ENS 52039
From kanterella
Jump to navigation
Jump to search
ENS Event | |
|---|---|
08:00 Jun 24, 2016 | |
| Title | Ts Required Shutdown Due to Leaking Service Water Weld on Ccw Hx |
| Event Description | At 0400 (EDT) on June 24, 2016, Indian Point Unit 2 initiated actions to commence reactor shutdown to comply with Technical Specification (TS) LCO 3.7.7, Condition B. TS LCO 3.7.7, Condition A had been entered at 0230 on June 21, 2016 in order to repair a leaking weld on the 20 inch service water pipe to nozzle weld on the 21 Component Cooling Water Heat Exchanger (CCW HX). Condition A allows 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> to restore the inoperable CCW train to service or Condition B is entered which requires the plant to be in Mode 3 in 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and Mode 4 in 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.
The initiation of a nuclear plant shutdown required by TS requires a 4-hour report in accordance with 50.72(b)(2)(i) which is being made by this notification. The licensee notified the New York Independent System Operator and the New York Public Service Commission. The licensee notified the NRC Resident Inspector. |
| Where | |
|---|---|
| Indian Point New York (NRC Region 1) | |
| Reporting | |
| 10 CFR 50.72(b)(2)(i), Tech Spec Required Shutdown | |
| Time - Person (Reporting Time:+-3.92 h-0.163 days <br />-0.0233 weeks <br />-0.00537 months <br />) | |
| Opened: | Justin Macdonald 04:05 Jun 24, 2016 |
| NRC Officer: | Bethany Cecere |
| Last Updated: | Jun 24, 2016 |
| 52039 - NRC Website
Loading map... {"minzoom":false,"maxzoom":false,"mappingservice":"leaflet","width":"350px","height":"250px","centre":false,"title":"","label":"","icon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"zoom":6,"defzoom":14,"layers":["OpenStreetMap"],"image layers":[],"overlays":[],"resizable":false,"fullscreen":false,"scrollwheelzoom":true,"cluster":false,"clustermaxzoom":20,"clusterzoomonclick":true,"clustermaxradius":80,"clusterspiderfy":true,"geojson":"","clicktarget":"","imageLayers":[],"locations":[{"text":"\u003Cb\u003E\u003Cdiv class=\"mw-parser-output\"\u003E\u003Cp\u003E\u003Ca class=\"mw-selflink selflink\"\u003EENS 52039\u003C/a\u003E - \u003Ca href=\"/Indian_Point\" title=\"Indian Point\"\u003EIndian Point\u003C/a\u003E\n\u003C/p\u003E\u003C/div\u003E\u003C/b\u003E\u003Cdiv class=\"mw-parser-output\"\u003E\u003Cp\u003ETs Required Shutdown Due to Leaking Service Water Weld on Ccw Hx\n\u003C/p\u003E\u003C/div\u003E","title":"ENS 52039 - Indian Point\n","link":"","lat":41.26799722222222,"lon":-73.9514,"icon":"/w/images/7/79/Entergy_icon.png"}],"imageoverlays":null} | |
Unit 2 | |
|---|---|
| Reactor critical | Critical |
| Scram | No |
| Before | Power Operation (93 %) |
| After | Power Operation (92 %) |
WEEKMONTHYEARENS 535892018-09-07T04:00:0007 September 2018 04:00:00
[Table view]10 CFR 50.72(b)(3)(v)(D), Loss of Safety Function - Mitigate the Consequences of an Accident, 10 CFR 50.72(b)(2)(i), Tech Spec Required Shutdown, 10 CFR 50.72(b)(3)(ii)(A), Seriously Degraded Technical Specification Required Shutdown ENS 520392016-06-24T08:00:00024 June 2016 08:00:00 10 CFR 50.72(b)(2)(i), Tech Spec Required Shutdown Ts Required Shutdown Due to Leaking Service Water Weld on Ccw Hx ENS 507222015-01-08T12:00:0008 January 2015 12:00:00 10 CFR 50.72(b)(3)(v)(D), Loss of Safety Function - Mitigate the Consequences of an Accident, 10 CFR 50.72(b)(2)(i), Tech Spec Required Shutdown Technical Specification Required Shutdown Due to Loss of Both Channels of Refueling Water Storage Tank Instrumentation ENS 504672014-09-18T15:50:00018 September 2014 15:50:00 10 CFR 50.72(b)(2)(i), Tech Spec Required Shutdown Technical Specification Required Shutdown Due to Misaligned Control Rod ENS 478032012-04-04T09:00:0004 April 2012 09:00:00 10 CFR 50.72(b)(2)(i), Tech Spec Required Shutdown Technical Specification Required Shutdown Due to Inoperable Static Inverter ENS 473142011-10-03T07:45:0003 October 2011 07:45:00 10 CFR 50.72(b)(2)(i), Tech Spec Required Shutdown Unit 2 Entered Tech Spec 3.0.3 After Declaring All Three Containment Recirc Fan Coolers Inoperable ENS 466372011-02-22T19:25:00022 February 2011 19:25:00 10 CFR 50.72(b)(2)(i), Tech Spec Required Shutdown Technical Specification Required Shutdown Due to Service Water Piping Leak ENS 400692003-08-14T20:23:00014 August 2003 20:23:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(a)(1)(i), Emergency Class Declaration, 10 CFR 50.72(b)(3)(iv)(A), System Actuation, 10 CFR 50.72(b)(2)(i), Tech Spec Required Shutdown Unusual Event Declared Due to Loss of Offsite Power Greater than 15 Minutes. 2018-09-07T04:00:00 | |
Retrieved from "https://kanterella.com/w/index.php?title=ENS_52039&oldid=420977"