On May 25, 2009, at 1615, a Unit 3 control fuse failed open causing multiple containment isolation valves for the atmospheric sampling system and containment ventilation/purge systems to close on a loss of power to the logic system. No actual valid containment isolation signals were received or processed by the containment isolation logic. Since this was an invalid signal, a telephone notification to the NRC Operations Center may be provided within 60 days after discovery of the event instead of submitting a written Licensee Event Report. [10 CFR 50.73(a)(2)(iv)(A)].
This phone notification is being made in lieu of a written 60 day LER as allowed in 10 CFR 50.73(a)(1) to report the invalid actuation of multiple containment isolation valves that occurred as described above. The fuse is associated with the inboard containment isolation logic. This is considered a partial actuation and all components operated as expected. Troubleshooting identified that a relay failed and, in turn, had caused the fuse to open. The relay and fuse were replaced and the systems restored to their normal lineup. The NRC Resident has been informed that this notification is being made.
No further notifications or reports will be issued.