MONTHYEARET 23-0006, CFR 50.55a Request Number CI3R-01 for the Third Containment Inservice Inspection Program Interval for Proposed Alternative Frequency to Containment Unbonded Post-Tensioning System Components2023-05-17017 May 2023 CFR 50.55a Request Number CI3R-01 for the Third Containment Inservice Inspection Program Interval for Proposed Alternative Frequency to Containment Unbonded Post-Tensioning System Components ET 23-0005, 10 CFR 50.55a Request Number I4R-08 for the Fourth Inservice Inspection Program Interval, Relief for Extension of Follow Up Examination Requirements for Reactor Pressure Vessel Head Penetration Nozzles with Mitigated Alloy 600/82/182 Peen2023-03-16016 March 2023 10 CFR 50.55a Request Number I4R-08 for the Fourth Inservice Inspection Program Interval, Relief for Extension of Follow Up Examination Requirements for Reactor Pressure Vessel Head Penetration Nozzles with Mitigated Alloy 600/82/182 Peened ET 23-0003, License Amendment Request (LAR) for Removal of the Power Range Neutron Flux Rate - High Negative Rate Trip Function from Technical Specifications2023-03-0101 March 2023 License Amendment Request (LAR) for Removal of the Power Range Neutron Flux Rate - High Negative Rate Trip Function from Technical Specifications ET 23-0002, Supplement to License Amendment Request to Adopt TSTF-577-A, Revision 1, Revised Frequencies for Steam Generator Tube Inspections2023-02-0707 February 2023 Supplement to License Amendment Request to Adopt TSTF-577-A, Revision 1, Revised Frequencies for Steam Generator Tube Inspections ET 23-0004, Response to Requests for Additional Information (RAI) Regarding License Amendment Request (LAR) for Deviation from Fire Protection Program Requirements2023-01-26026 January 2023 Response to Requests for Additional Information (RAI) Regarding License Amendment Request (LAR) for Deviation from Fire Protection Program Requirements ET 22-0006, Operating Corp. - Application to Revise Technical Specifications to Adopt TSTF-577-A, Revision 1, Revised Frequencies for Steam Generator Tube Inspections2022-12-0101 December 2022 Operating Corp. - Application to Revise Technical Specifications to Adopt TSTF-577-A, Revision 1, Revised Frequencies for Steam Generator Tube Inspections ET 22-0010, License Amendment Request (LAR) for Deviation from Fire Protection Program Requirements2022-08-0202 August 2022 License Amendment Request (LAR) for Deviation from Fire Protection Program Requirements ET 22-0012, Supplement to License Amendment Request - Diesel Generator Completion Time Extension for Technical Specification 3.8.1, AC Sources - Operating2022-07-12012 July 2022 Supplement to License Amendment Request - Diesel Generator Completion Time Extension for Technical Specification 3.8.1, AC Sources - Operating ET 22-0011, Withdrawal of 10 CFR 50.55a Request I4R-08, Relief for Extension of Follow-up Examination and Visual Examination Requirements for Reactor Pressure Vessel Head Penetration Nozzles with Mitigated Alloy 600/82/182 Peened Surface2022-05-31031 May 2022 Withdrawal of 10 CFR 50.55a Request I4R-08, Relief for Extension of Follow-up Examination and Visual Examination Requirements for Reactor Pressure Vessel Head Penetration Nozzles with Mitigated Alloy 600/82/182 Peened Surface ET 22-0005, Response to Request for Additional Information Regarding License Amendment Request - Diesel Generator Completion Time Extension for Technical Specification 3.8.1, AC Sources - Operating2022-04-13013 April 2022 Response to Request for Additional Information Regarding License Amendment Request - Diesel Generator Completion Time Extension for Technical Specification 3.8.1, AC Sources - Operating ET 22-0003, CFR 50.55a Request I4R-09 for the Fourth Inservice Inspection Program Interval, Relief from Examination of Reactor Vessel Flange Threads2022-04-0606 April 2022 CFR 50.55a Request I4R-09 for the Fourth Inservice Inspection Program Interval, Relief from Examination of Reactor Vessel Flange Threads ET 22-0002, Operating Corp 10 CFR 50.55a Request Number I4R-08 for the Fourth Inservice Inspection Program Interval, Relief for Extension of Follow Up Examination and Visual Examination Requirements for Reactor Pressure Vessel Head .2022-04-0404 April 2022 Operating Corp 10 CFR 50.55a Request Number I4R-08 for the Fourth Inservice Inspection Program Interval, Relief for Extension of Follow Up Examination and Visual Examination Requirements for Reactor Pressure Vessel Head . ET 22-0004, Operating Corp - Response to Request for Confirmation of Information (RCI) Regarding Steam Generator Tube Inspection Report2022-03-15015 March 2022 Operating Corp - Response to Request for Confirmation of Information (RCI) Regarding Steam Generator Tube Inspection Report ET 22-0001, Removal of the Table of Contents from the Technical Specifications2022-01-12012 January 2022 Removal of the Table of Contents from the Technical Specifications ET 21-0017, Response to Request for Additional Information Regarding License Amendment Request - Revision to Technical Specification 3.3.2, Engineered Safety Feature Actuation System (ESFAS) Instrumentation2021-12-22022 December 2021 Response to Request for Additional Information Regarding License Amendment Request - Revision to Technical Specification 3.3.2, Engineered Safety Feature Actuation System (ESFAS) Instrumentation ET 21-0009, Results of the Steam Generator Tube Inservice Inspection During the 24th Refueling Outage2021-11-0101 November 2021 Results of the Steam Generator Tube Inservice Inspection During the 24th Refueling Outage ET 21-0015, Withdrawal of License Amendment Request for a Risk-Informed Resolution to GSI-1912021-10-20020 October 2021 Withdrawal of License Amendment Request for a Risk-Informed Resolution to GSI-191 ET 21-0012, Supplement to License Amendment Request for a Risk-Informed Resolution to GSI-1912021-10-11011 October 2021 Supplement to License Amendment Request for a Risk-Informed Resolution to GSI-191 ET 21-0004, License Amendment Request - Diesel Generator Completion Time Extension for Technical Specification 3.8.1, AC Sources - Operating2021-09-29029 September 2021 License Amendment Request - Diesel Generator Completion Time Extension for Technical Specification 3.8.1, AC Sources - Operating ET 21-0010, License Amendment Request - Revision to Technical Specification 3.3.2, Engineered Safety Feature Actuation System (ESFAS) Instrumentation2021-09-29029 September 2021 License Amendment Request - Revision to Technical Specification 3.3.2, Engineered Safety Feature Actuation System (ESFAS) Instrumentation ET 21-0005, Operating Corp., License Amendment Request for a Risk-Informed Resolution to GSI-1912021-08-12012 August 2021 Operating Corp., License Amendment Request for a Risk-Informed Resolution to GSI-191 ET 20-0013, Response to Request for Additional Information Re Application for Technical Specification Change Re Risk-Informed Justification for Relocation of Specific Surveillance Frequency Requirements to Licensee Controlled Program (TSTF-415)2020-10-26026 October 2020 Response to Request for Additional Information Re Application for Technical Specification Change Re Risk-Informed Justification for Relocation of Specific Surveillance Frequency Requirements to Licensee Controlled Program (TSTF-415) ET 20-0011, Request to Use a Provision of a Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI2020-10-0101 October 2020 Request to Use a Provision of a Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI ET 20-0007, License Amendment Request for Replacement of Engineered Safety Features Transformers with New Transformers That Have Active Automatic Load Tap Changers2020-06-0808 June 2020 License Amendment Request for Replacement of Engineered Safety Features Transformers with New Transformers That Have Active Automatic Load Tap Changers ET 20-0008, Operating Corporation Update for Full Implementation of Open Phase Detection System2020-05-20020 May 2020 Operating Corporation Update for Full Implementation of Open Phase Detection System ET 20-0004, Application for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program (TSTF-425)2020-04-27027 April 2020 Application for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program (TSTF-425) ET 20-0002, Response to Request for Additional Information Regarding Utilizing Code Case N-666-1, Weld Overlay of Class 1, 2, and 3 Socket Welded Connections, Section XI, Division 12020-01-29029 January 2020 Response to Request for Additional Information Regarding Utilizing Code Case N-666-1, Weld Overlay of Class 1, 2, and 3 Socket Welded Connections, Section XI, Division 1 ET 19-0021, Errata for Supplemental Response to Request for Additional Information Revision to Technical Specification 3.3.5, Loss of Power (LOP) Diesel Generator (DG) Start Instrumentation2019-12-0909 December 2019 Errata for Supplemental Response to Request for Additional Information Revision to Technical Specification 3.3.5, Loss of Power (LOP) Diesel Generator (DG) Start Instrumentation ET 19-0020, Supplemental Response to Request for Additional Information Revision to Technical Specification 3.3.5, Loss of Power (LOP) Diesel Generator (DG) Start Instrumentation2019-11-13013 November 2019 Supplemental Response to Request for Additional Information Revision to Technical Specification 3.3.5, Loss of Power (LOP) Diesel Generator (DG) Start Instrumentation ET 19-0019, Response to Request for Additional Information Revision to Technical Specification 3.3.5, Loss of Power (LOP) Diesel Generator (DG) Start Instrumentation.2019-09-10010 September 2019 Response to Request for Additional Information Revision to Technical Specification 3.3.5, Loss of Power (LOP) Diesel Generator (DG) Start Instrumentation. ET 19-0018, Supplement to License Amendment Request to Revise Technical Specification 3.3.5, Loss of Power (LOP) Diesel Generator (DG) Start Instrumentation.2019-08-22022 August 2019 Supplement to License Amendment Request to Revise Technical Specification 3.3.5, Loss of Power (LOP) Diesel Generator (DG) Start Instrumentation. ET 19-0014, lnserv1ce Inspection (ISI) Program Relief Request Number 14R-07, to Utilize Code Case N-513-4, Evaluation Criteria for Temporary Acceptance of Flaws in Moderate Energy Class 2 or 3 Piping Section XI, D1v1s1on 12019-08-15015 August 2019 lnserv1ce Inspection (ISI) Program Relief Request Number 14R-07, to Utilize Code Case N-513-4, Evaluation Criteria for Temporary Acceptance of Flaws in Moderate Energy Class 2 or 3 Piping Section XI, D1v1s1on 1 ET 19-0002, License Amendment Request to Revise Technical Specification 3.3.5, Loss of Power (LOP) Diesel Generator (DG) Start Instrumentation.2019-03-18018 March 2019 License Amendment Request to Revise Technical Specification 3.3.5, Loss of Power (LOP) Diesel Generator (DG) Start Instrumentation. ET 19-0008, Response to Request for Additional Information Related to Thermal Conductivity Degradation for License Amendment Request to Revise Technical Specifications to Transition to Westinghouse Core Design and Safety Analysis Including Adoption.2019-03-0505 March 2019 Response to Request for Additional Information Related to Thermal Conductivity Degradation for License Amendment Request to Revise Technical Specifications to Transition to Westinghouse Core Design and Safety Analysis Including Adoption. ET 19-0003, License Amendment Request to Revise Technical Specification 3.6.3 and Surveillance Requirement 3.6.3.1 to Remove Use of a Blind Flange2019-02-25025 February 2019 License Amendment Request to Revise Technical Specification 3.6.3 and Surveillance Requirement 3.6.3.1 to Remove Use of a Blind Flange ET 19-0001, Application to Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules, Revision 42019-01-23023 January 2019 Application to Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules, Revision 4 ET 18-0032, Operating Corporation Change of Date for Full Implementation of Open Phase Detection System2018-12-0707 December 2018 Operating Corporation Change of Date for Full Implementation of Open Phase Detection System ET 18-0035, Operating Corp., Supplemental Response to RAI for License Amendment Request to Revise Technical Specifications to Transition to Westinghouse Core Design and Safety Analysis Including Adoption of Alternative Source Term2018-12-0606 December 2018 Operating Corp., Supplemental Response to RAI for License Amendment Request to Revise Technical Specifications to Transition to Westinghouse Core Design and Safety Analysis Including Adoption of Alternative Source Term ET 18-0029, (WCGS) - Results of the Twenty First Steam Generator Tube Inservice Inspection2018-10-31031 October 2018 (WCGS) - Results of the Twenty First Steam Generator Tube Inservice Inspection ET 18-0018, Supplement to License Amendment Request to Revise Technical Specifications to Transition to Westinghouse Core Design and Safety Analysis Including Adoption of Alternative Source Term2018-06-19019 June 2018 Supplement to License Amendment Request to Revise Technical Specifications to Transition to Westinghouse Core Design and Safety Analysis Including Adoption of Alternative Source Term ET 18-0016, Response to Generic Letter 2016-01, Monitoring of Neutron Absorbing Materials in Spent Fuel Pools Request for Supplemental Information2018-05-29029 May 2018 Response to Generic Letter 2016-01, Monitoring of Neutron Absorbing Materials in Spent Fuel Pools Request for Supplemental Information ET 18-0014, Response to Request for Additional Information Regarding the License Amendment Request for Addition of New Technical Specification 3.7.20, Class 1E Electrical Equipment Air Conditioning (A/C) System.2018-05-29029 May 2018 Response to Request for Additional Information Regarding the License Amendment Request for Addition of New Technical Specification 3.7.20, Class 1E Electrical Equipment Air Conditioning (A/C) System. ET 18-0013, Relief Request Number I4R-06, Request for Relief from ASME Code Case N-729-4 for Reactor Vessel Head Penetration Nozzle Weld2018-05-0202 May 2018 Relief Request Number I4R-06, Request for Relief from ASME Code Case N-729-4 for Reactor Vessel Head Penetration Nozzle Weld ET 18-0011, (WCGS) - Guarantee of Payment of Deferred Premiums2018-04-30030 April 2018 (WCGS) - Guarantee of Payment of Deferred Premiums ET 18-0012, Operating Corp., Supplement to License Amendment Request to Revise Technical Specifications to Transition to Westinghouse Core Design and Safety Analysis Including Adoption of Alternative Source Term2018-04-19019 April 2018 Operating Corp., Supplement to License Amendment Request to Revise Technical Specifications to Transition to Westinghouse Core Design and Safety Analysis Including Adoption of Alternative Source Term ET 18-0010, Financial Protection Levels2018-03-29029 March 2018 Financial Protection Levels ET 18-0007, Supplement to License Amendment Request for Addition of New Technical Specification 3.7.20, Class 1E Electrical Equipment Air Conditioning (A/C) System.2018-02-15015 February 2018 Supplement to License Amendment Request for Addition of New Technical Specification 3.7.20, Class 1E Electrical Equipment Air Conditioning (A/C) System. ET 18-0005, Withdrawal of License Amendment Request for Revision to the Emergency Plan2018-02-0505 February 2018 Withdrawal of License Amendment Request for Revision to the Emergency Plan ET 18-0004, Supplement to License Amendment Request to Revise Technical Specifications to Transition to Westinghouse Core Design and Safety Analysis Including Adoption of Alternative Source Term2018-01-29029 January 2018 Supplement to License Amendment Request to Revise Technical Specifications to Transition to Westinghouse Core Design and Safety Analysis Including Adoption of Alternative Source Term ET 17-0025, Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specifications to Transition to Westinghouse Core Design and Safety Analyses Including Adoption of Alternative Source Term2017-11-14014 November 2017 Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specifications to Transition to Westinghouse Core Design and Safety Analyses Including Adoption of Alternative Source Term 2023-05-17
[Table view] |
Text
W LF CREEK INUCLEAR OPERATING CORPORATION Richard A. Muench Vice President Technical Services FEB 12 2002 ET 02-0002 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555
References:
- 1) Letter WM 87-0097, dated March 20, 1987, from B. D. Withers, WCNOC, to USNRC
- 2) Letter dated November 12, 1987, from USNRC to B. D. Withers, WCNOC
Subject:
Docket 50-482: Inservice Inspection Program Alternative for Limited Examination on Closure Head to Flange Weld on the Reactor Pressure Vessel, Relief Request 12R-25 Gentlemen:
In accordance with 10 CFR 50.55a(a)(3)(i), Wolf Creek Nuclear Operating Corporation (WCNOC) hereby requests Nuclear Regulatory Commission (NRC) approval for the use of an alternative to the requirements of the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code, Section Xl, Inservice Inspection Program.
Attachment I describes Relief Request 12R-25 to the WCNOC Second Interval Inservice Inspection Program Plan. This relief request is applicable to the Closure Head to flange weld on the Reactor Pressure Vessel, CH-101-101. A complete examination could not be performed on this weld due to the physical geometry of the weld joint and flange design.
During Refuel IX, a significant portion of the required volume of the subject weld was successfully examined, which would provide detection of significant patterns of degradation.
Considering the significant portion of weld coverage during Refuel IX, WCNOC proposes that performing the examinations to the fullest extent practical provides an acceptable level of quality and safety as required by 10 CFR 50.55a(a)(3)(i).
A similar relief request for the same weld for WCNOC's first ten-year interval was submitted by Reference 1 and was approved by Reference 2.
P.O. Box 411 / Burlington, KS 66839 / Phone: (620) 364-8831 An Equal Opportunity Employer M/F/HCNET
ET 02-0002 Page 2 of 2 WCNOC requests approval of this relief request by January 1, 2003. The approval date was administratively selected to allow for NRC review, but NRC approval by this date is not required to allow continued safe full power operation or to conduct a refueling outage.
Attachment II contains a list of commitments made in this letter.
If you have any questions concerning this matter, please contact me at (620) 364-4034, or Mr.
Tony Harris at (620) 364-4038.
Very truly yours, RAM/pb Attachments cc: J. N. Donohew (NRC), w/a W. D. Johnson (NRC), w/a E. W. Merschoff (NRC), w/a Senior Resident Inspector (NRC), w/a
Attachment I to ET 02-0002 Page 1 of 4 RELIEF REQUEST 12R-25 Component Identification:
Code Class: 1 Examination Category: B-A Item Number: B1.40
==
Description:==
Closure Head to Flange Weld on Reactor Pressure Vessel (RPV)
Weld Identification Number:
CH-101-101 (Closure Head)
Examination Requirements:
The Wolf Creek Nuclear Operating Corporation (WCNOC) Second Interval Inservice Inspection (ISI) Program Plan is prepared to the 1989 Edition of the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel (B&PV) Code,Section XI. In addition, the RPV is examined in accordance with the recommendations of Regulatory Guide 1.150, Revision 1 (Alternate Method). From Table IWB-2500-1, the non-destructive exams required for this weld are surface and volumetric. ASME Section XI, Figure IWB-2500-5 illustrates the required examination surface area and volume, respectively.
ASME Section V, 1989 Edition, Article 4, Paragraph T-441.3.2, specifies that the volume illustrated in Figure IWB-2500-5 be scanned by straight and angle beam techniques. The angle technique scans shall generally have nominal angles of 45 degrees and 60 degrees. The examination volume must be scanned with the angle beam search units directed both at right angles to the weld axis (perpendicular to the weld) and along the weld axis (parallel to the weld).
Relief Requested:
Pursuant to 10 CFR 50.55a(a)(3)(i) and 10 CFR 50.55a(g)(6)(i), relief is requested to conduct alternative examinations as described below.
Basis for Alternative and Relief:
Pursuant to 10 CFR 50.55a(a)(3)(i), relief is requested on the basis that a reasonable percentage of the weld has been examined using available technology and techniques.
Pursuant to 10 CFR 50.55a(g)(6)(i), relief is requested on the basis that conformance with the Code requirements is impractical. In order to achieve the Code Required examinations, the closure head would have to be redesigned and refabricated.
Background from WCNOC ISI Program, Interval I
Attachment I to ET 02-0002 Page 2 of 4 RELIEF REQUEST 12R-25 In Reference 1, the NRC evaluated WCNOC's first interval incomplete volumetric exam for the subject weld. At that time, the NRC concluded that the limited exam of the subject weld provided an acceptable level of safety and that compliance with the Code requirements would result in hardship or unusual difficulty without a compensating increase in the level of quality and safety.
WCNOC IS! Program Interval 2 100 per cent of the Code required surface exam was completed during Refuel IX with no indications recorded.
The design and configuration of the closure head to flange weld and the location of the lifting lugs prevent 100 per cent ultrasonic (UT) examination of the Code required volume for the subject weld.
Inspection Volume Coverage Summary:
The required scan path is obstructed for the entire weld length (545.5 inches) by the flange and for 24 inches by the three lifting lugs. Figure 1 provides a representation of the joint.
Due to the contour of the flange, the edge of the required adjacent base metal on the flange side of the weld is unable to be examined with 45 degree and 60 degree parallel and 0 degree scans. The amount of the Weld Required Volume (WRV) examined by these three scans is 83.8 per cent for each scan.
The 45 degree perpendicular scan was affected by both the flange location and by the location of the lifting lugs. The coverage reduction due to the flange is 6.8 per cent; due to the lifting lugs is 0.2 per cent for a total reduction of 7.0 per cent. This gives the amount of the WRV examined by the 45 degree perpendicular scan at 93.0 per cent.
The 60 degree perpendicular scan was affected by both the flange location and by the location of the lifting lugs. The coverage reduction due to the flange is 12.5 per cent; due to the lifting lugs is 0.2 per cent for a total reduction of 12.7 per cent. This gives the amount of the WRV examined by the 60 degree perpendicular scan at 87.3 per cent.
The average of the above five scans yields 86.3 per cent composite coverage.
There were no unacceptable indications noted during the performance of these examinations.
Additional Technical Considerations The WCNOC reactor pressure vessel was designed and fabricated in accordance with the stringent quality controls of ASME Section III. During fabrication, the ASME Section III required volumetric and surface examinations were performed on these specific welds with acceptable results.
Attachment I to ET 02-0002 Page 3 of 4 RELIEF REQUEST 12R-25 Based on this information, reasonable assurance of the continued inservice structural integrity of the subject welds is achieved without performing a complete Code examination. Compliance with the applicable Code requirements can only be accomplished by redesigning and re fabricating the reactor vessel. WCNOC deems this course of action impractical.
WCNOC considers that the use of the proposed alternative examinations described below will provide an acceptable level of quality and safety as required by 10 CFR 50.55a(a)(3)(i).
Proposed Alternative Examinations:
- 1) The closure head to flange weld has been examined to the fullest extent practical.
WCNOC proposes that the completed examinations be considered an acceptable alternative to the Code requirements.
- 2) Periodic System Leakage Tests per Category B-P, Table IWB-2500-1, ASME Section Xl, provide additional verification of component integrity.
Period for which Relief is Requested:
Relief is requested for the second ten-year interval of the WCNOC Inservice Inspection Program. This interval ends in 2005.
Implementation Schedule:
This relief request will be implemented within 60 days of approval.
WCNOC requests approval of this relief request by January 1, 2003.
Attachment I to ET 02-0002 Page 4 of 4 RELIEF REQUEST 12R-25 FIGURE 1 Closure Head to Flange Weld Configuration (Not to Scale) ige 1Lifting lug (3)
E~E
"-.......y D *S..................................
Volume within points ABCD represents the Code required volume.
Volume within points CDEF represents the volume obstructed by the flange to the 45 degree and 60 degree parallel and 0 degree scans.
Lines from points GH and GI show how the 45 degree and 60 degree perpendicular scans are obstructed by the flange.
Lines from points JK and JL show how the 45 degree and 60 degree perpendicular scans are obstructed by the lifting lugs.
Attachment II to ET 02-0002 Page 1 of 1 LIST OF COMMITMENTS The following table identifies those actions committed to by Wolf Creek Nuclear Operating Corporation (WCNOC) in this document. Any other statements in this submittal are provided for information purposes and are not considered to be commitments. Please direct questions regarding these commitments to Mr. Tony Harris, Manager Regulatory Affairs at Wolf Creek Generating Station, (620) 364-4038.
COMMITMENT Due Date/Event The relief request will be implemented within 60 days of approval. Within 60 days of approval of the relief request.