ENS 49209
ENS Event | |
|---|---|
13:55 Jul 22, 2013 | |
| Title | Potential Programmatic Breakdown of the Quality Assurance Program |
| Event Description | As a result of an extent of condition review for potential programmatic breakdown issues in response to an apparent violation 05000391/2013611-02 related to TVA's Commercial Grade Dedication Program. TVA has identified a previous Problem Evaluation Reports (PERS) that constitute significant breakdown in a portion of the Quality Assurance program. This review was initiated upon discovery of a misinterpretation of 10 CFR 50.55(e) where it was thought that to be reportable a 'significant breakdown in a portion of the Quality Assurance program' had to be associated with a confirmed substantial safety hazard.
The subject of the previous PER is as follows; On May 31, 2011, TVA identified a number of revised Drawing Revision Authorizations (DRAs) that had not been incorporated into work orders to ensure field work required by the DRA revision was implemented in the field. This condition was documented as PER 378571. TVA has concluded that a significant breakdown in a portion of the Quality Assurance program had occurred that could have produced a defect in a basic component. However, TVA has subsequently determined that no safety significance can be attributed to this condition. This issue has been resolved and PER 378571 was closed on February 19, 2013. These items are being reported in accordance with 10 CFR 50.55(e) as significant breakdown in a portion of the Quality Assurance program. The licensee has notified the NRC Resident Inspector. |
| Where | |
|---|---|
| Watts Bar Tennessee (NRC Region 2) | |
| Reporting | |
| 10 CFR 50.55(e) | |
| Time - Person (Reporting Time:+-4 h-0.167 days <br />-0.0238 weeks <br />-0.00548 months <br />) | |
| Opened: | Gordon Arent 09:55 Jul 22, 2013 |
| NRC Officer: | John Shoemaker |
| Last Updated: | Jul 22, 2013 |
| 49209 - NRC Website
Loading map... {"minzoom":false,"maxzoom":false,"mappingservice":"leaflet","width":"350px","height":"250px","centre":false,"title":"","label":"","icon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"zoom":6,"defzoom":14,"layers":["OpenStreetMap"],"image layers":[],"overlays":[],"resizable":false,"fullscreen":false,"scrollwheelzoom":true,"cluster":false,"clustermaxzoom":20,"clusterzoomonclick":true,"clustermaxradius":80,"clusterspiderfy":true,"geojson":"","clicktarget":"","imageLayers":[],"locations":[{"text":"\u003Cb\u003E\u003Cdiv class=\"mw-parser-output\"\u003E\u003Cp\u003E\u003Ca class=\"mw-selflink selflink\"\u003EENS 49209\u003C/a\u003E - \u003Ca href=\"/Watts_Bar\" title=\"Watts Bar\"\u003EWatts Bar\u003C/a\u003E\n\u003C/p\u003E\u003C/div\u003E\u003C/b\u003E\u003Cdiv class=\"mw-parser-output\"\u003E\u003Cp\u003EPotential Programmatic Breakdown of the Quality Assurance Program\n\u003C/p\u003E\u003C/div\u003E","title":"ENS 49209 - Watts Bar\n","link":"","lat":35.60199166666666,"lon":-84.7889388888889,"icon":"/w/images/c/ce/Tennessee_Valley_Authority_icon.png"}],"imageoverlays":null} | |
Unit 2 | |
|---|---|
| Reactor critical | Not Critical |
| Scram | No |
| Before | Under Construction (0 %) |
| After | Under Construction (0 %) |
WEEKMONTHYEARENS 501662014-06-03T04:00:0003 June 2014 04:00:00
[Table view]10 CFR 50.55(e) Watts Bar Unit 2 Potentially Defective Fuses Installed ENS 492092013-07-22T13:55:00022 July 2013 13:55:00 10 CFR 50.55(e) Potential Programmatic Breakdown of the Quality Assurance Program ENS 488712013-02-11T04:00:00011 February 2013 04:00:00 10 CFR 50.55(e) Instrumentation Lines Not Inspected Completely for Proper Slope ENS 486462013-01-03T14:00:0003 January 2013 14:00:00 10 CFR 50.55(e) Commercial Grade Dedication Program Degraded 2014-06-03T04:00:00 | |