At 1700 on 12/10/09, an operability evaluation determined that an instrument line within the
primary containment did not have adequate structural support during the previous operating cycle. The evaluation determined that the instrument line would have failed during a
Safe Shutdown Earthquake (
SSE). This would have resulted in
reactor coolant leakage within the
primary containment that could not be isolated.
The condition was identified and repaired during the recent refueling outage and full qualification and operability was restored prior to return to service.
The condition was discovered on November 3, 2009 during the Unit 2 refueling outage. The
operability determination was completed on December 10, 2009. It is unknown at this time if the condition exists in Unit 3 due to inaccessibility of the drywell during power operations.