ENS 49186
From kanterella
Jump to navigation
Jump to search
ENS Event | |
|---|---|
18:26 Jul 11, 2013 | |
| Title | Plant Employee Transported Offsite for Medical Treatment |
| Event Description | A Plant Vogtle employee on site complained of medical issues while performing work inside Unit 2 containment at 1127 EDT. After being transported offsite to Burke County Hospital, Plant Vogtle was notified at 1426 EDT that the individual was deceased. The [NRC] Resident Inspector has been notified.
The death was not known to be related to work performed at the site, and the employee was not contaminated when transported offsite. The licensee will notify OSHA.
The licensee notified OSHA at 1625 EDT and will also be making a media/press release. Notified R2DO (Nease). |
| Where | |
|---|---|
| Vogtle Georgia (NRC Region 2) | |
| Reporting | |
| 10 CFR 50.72(b)(2)(xi), Notification to Government Agency or News Release | |
| Time - Person (Reporting Time:+-3 h-0.125 days <br />-0.0179 weeks <br />-0.00411 months <br />) | |
| Opened: | Naveen Koteel 15:26 Jul 11, 2013 |
| NRC Officer: | Dong Park |
| Last Updated: | Jul 11, 2013 |
| 49186 - NRC Website
Loading map... {"minzoom":false,"maxzoom":false,"mappingservice":"leaflet","width":"350px","height":"250px","centre":false,"title":"","label":"","icon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"zoom":6,"defzoom":14,"layers":["OpenStreetMap"],"image layers":[],"overlays":[],"resizable":false,"fullscreen":false,"scrollwheelzoom":true,"cluster":false,"clustermaxzoom":20,"clusterzoomonclick":true,"clustermaxradius":80,"clusterspiderfy":true,"geojson":"","clicktarget":"","imageLayers":[],"locations":[{"text":"\u003Cb\u003E\u003Cdiv class=\"mw-parser-output\"\u003E\u003Cp\u003E\u003Ca class=\"mw-selflink selflink\"\u003EENS 49186\u003C/a\u003E - \u003Ca href=\"/Vogtle\" title=\"Vogtle\"\u003EVogtle\u003C/a\u003E\n\u003C/p\u003E\u003C/div\u003E\u003C/b\u003E\u003Cdiv class=\"mw-parser-output\"\u003E\u003Cp\u003EPlant Employee Transported Offsite for Medical Treatment\n\u003C/p\u003E\u003C/div\u003E","title":"ENS 49186 - Vogtle\n","link":"","lat":33.13062222222222,"lon":-81.77135277777778,"icon":"/w/images/1/14/Southern_Nuclear_icon.png"}],"imageoverlays":null} | |
Unit 1 | |
|---|---|
| Reactor critical | Critical |
| Scram | No |
| Before | Power Operation (100 %) |
| After | Power Operation (100 %) |
Unit 2 | |
|---|---|
| Reactor critical | Critical |
| Scram | No |
| Before | Power Operation (100 %) |
| After | Power Operation (100 %) |
WEEKMONTHYEARENS 566922023-08-22T21:24:00022 August 2023 21:24:00
[Table view]10 CFR 50.72(b)(2)(xi), Notification to Government Agency or News Release, 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation Manual Reactor Trip and Automatic Actuation of Auxiliary Feedwater System ENS 525182017-01-30T16:43:00030 January 2017 16:43:00 10 CFR 50.72(b)(2)(xi), Notification to Government Agency or News Release Offsite Notification Due to Onsite Fatality ENS 491862013-07-11T18:26:00011 July 2013 18:26:00 10 CFR 50.72(b)(2)(xi), Notification to Government Agency or News Release Plant Employee Transported Offsite for Medical Treatment 2023-08-22T21:24:00 | |
Retrieved from "https://kanterella.com/w/index.php?title=ENS_49186&oldid=422989"