ENS 46467
ENS Event | |
---|---|
20:04 Oct 28, 2010 | |
Title | Invalid Actuation of the "B" Emergency Service Water (Esw) Pump |
Event Description | Text provided by the licensee. Quotations omitted for readability.
Report Type: This 60-day telephone notification is being made under 10 CFR 50.73(a)(2)(iv)(A) and 10 CFR 50.73(a)(1). Description: On October 28, 2010, during the performance of MST I0073, "Train 'B' 18 Month Manual Reactor Trip, Solid State Protection System Actuation Logic & Master Relay Test", two sequential errors resulted in the inappropriate activation of the 'B' ESW pump. During night shift on October 27/28th, the Master Relay Selector Switch was not returned to the required OFF position. This caused day shift to find one of the two general warning lights to be lit. During the troubleshooting for the light, a technician discovered the Master Relay Selector Switch out of the expected OFF position as required by the procedure. A technician moved the switch to the OFF position outside of procedural guidance, resulting in the partial activation of the Reactor Protection System, including the 'B' ESW pump. The plant was in Mode 6 due to refueling outage 16 during the event. Actual plant conditions and parameters did not exist that required an automatic start of the 'B' ESW Pump. Therefore, this actuation is classified as invalid. The system started and functioned successfully. This invalid actuation was entered into the corrective action program as NCR 430289. Cause: Poor performance of task by the individual. The licensee informed the NRC Resident Inspector. |
Where | |
---|---|
Harris ![]() North Carolina (NRC Region 2) | |
Reporting | |
10 CFR 50.73(a)(1), Submit an LER, Invalid Actuation | |
Time - Person (Reporting Time:+979.78 h40.824 days <br />5.832 weeks <br />1.342 months <br />) | |
Opened: | Kimberly Bass 16:51 Dec 8, 2010 |
NRC Officer: | Steve Sandin |
Last Updated: | Dec 8, 2010 |
46467 - NRC Website
Loading map... {"minzoom":false,"maxzoom":false,"mappingservice":"leaflet","width":"350px","height":"250px","centre":false,"title":"","label":"","icon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"zoom":6,"defzoom":14,"layers":["OpenStreetMap"],"image layers":[],"overlays":[],"resizable":false,"fullscreen":false,"scrollwheelzoom":true,"cluster":false,"clustermaxzoom":20,"clusterzoomonclick":true,"clustermaxradius":80,"clusterspiderfy":true,"geojson":"","clicktarget":"","imageLayers":[],"locations":[{"text":"\u003Cb\u003E\u003Cdiv class=\"mw-parser-output\"\u003E\u003Cp\u003E\u003Ca class=\"mw-selflink selflink\"\u003EENS 46467\u003C/a\u003E - \u003Ca href=\"/Harris\" title=\"Harris\"\u003EHarris\u003C/a\u003E\n\u003C/p\u003E\u003C/div\u003E\u003C/b\u003E\u003Cdiv class=\"mw-parser-output\"\u003E\u003Cp\u003EInvalid Actuation of the \"B\" Emergency Service Water (Esw) Pump\n\u003C/p\u003E\u003C/div\u003E","title":"ENS 46467 - Harris\n","link":"","lat":35.63344166666667,"lon":-78.95586666666667,"icon":"/w/images/7/75/Duke_Energy_icon.png"}],"imageoverlays":null} | |
![]() Mar 13 Mar 20 Mar 27 Apr 3 Apr 10 Apr 17 Apr 24 May 1 May 8 May 15 May 22 May 29 Jun 5 Jun 12 Jun 19 Jun 26 Jul 3 Jul 10 Jul 17 Jul 24 Jul 31 Aug 7 Aug 14 Aug 21 Aug 28 Sep 4 Sep 11 Sep 18 Sep 25 ![]() Apr May Jun Jul Aug Sep Oct Nov Dec 2011 Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec 2012 Feb Mar Apr May Jun Jul Aug 1997 1998 1999 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 ![]() | |