attachment I to ET 13-0011 Page 4 of 4
References:
- 1. Letter ET 12-0022, "License Amendment Request (LAR) for Deviation from Fire Protection Program Requirements - Volume Control Tank Outlet Valves," October 18, 2012. ADAMS Accession No. ML12299A312.
- 2. Letter from C. F. Lyon, USNRC, to M. W. Sunseri, WCNOC, "Wolf Creek Generating Station - Request for Additional Information Re: Request for Deviation from Fire Protection Program Requirements for Volume Control Tank Outlet Valves (TAC NO.
ME9823)," February 19, 2013. ADAMS Accession No. ML13046A100.
- 3. NURE-0881, "Safety Evaluation Report related to the operation of Wolf Creek Generating Station, Unit No. 1," Supplement No. 5, March 1985.
- 4. Letter from B. K. Singal, USNRC, to M. W. Sunseri, WCNOC, "Wolf Creek Generating Station - Issuance of Amendment re: Removing High/Low Pressure Designation from the Pressurizer Power-Operated Relief Valves (TAC NO. ME3766)," March 9, 2011. ADAMS Accession No. ML110530183.